Install EV chargers or analyze a site in Albuquerque, New Mexico. 149 existing public charging locations (30 DC fast, 119 Level 2). Free 0–100 profitability score on any Albuquerque address from EV Data Map by Charge Rigs.
Albuquerque, New Mexico is served by 149 public electric vehicle charging locations operating 345 individual chargers — an average of 2.3 chargers per site. Of those locations, 30 (20%) offer DC fast charging suitable for road-trip stops and short-dwell sessions, while 119 (80%) provide Level 2 charging for longer dwell times such as workplace, retail and overnight parking.
The largest charging network in Albuquerque is ChargePoint Network with 104 locations, followed by Blink Network with 11. Average DC fast power across the city is approximately 190 kW, which puts most fast-charging stalls in the modern 150 kW–350 kW class capable of delivering a meaningful state-of-charge top-up in 15–30 minutes for a typical EV.
EV Data Map is an EVSE and DC Fast Charger location analyzer that scores every potential charging site in the United States from 0 to 100 for DC Fast Charger ROI, combining EV ownership density, daytime population, traffic, demographics, nearby competing chargers, dwell-time characteristics of surrounding land use, and grid capacity. Use the analyzer below to enter any address in Albuquerque and receive an instant ROI score, demand projection, and recommended charger configuration.
What to know about charging in Albuquerque
Albuquerque's charging landscape is notably influenced by ChargePoint Network, operating 70% of the 149 public charging locations, which underscores its significance in network reliability and pricing strategies for new entrants. With 30 DC fast charging stations averaging 190 kW and a premier stall at 350 kW, the city's infrastructure supports quick traverses to meet growing demand. A remarkable 70% of these fast chargers are 150 kW-class or higher, positioning Albuquerque uniquely in a competitive market. The combination of robust DC fast options alongside extensive Level 2 charging caters to a diverse range of EV users, creating opportunities for site developers to strategically fill any identified gaps in service amid the existing network's strengths.
Albuquerque charging by the numbers
Locations
149
Chargers
345
DC Fast locations
30
Level 2 locations
119
DC fast share: 20% of locations. Level 2 share: 80%. Average chargers per site: 2.3. Average DC fast power: 190 kW.
Albuquerque charging — local snapshot
Top operator share
ChargePoint Network runs 70% of public locations across 12 networks.
Average DC fast power
190 kW (fastest stall: 350 kW)
High-power share
70% of DC fast sites are 150 kW-class or higher
Mix
20% DC fast / 80% Level 2 across 149 locations
Estimated DC ports
113 fast-charging ports city-wide
Charging networks in Albuquerque
The following operators run public charging in Albuquerque, ranked by number of locations.
ChargePoint Network — 104 locations
Blink Network — 11 locations
Non-Networked — 11 locations
Tesla Destination — 8 locations
Electrify America — 3 locations
Tesla — 3 locations
RED_E — 3 locations
eVgo Network — 2 locations
Featured charging locations in Albuquerque
A selection of higher-power public charging locations across Albuquerque, sorted by power level.
Kroger Smiths 443 (Albuquerque, NM) — Albuquerque, NM, 87106 (Electrify America · DC Fast · 350 kW)
Simon ABQ Uptown (Albuquerque, NM) — Albuquerque, NM, 87110 (Electrify America · DC Fast · 350 kW)
Walmart 850 (Albuquerque, NM) — Albuquerque, NM, 87107 (Electrify America · DC Fast · 350 kW)
Flying J 689 — Albuquerque, NM, 87105 (eVgo Network · DC Fast · 350 kW)
Siesta Hills — Albuquerque, NM, 87108 (eVgo Network · DC Fast · 350 kW)
Albuquerque, NM — Albuquerque, NM, 87110 (RIVIAN_ADVENTURE · DC Fast · 300 kW)
NMDOT NMDOT3 EV#3 — Albuquerque, NM, 87109 (ChargePoint Network · DC Fast · 250 kW)
NMDOT NMDOT3 EV#4 — Albuquerque, NM, 87109 (ChargePoint Network · DC Fast · 250 kW)
Albuquerque, NM - Lang Avenue Northeast - Tesla Supercharger — Albuquerque, NM, 87109 (Tesla · DC Fast · 250 kW)
ABQ Uptown Mall - Tesla Supercharger — Albuquerque, NM, 87110 (Tesla · DC Fast · 250 kW)
FasCharge 4616 FastMarket Edith Blvd NM — Albuquerque, NM, 87107 (RED_E · DC Fast · 240 kW)
Power Ford — Albuquerque, NM, 87107 (FORD_CHARGE · DC Fast · 240 kW)
Nearby cities with EV charging coverage
Other cities in New Mexico we cover with full charging data and site profitability scoring — useful for comparing footprints across the state.
Every score on EV Data Map blends location demand, competition and operating economics into a single 0–100 number. Demand is modeled from registered EV count, commute and through-traffic patterns, daytime worker population, retail and hospitality footprint, and tourism inflows. Competition uses the count and quality of nearby existing chargers — including DC fast power, network reliability and dwell-fit. Operating economics include estimated electricity tariffs, demand-charge exposure, expected utilization, and capital cost for the recommended hardware mix.
For Albuquerque specifically, our model accounts for local commute corridors, nearby interstate and US-highway traffic, the existing footprint of 30 DC fast and 119 Level 2 sites, and the typical dwell profile of the surrounding land use. The result is a per-address score plus a recommended configuration — number of stalls, target power level and network — that maximises projected revenue.
Frequently asked questions
How many EV charging stations are in Albuquerque, New Mexico?
There are 149 public electric vehicle charging locations in Albuquerque, New Mexico, with a combined 345 individual chargers. 30 locations offer DC fast charging and 119 provide Level 2 charging.
What is the largest EV charging network in Albuquerque?
ChargePoint Network operates the most public charging locations in Albuquerque with 104 sites, followed by Blink Network with 11 sites.
How much does it cost to install an EV charger in Albuquerque?
Level 2 EV chargers in Albuquerque typically install for $4,000–$12,000 per port including make-ready. DC fast installs run $80,000–$250,000+ per port depending on power level, utility upgrades and trenching.
What permits and incentives apply to EV chargers in Albuquerque?
Most Albuquerque projects need an electrical permit (and a building permit plus utility coordination for DC fast). Sites can typically stack the federal 30C tax credit (up to 30% / $100,000 per commercial charger in eligible census tracts) with New Mexico state, utility and NEVI-funded programs.
How long does it take to install an EV charger in Albuquerque?
A typical commercial Level 2 installation in Albuquerque energizes in 4–8 weeks from site survey. DC fast installs run 4–9 months because of utility service upgrades, transformer lead times and switchgear.
How long does an EV charger in Albuquerque take to become profitable?
Payback in Albuquerque depends on utilization, electricity tariffs (especially demand charges) and incentives captured. Well-sited Level 2 stations typically reach payback in 3–5 years; DC fast sites with strong throughput in 3–6 years.