Install EV Chargers in Baldwinsville, New York

Install EV chargers or analyze a site in Baldwinsville, New York. 27 existing public charging locations (2 DC fast, 25 Level 2). Free 0–100 profitability score on any Baldwinsville address from EV Data Map by Charge Rigs.

Baldwinsville, New York is served by 27 public electric vehicle charging locations operating 122 individual chargers — an average of 4.5 chargers per site. Of those locations, 2 (7%) offer DC fast charging suitable for road-trip stops and short-dwell sessions, while 25 (93%) provide Level 2 charging for longer dwell times such as workplace, retail and overnight parking.

The largest charging network in Baldwinsville is VIALYNK with 20 locations, followed by ChargePoint Network with 4. Average DC fast power across the city is approximately 166 kW, which puts most fast-charging stalls in the modern 150 kW–350 kW class capable of delivering a meaningful state-of-charge top-up in 15–30 minutes for a typical EV.

EV Data Map is an EVSE and DC Fast Charger location analyzer that scores every potential charging site in the United States from 0 to 100 for DC Fast Charger ROI, combining EV ownership density, daytime population, traffic, demographics, nearby competing chargers, dwell-time characteristics of surrounding land use, and grid capacity. Use the analyzer below to enter any address in Baldwinsville and receive an instant ROI score, demand projection, and recommended charger configuration.

What to know about charging in Baldwinsville

Baldwinsville, New York, features a robust charging landscape dominated by VIALYNK, which operates 74% of the city's 27 public charging locations. This strong presence ensures consistent reliability and performance for EV drivers, but it also indicates that new site developers may contend with competition from a well-established operator. The city's two DC fast charging stations, each rated at 150 kW or above, present an appealing option for fast recharging, complemented by a significant Level 2 network managing longer dwell times. With only 7% of public charging locations classified as DC fast, there’s an opportunity for new entrants to strategically position high-power chargers around Baldwinsville, especially considering the increasing driver demand for faster charging solutions.

Baldwinsville charging by the numbers

Locations
27
Chargers
122
DC Fast locations
2
Level 2 locations
25

DC fast share: 7% of locations. Level 2 share: 93%. Average chargers per site: 4.5. Average DC fast power: 166 kW.

Baldwinsville charging — local snapshot

Top operator share
VIALYNK runs 74% of public locations across 5 networks.
Average DC fast power
166 kW (fastest stall: 180 kW)
High-power share
100% of DC fast sites are 150 kW-class or higher
Mix
7% DC fast / 93% Level 2 across 27 locations
Estimated DC ports
10 fast-charging ports city-wide

Charging networks in Baldwinsville

The following operators run public charging in Baldwinsville, ranked by number of locations.

Featured charging locations in Baldwinsville

A selection of higher-power public charging locations across Baldwinsville, sorted by power level.

  1. Chevrolet of Baldwinsville L3's — Baldwinsville, NY, 13027 (FLIPTURN · DC Fast · 180 kW)
  2. Aldi Baldwinsville TUL40 — Baldwinsville, NY, 13027 (RED_E · DC Fast · 151 kW)
  3. Candlewood Gardens — Baldwinsville, NY, 13027 (VIALYNK · Level 2 · 11.5 kW)
  4. Microtel Inn & Suites-Baldwinsville — Baldwinsville, NY, 13027 (CHARGESMART_EV · Level 2 · 9.6 kW)
  5. Greymoor Way - Building 14 — Baldwinsville, NY, 13027 (VIALYNK · Level 2 · 6.7 kW)
  6. Village Green Apartments - 600s — Baldwinsville, NY, 13027 (VIALYNK · Level 2 · 6.7 kW)
  7. Greymoor Way - Building 7 — Baldwinsville, NY, 13027 (VIALYNK · Level 2 · 6.7 kW)
  8. Greymoor Way - Building 1 — Baldwinsville, NY, 13027 (VIALYNK · Level 2 · 6.7 kW)
  9. Greymoor Way - Building 13A — Baldwinsville, NY, 13027 (VIALYNK · Level 2 · 6.7 kW)
  10. Greymoor Way - Building 2 — Baldwinsville, NY, 13027 (VIALYNK · Level 2 · 6.7 kW)
  11. Timber Banks - East — Baldwinsville, NY, 13027 (VIALYNK · Level 2 · 6.7 kW)
  12. Greymoor Way - Building 8 — Baldwinsville, NY, 13027 (VIALYNK · Level 2 · 6.7 kW)

Nearby cities with EV charging coverage

Other cities in New York we cover with full charging data and site profitability scoring — useful for comparing footprints across the state.

How profitability scores work

Every score on EV Data Map blends location demand, competition and operating economics into a single 0–100 number. Demand is modeled from registered EV count, commute and through-traffic patterns, daytime worker population, retail and hospitality footprint, and tourism inflows. Competition uses the count and quality of nearby existing chargers — including DC fast power, network reliability and dwell-fit. Operating economics include estimated electricity tariffs, demand-charge exposure, expected utilization, and capital cost for the recommended hardware mix.

For Baldwinsville specifically, our model accounts for local commute corridors, nearby interstate and US-highway traffic, the existing footprint of 2 DC fast and 25 Level 2 sites, and the typical dwell profile of the surrounding land use. The result is a per-address score plus a recommended configuration — number of stalls, target power level and network — that maximises projected revenue.

Frequently asked questions

How many EV charging stations are in Baldwinsville, New York?
There are 27 public electric vehicle charging locations in Baldwinsville, New York, with a combined 122 individual chargers. 2 locations offer DC fast charging and 25 provide Level 2 charging.
What is the largest EV charging network in Baldwinsville?
VIALYNK operates the most public charging locations in Baldwinsville with 20 sites, followed by ChargePoint Network with 4 sites.
How much does it cost to install an EV charger in Baldwinsville?
Level 2 EV chargers in Baldwinsville typically install for $4,000–$12,000 per port including make-ready. DC fast installs run $80,000–$250,000+ per port depending on power level, utility upgrades and trenching.
What permits and incentives apply to EV chargers in Baldwinsville?
Most Baldwinsville projects need an electrical permit (and a building permit plus utility coordination for DC fast). Sites can typically stack the federal 30C tax credit (up to 30% / $100,000 per commercial charger in eligible census tracts) with New York state, utility and NEVI-funded programs.
How long does it take to install an EV charger in Baldwinsville?
A typical commercial Level 2 installation in Baldwinsville energizes in 4–8 weeks from site survey. DC fast installs run 4–9 months because of utility service upgrades, transformer lead times and switchgear.
How long does an EV charger in Baldwinsville take to become profitable?
Payback in Baldwinsville depends on utilization, electricity tariffs (especially demand charges) and incentives captured. Well-sited Level 2 stations typically reach payback in 3–5 years; DC fast sites with strong throughput in 3–6 years.