Install EV Chargers in Auburn, New York

Install EV chargers or analyze a site in Auburn, New York. 16 existing public charging locations (2 DC fast, 14 Level 2). Free 0–100 profitability score on any Auburn address from EV Data Map by Charge Rigs.

Auburn, New York is served by 16 public electric vehicle charging locations operating 49 individual chargers — an average of 3.1 chargers per site. Of those locations, 2 (13%) offer DC fast charging suitable for road-trip stops and short-dwell sessions, while 14 (88%) provide Level 2 charging for longer dwell times such as workplace, retail and overnight parking.

The largest charging network in Auburn is ChargePoint Network with 7 locations, followed by Non-Networked with 3. Average DC fast power across the city is approximately 145 kW, which puts most fast-charging stalls in the modern 150 kW–350 kW class capable of delivering a meaningful state-of-charge top-up in 15–30 minutes for a typical EV.

EV Data Map is an EVSE and DC Fast Charger location analyzer that scores every potential charging site in the United States from 0 to 100 for DC Fast Charger ROI, combining EV ownership density, daytime population, traffic, demographics, nearby competing chargers, dwell-time characteristics of surrounding land use, and grid capacity. Use the analyzer below to enter any address in Auburn and receive an instant ROI score, demand projection, and recommended charger configuration.

What to know about charging in Auburn

Auburn features a uniquely competitive public charging landscape, boasting 16 locations across five distinct operators, with ChargePoint Network leading at 44% market share. This diversity promotes competitive pricing and site availability, encouraging drivers to choose charging stations based on power and amenities rather than brand loyalty. The city's two DC fast charging sites provide an average power output of 145 kW, with half of these stations classified at 150 kW or higher, ensuring efficient charging options for users. With a notable 13% of the public charging footprint dedicated to DC fast options and an evolving landscape receptive to higher-output hardware, Auburn presents an appealing environment for EV drivers looking to optimize their charging experience.

Auburn charging by the numbers

Locations
16
Chargers
49
DC Fast locations
2
Level 2 locations
14

DC fast share: 13% of locations. Level 2 share: 88%. Average chargers per site: 3.1. Average DC fast power: 145 kW.

Auburn charging — local snapshot

Top operator share
ChargePoint Network runs 44% of public locations across 5 networks.
Average DC fast power
145 kW (fastest stall: 240 kW)
High-power share
50% of DC fast sites are 150 kW-class or higher
Mix
13% DC fast / 87% Level 2 across 16 locations
Estimated DC ports
9 fast-charging ports city-wide

Charging networks in Auburn

The following operators run public charging in Auburn, ranked by number of locations.

Featured charging locations in Auburn

A selection of higher-power public charging locations across Auburn, sorted by power level.

  1. Holiday Inn - Auburn — Auburn, NY, 13021 (CHARGESMART_EV · DC Fast · 240 kW)
  2. GM - Auburn Chevrolet GMC — Auburn, NY, 13021 (EV Connect · DC Fast · 50 kW)
  3. Holiday Inn - Auburn L2 — Auburn, NY, 13021 (CHARGESMART_EV · Level 2 · 19.2 kW)
  4. Olympia Terrace — Auburn, NY, 13021 (VIALYNK · Level 2 · 11.5 kW)
  5. Prison City Brewing — Auburn, NY, 13021 (VIALYNK · Level 2 · 7.7 kW)
  6. Lebrun Nissan — Auburn, NY, 13021 (Non-Networked · Level 2 · 7.2 kW)
  7. Bidleman Ford — Auburn, NY, 13021 (Non-Networked · Level 2 · 7.2 kW)
  8. New Hope Mills Cafe & Store — Auburn, NY, 13021 (Non-Networked · Level 2 · 7.2 kW)
  9. Inn at the Finger Lakes — Auburn, NY, 13021 (VIALYNK · Level 2 · 6.7 kW)
  10. PARKING GARAGE1 PARKING GARAGE — Auburn, NY, 13021 (ChargePoint Network · Level 2 · 6.5 kW)
  11. FOX CDJR STATION 2 — Auburn, NY, 13021 (ChargePoint Network · Level 2 · 6.5 kW)
  12. FOX CDJR STATION1 L2 HWY — Auburn, NY, 13021 (ChargePoint Network · Level 2 · 6.5 kW)

Nearby cities with EV charging coverage

Other cities in New York we cover with full charging data and site profitability scoring — useful for comparing footprints across the state.

How profitability scores work

Every score on EV Data Map blends location demand, competition and operating economics into a single 0–100 number. Demand is modeled from registered EV count, commute and through-traffic patterns, daytime worker population, retail and hospitality footprint, and tourism inflows. Competition uses the count and quality of nearby existing chargers — including DC fast power, network reliability and dwell-fit. Operating economics include estimated electricity tariffs, demand-charge exposure, expected utilization, and capital cost for the recommended hardware mix.

For Auburn specifically, our model accounts for local commute corridors, nearby interstate and US-highway traffic, the existing footprint of 2 DC fast and 14 Level 2 sites, and the typical dwell profile of the surrounding land use. The result is a per-address score plus a recommended configuration — number of stalls, target power level and network — that maximises projected revenue.

Frequently asked questions

How many EV charging stations are in Auburn, New York?
There are 16 public electric vehicle charging locations in Auburn, New York, with a combined 49 individual chargers. 2 locations offer DC fast charging and 14 provide Level 2 charging.
What is the largest EV charging network in Auburn?
ChargePoint Network operates the most public charging locations in Auburn with 7 sites, followed by Non-Networked with 3 sites.
How much does it cost to install an EV charger in Auburn?
Level 2 EV chargers in Auburn typically install for $4,000–$12,000 per port including make-ready. DC fast installs run $80,000–$250,000+ per port depending on power level, utility upgrades and trenching.
What permits and incentives apply to EV chargers in Auburn?
Most Auburn projects need an electrical permit (and a building permit plus utility coordination for DC fast). Sites can typically stack the federal 30C tax credit (up to 30% / $100,000 per commercial charger in eligible census tracts) with New York state, utility and NEVI-funded programs.
How long does it take to install an EV charger in Auburn?
A typical commercial Level 2 installation in Auburn energizes in 4–8 weeks from site survey. DC fast installs run 4–9 months because of utility service upgrades, transformer lead times and switchgear.
How long does an EV charger in Auburn take to become profitable?
Payback in Auburn depends on utilization, electricity tariffs (especially demand charges) and incentives captured. Well-sited Level 2 stations typically reach payback in 3–5 years; DC fast sites with strong throughput in 3–6 years.