Install EV Chargers in Manlius, New York

Install EV chargers or analyze a site in Manlius, New York. 10 existing public charging locations (0 DC fast, 10 Level 2). Free 0–100 profitability score on any Manlius address from EV Data Map by Charge Rigs.

Manlius, New York is served by 10 public electric vehicle charging locations operating 42 individual chargers — an average of 4.2 chargers per site. Of those locations, 0 (0%) offer DC fast charging suitable for road-trip stops and short-dwell sessions, while 10 (100%) provide Level 2 charging for longer dwell times such as workplace, retail and overnight parking.

The largest charging network in Manlius is VIALYNK with 7 locations, followed by ChargePoint Network with 2. Average DC fast power across the city is approximately 0 kW, which puts most fast-charging stalls in the modern 150 kW–350 kW class capable of delivering a meaningful state-of-charge top-up in 15–30 minutes for a typical EV.

EV Data Map is an EVSE and DC Fast Charger location analyzer that scores every potential charging site in the United States from 0 to 100 for DC Fast Charger ROI, combining EV ownership density, daytime population, traffic, demographics, nearby competing chargers, dwell-time characteristics of surrounding land use, and grid capacity. Use the analyzer below to enter any address in Manlius and receive an instant ROI score, demand projection, and recommended charger configuration.

What to know about charging in Manlius

Manlius, New York, offers a unique landscape for EV charging, characterized by a complete absence of DC fast charging options, as all 10 public locations are exclusively Level 2 chargers operated mainly by VIALYNK. This reliance on a single operator at 70% of the sites underscores a significant opportunity for new developers, as the current infrastructure leaves local drivers unable to find quick charging solutions. With no fast-charging stations in the city, there is a distinct demand for more versatile options that cater to drivers seeking swift top-ups. Analyzing the existing network alongside the surrounding areas could reveal strategic gaps for potential EV charging services, setting the stage for future growth in Manlius.

Manlius charging by the numbers

Locations
10
Chargers
42
DC Fast locations
0
Level 2 locations
10

DC fast share: 0% of locations. Level 2 share: 100%. Average chargers per site: 4.2. Average DC fast power: 0 kW.

Manlius charging — local snapshot

Top operator share
VIALYNK runs 70% of public locations across 3 networks.
Mix
0% DC fast / 100% Level 2 across 10 locations

Charging networks in Manlius

The following operators run public charging in Manlius, ranked by number of locations.

Featured charging locations in Manlius

A selection of higher-power public charging locations across Manlius, sorted by power level.

  1. Carriage House East — Manlius, NY, 13104 (RED_E · Level 2 · 9.6 kW)
  2. 212 FAYETTE STATION 2 — Manlius, NY, 13104 (ChargePoint Network · Level 2 · 7.7 kW)
  3. 212 FAYETTE STATION 1 — Manlius, NY, 13104 (ChargePoint Network · Level 2 · 7.7 kW)
  4. Manlius Academy North — Manlius, NY, 13104 (VIALYNK · Level 2 · 6.7 kW)
  5. Suburban Park Apartments Building 210 — Manlius, NY, 13104 (VIALYNK · Level 2 · 6.7 kW)
  6. Suburban Park Apartments Building 225 — Manlius, NY, 13104 (VIALYNK · Level 2 · 6.7 kW)
  7. Suburban Park Apartments Building 104 — Manlius, NY, 13104 (VIALYNK · Level 2 · 6.7 kW)
  8. Suburban Park Apartments Building 200 — Manlius, NY, 13104 (VIALYNK · Level 2 · 6.7 kW)
  9. Suburban Park Apartments Building 113 — Manlius, NY, 13104 (VIALYNK · Level 2 · 6.7 kW)
  10. Manlius Academy South — Manlius, NY, 13104 (VIALYNK · Level 2 · 6.7 kW)

Nearby cities with EV charging coverage

Other cities in New York we cover with full charging data and site profitability scoring — useful for comparing footprints across the state.

How profitability scores work

Every score on EV Data Map blends location demand, competition and operating economics into a single 0–100 number. Demand is modeled from registered EV count, commute and through-traffic patterns, daytime worker population, retail and hospitality footprint, and tourism inflows. Competition uses the count and quality of nearby existing chargers — including DC fast power, network reliability and dwell-fit. Operating economics include estimated electricity tariffs, demand-charge exposure, expected utilization, and capital cost for the recommended hardware mix.

For Manlius specifically, our model accounts for local commute corridors, nearby interstate and US-highway traffic, the existing footprint of 0 DC fast and 10 Level 2 sites, and the typical dwell profile of the surrounding land use. The result is a per-address score plus a recommended configuration — number of stalls, target power level and network — that maximises projected revenue.

Frequently asked questions

How many EV charging stations are in Manlius, New York?
There are 10 public electric vehicle charging locations in Manlius, New York, with a combined 42 individual chargers. 0 locations offer DC fast charging and 10 provide Level 2 charging.
What is the largest EV charging network in Manlius?
VIALYNK operates the most public charging locations in Manlius with 7 sites, followed by ChargePoint Network with 2 sites.
How much does it cost to install an EV charger in Manlius?
Level 2 EV chargers in Manlius typically install for $4,000–$12,000 per port including make-ready. DC fast installs run $80,000–$250,000+ per port depending on power level, utility upgrades and trenching.
What permits and incentives apply to EV chargers in Manlius?
Most Manlius projects need an electrical permit (and a building permit plus utility coordination for DC fast). Sites can typically stack the federal 30C tax credit (up to 30% / $100,000 per commercial charger in eligible census tracts) with New York state, utility and NEVI-funded programs.
How long does it take to install an EV charger in Manlius?
A typical commercial Level 2 installation in Manlius energizes in 4–8 weeks from site survey. DC fast installs run 4–9 months because of utility service upgrades, transformer lead times and switchgear.
How long does an EV charger in Manlius take to become profitable?
Payback in Manlius depends on utilization, electricity tariffs (especially demand charges) and incentives captured. Well-sited Level 2 stations typically reach payback in 3–5 years; DC fast sites with strong throughput in 3–6 years.