Install EV Chargers in Saint James, New York

Install EV chargers or analyze a site in Saint James, New York. 11 existing public charging locations (6 DC fast, 5 Level 2). Free 0–100 profitability score on any Saint James address from EV Data Map by Charge Rigs.

Saint James, New York is served by 11 public electric vehicle charging locations operating 17 individual chargers — an average of 1.5 chargers per site. Of those locations, 6 (55%) offer DC fast charging suitable for road-trip stops and short-dwell sessions, while 5 (45%) provide Level 2 charging for longer dwell times such as workplace, retail and overnight parking.

The largest charging network in Saint James is ChargePoint Network with 10 locations, followed by Blink Network with 1. Average DC fast power across the city is approximately 36 kW, which puts most fast-charging stalls in the modern 150 kW–350 kW class capable of delivering a meaningful state-of-charge top-up in 15–30 minutes for a typical EV.

EV Data Map is an EVSE and DC Fast Charger location analyzer that scores every potential charging site in the United States from 0 to 100 for DC Fast Charger ROI, combining EV ownership density, daytime population, traffic, demographics, nearby competing chargers, dwell-time characteristics of surrounding land use, and grid capacity. Use the analyzer below to enter any address in Saint James and receive an instant ROI score, demand projection, and recommended charger configuration.

What to know about charging in Saint James

In Saint James, New York, public EV charging is largely shaped by the dominance of ChargePoint Network, which operates 91% of the city’s 11 charging locations. With 55% classified as DC fast chargers, the average power output of 36 kW reflects an older generation of charging infrastructure; only one site reaches 63 kW, and none meet the modern 150 kW threshold. This lack of high-powered options could influence EV drivers' charging decisions when using navigation apps, creating an opportunity for new entrants offering faster solutions. Additionally, the split between DC fast and Level 2 chargers highlights a blend of needs, with around 9 fast ports catering particularly to on-the-go charging demands amid surrounding urban development.

Saint James charging by the numbers

Locations
11
Chargers
17
DC Fast locations
6
Level 2 locations
5

DC fast share: 55% of locations. Level 2 share: 45%. Average chargers per site: 1.5. Average DC fast power: 36 kW.

Saint James charging — local snapshot

Top operator share
ChargePoint Network runs 91% of public locations across 2 networks.
Average DC fast power
36 kW (fastest stall: 63 kW)
High-power share
0% of DC fast sites are 150 kW-class or higher
Mix
55% DC fast / 45% Level 2 across 11 locations
Estimated DC ports
9 fast-charging ports city-wide

Charging networks in Saint James

The following operators run public charging in Saint James, ranked by number of locations.

Featured charging locations in Saint James

A selection of higher-power public charging locations across Saint James, sorted by power level.

  1. STJ NISSAN SHOWROOM GARAGE — Saint James, NY, 11780 (ChargePoint Network · DC Fast · 62.5 kW)
  2. Advantage Honda — Saint James, NY, 11780 (Blink Network · DC Fast · 60 kW)
  3. COMPETITION BMW DCWB 3 — Saint James, NY, 11780 (ChargePoint Network · DC Fast · 24 kW)
  4. COMPETITION BMW DCWB 4 — Saint James, NY, 11780 (ChargePoint Network · DC Fast · 24 kW)
  5. COMPETITION BMW DCWB 1 — Saint James, NY, 11780 (ChargePoint Network · DC Fast · 24 kW)
  6. COMPETITION BMW DCWB 2 — Saint James, NY, 11780 (ChargePoint Network · DC Fast · 24 kW)
  7. SMITHHAVEN CJD LEVEL 2 B — Saint James, NY, 11780 (ChargePoint Network · Level 2 · 19.2 kW)
  8. SMITHHAVEN CJD LEVEL 2 D — Saint James, NY, 11780 (ChargePoint Network · Level 2 · 19.2 kW)
  9. SMITHHAVEN CJD LEVEL 2 C — Saint James, NY, 11780 (ChargePoint Network · Level 2 · 19.2 kW)
  10. COMPETITION BMW BMW-PUBLIC-2 — Saint James, NY, 11780 (ChargePoint Network · Level 2 · 6.5 kW)
  11. SMITHTOWN CELEBRATE PARK — Saint James, NY, 11780 (ChargePoint Network · Level 2 · 6.5 kW)

Nearby cities with EV charging coverage

Other cities in New York we cover with full charging data and site profitability scoring — useful for comparing footprints across the state.

How profitability scores work

Every score on EV Data Map blends location demand, competition and operating economics into a single 0–100 number. Demand is modeled from registered EV count, commute and through-traffic patterns, daytime worker population, retail and hospitality footprint, and tourism inflows. Competition uses the count and quality of nearby existing chargers — including DC fast power, network reliability and dwell-fit. Operating economics include estimated electricity tariffs, demand-charge exposure, expected utilization, and capital cost for the recommended hardware mix.

For Saint James specifically, our model accounts for local commute corridors, nearby interstate and US-highway traffic, the existing footprint of 6 DC fast and 5 Level 2 sites, and the typical dwell profile of the surrounding land use. The result is a per-address score plus a recommended configuration — number of stalls, target power level and network — that maximises projected revenue.

Frequently asked questions

How many EV charging stations are in Saint James, New York?
There are 11 public electric vehicle charging locations in Saint James, New York, with a combined 17 individual chargers. 6 locations offer DC fast charging and 5 provide Level 2 charging.
What is the largest EV charging network in Saint James?
ChargePoint Network operates the most public charging locations in Saint James with 10 sites, followed by Blink Network with 1 sites.
How much does it cost to install an EV charger in Saint James?
Level 2 EV chargers in Saint James typically install for $4,000–$12,000 per port including make-ready. DC fast installs run $80,000–$250,000+ per port depending on power level, utility upgrades and trenching.
What permits and incentives apply to EV chargers in Saint James?
Most Saint James projects need an electrical permit (and a building permit plus utility coordination for DC fast). Sites can typically stack the federal 30C tax credit (up to 30% / $100,000 per commercial charger in eligible census tracts) with New York state, utility and NEVI-funded programs.
How long does it take to install an EV charger in Saint James?
A typical commercial Level 2 installation in Saint James energizes in 4–8 weeks from site survey. DC fast installs run 4–9 months because of utility service upgrades, transformer lead times and switchgear.
How long does an EV charger in Saint James take to become profitable?
Payback in Saint James depends on utilization, electricity tariffs (especially demand charges) and incentives captured. Well-sited Level 2 stations typically reach payback in 3–5 years; DC fast sites with strong throughput in 3–6 years.

Related coverage