Install EV Chargers in Gorham, New Hampshire

Install EV chargers or analyze a site in Gorham, New Hampshire. 11 existing public charging locations (4 DC fast, 7 Level 2). Free 0–100 profitability score on any Gorham address from EV Data Map by Charge Rigs.

Gorham, New Hampshire is served by 11 public electric vehicle charging locations operating 21 individual chargers — an average of 1.9 chargers per site. Of those locations, 4 (36%) offer DC fast charging suitable for road-trip stops and short-dwell sessions, while 7 (64%) provide Level 2 charging for longer dwell times such as workplace, retail and overnight parking.

The largest charging network in Gorham is Non-Networked with 4 locations, followed by ChargePoint Network with 3. Average DC fast power across the city is approximately 154 kW, which puts most fast-charging stalls in the modern 150 kW–350 kW class capable of delivering a meaningful state-of-charge top-up in 15–30 minutes for a typical EV.

EV Data Map is an EVSE and DC Fast Charger location analyzer that scores every potential charging site in the United States from 0 to 100 for DC Fast Charger ROI, combining EV ownership density, daytime population, traffic, demographics, nearby competing chargers, dwell-time characteristics of surrounding land use, and grid capacity. Use the analyzer below to enter any address in Gorham and receive an instant ROI score, demand projection, and recommended charger configuration.

What to know about charging in Gorham

Gorham, New Hampshire boasts a robust public charging infrastructure with a diverse array of operators across its 11 locations, where competition fosters advantageous pricing and uptime for users. With 36% of these sites offering DC fast charging and an impressive average output of 154 kW—peaking at 325 kW—drivers can find high-power options that cater to their charging needs. The presence of six distinct networks ensures that users can select charging solutions based on their specific power requirements and amenities, rather than being confined to a single brand. Additionally, half of the DC fast locations operate at 150 kW or higher, positioning Gorham as a competitive hub in the region.

Gorham charging by the numbers

Locations
11
Chargers
21
DC Fast locations
4
Level 2 locations
7

DC fast share: 36% of locations. Level 2 share: 64%. Average chargers per site: 1.9. Average DC fast power: 154 kW.

Gorham charging — local snapshot

Top operator share
Non-Networked runs 36% of public locations across 6 networks.
Average DC fast power
154 kW (fastest stall: 325 kW)
High-power share
50% of DC fast sites are 150 kW-class or higher
Mix
36% DC fast / 64% Level 2 across 11 locations
Estimated DC ports
8 fast-charging ports city-wide

Charging networks in Gorham

The following operators run public charging in Gorham, ranked by number of locations.

Featured charging locations in Gorham

A selection of higher-power public charging locations across Gorham, sorted by power level.

  1. Eastern Depot Restaurant - Tesla Supercharger (Citgo) — Gorham, NH, 03581 (Tesla · DC Fast · 325 kW)
  2. Ecodrive Auto Group — Gorham, NH, 03581 (RED_E · DC Fast · 180 kW)
  3. ECODRIVE BCAG 3 — Gorham, NH, 03581 (ChargePoint Network · DC Fast · 62.5 kW)
  4. Berlin City Chevrolet — GORHAM, NH, 03581 (EV Connect · DC Fast · 50 kW)
  5. ECODRIVE ECODRIVE EV2 — Gorham, NH, 03581 (ChargePoint Network · Level 2 · 12 kW)
  6. Mt. Washington Auto Road - Tesla Destination — Gorham, NH, 03581 (Tesla Destination · Level 2 · 7.2 kW)
  7. The Glen House — Gorham, NH, 03581 (Non-Networked · Level 2 · 7.2 kW)
  8. Top Notch Inn — Gorham, NH, 03581 (Non-Networked · Level 2 · 7.2 kW)
  9. Berlin City Nissan — Gorham, NH, 03581 (Non-Networked · Level 2 · 7.2 kW)
  10. Appalachian Mountain Club - Pinkham Notch Visitor Center — Gorham, NH, 03581 (Non-Networked · Level 2 · 7.2 kW)
  11. ECODRIVE ECODRIVE EV1 — Gorham, NH, 03581 (ChargePoint Network · Level 2 · 6.5 kW)

Nearby cities with EV charging coverage

Other cities in New Hampshire we cover with full charging data and site profitability scoring — useful for comparing footprints across the state.

How profitability scores work

Every score on EV Data Map blends location demand, competition and operating economics into a single 0–100 number. Demand is modeled from registered EV count, commute and through-traffic patterns, daytime worker population, retail and hospitality footprint, and tourism inflows. Competition uses the count and quality of nearby existing chargers — including DC fast power, network reliability and dwell-fit. Operating economics include estimated electricity tariffs, demand-charge exposure, expected utilization, and capital cost for the recommended hardware mix.

For Gorham specifically, our model accounts for local commute corridors, nearby interstate and US-highway traffic, the existing footprint of 4 DC fast and 7 Level 2 sites, and the typical dwell profile of the surrounding land use. The result is a per-address score plus a recommended configuration — number of stalls, target power level and network — that maximises projected revenue.

Frequently asked questions

How many EV charging stations are in Gorham, New Hampshire?
There are 11 public electric vehicle charging locations in Gorham, New Hampshire, with a combined 21 individual chargers. 4 locations offer DC fast charging and 7 provide Level 2 charging.
What is the largest EV charging network in Gorham?
Non-Networked operates the most public charging locations in Gorham with 4 sites, followed by ChargePoint Network with 3 sites.
How much does it cost to install an EV charger in Gorham?
Level 2 EV chargers in Gorham typically install for $4,000–$12,000 per port including make-ready. DC fast installs run $80,000–$250,000+ per port depending on power level, utility upgrades and trenching.
What permits and incentives apply to EV chargers in Gorham?
Most Gorham projects need an electrical permit (and a building permit plus utility coordination for DC fast). Sites can typically stack the federal 30C tax credit (up to 30% / $100,000 per commercial charger in eligible census tracts) with New Hampshire state, utility and NEVI-funded programs.
How long does it take to install an EV charger in Gorham?
A typical commercial Level 2 installation in Gorham energizes in 4–8 weeks from site survey. DC fast installs run 4–9 months because of utility service upgrades, transformer lead times and switchgear.
How long does an EV charger in Gorham take to become profitable?
Payback in Gorham depends on utilization, electricity tariffs (especially demand charges) and incentives captured. Well-sited Level 2 stations typically reach payback in 3–5 years; DC fast sites with strong throughput in 3–6 years.