Install EV Chargers in Fargo, North Dakota

Install EV chargers or analyze a site in Fargo, North Dakota. 27 existing public charging locations (8 DC fast, 19 Level 2). Free 0–100 profitability score on any Fargo address from EV Data Map by Charge Rigs.

Fargo, North Dakota is served by 27 public electric vehicle charging locations operating 81 individual chargers — an average of 3.0 chargers per site. Of those locations, 8 (30%) offer DC fast charging suitable for road-trip stops and short-dwell sessions, while 19 (70%) provide Level 2 charging for longer dwell times such as workplace, retail and overnight parking.

The largest charging network in Fargo is ChargePoint Network with 16 locations, followed by Non-Networked with 3. Average DC fast power across the city is approximately 151 kW, which puts most fast-charging stalls in the modern 150 kW–350 kW class capable of delivering a meaningful state-of-charge top-up in 15–30 minutes for a typical EV.

EV Data Map is an EVSE and DC Fast Charger location analyzer that scores every potential charging site in the United States from 0 to 100 for DC Fast Charger ROI, combining EV ownership density, daytime population, traffic, demographics, nearby competing chargers, dwell-time characteristics of surrounding land use, and grid capacity. Use the analyzer below to enter any address in Fargo and receive an instant ROI score, demand projection, and recommended charger configuration.

What to know about charging in Fargo

Fargo boasts a dynamic and competitive public charging landscape, featuring 27 locations supported by seven distinct networks. ChargePoint Network leads with 59% of the sites, promoting robust pricing and uptime across the city. With 8 DC fast chargers averaging 151 kW and the fastest at 350 kW, Fargo's infrastructure is well-equipped to meet diverse driver needs—38% of its DC fast stations offer 150 kW-class power or higher. This modern high-power fleet allows EV drivers to strategically choose based on power and amenities, enhancing their charging experience. As 30% of the city's public locations provide DC fast options, the infrastructure effectively balances the demands of quick charges and longer-stay Level 2 stations, making Fargo an attractive location for current and prospective EV users.

Fargo charging by the numbers

Locations
27
Chargers
81
DC Fast locations
8
Level 2 locations
19

DC fast share: 30% of locations. Level 2 share: 70%. Average chargers per site: 3.0. Average DC fast power: 151 kW.

Fargo charging — local snapshot

Top operator share
ChargePoint Network runs 59% of public locations across 7 networks.
Average DC fast power
151 kW (fastest stall: 350 kW)
High-power share
38% of DC fast sites are 150 kW-class or higher
Mix
30% DC fast / 70% Level 2 across 27 locations
Estimated DC ports
32 fast-charging ports city-wide

Charging networks in Fargo

The following operators run public charging in Fargo, ranked by number of locations.

Featured charging locations in Fargo

A selection of higher-power public charging locations across Fargo, sorted by power level.

  1. Flying J 685 — Fargo, ND, 58104 (eVgo Network · DC Fast · 350 kW)
  2. Scheels - Tesla Supercharger — Fargo, ND, 58103 (Tesla · DC Fast · 250 kW)
  3. Casey's General Store - Tesla Supercharger — Fargo, ND, 58104 (Tesla · DC Fast · 250 kW)
  4. Luther Family Ford (DCFC) — Fargo, ND, 58104 (Blink Network · DC Fast · 120 kW)
  5. CITY OF FARGO DCFC1 — Fargo, ND, 58102 (ChargePoint Network · DC Fast · 62.5 kW)
  6. CCEC CHARGERS WEST ACRES — Fargo, ND, 58103 (ChargePoint Network · DC Fast · 62 kW)
  7. CCEC CHARGERS FM CVB LEVEL 3 — Fargo, ND, 58103 (ChargePoint Network · DC Fast · 62 kW)
  8. LUTHER FAMILY BUICK GMC — FARGO, ND, 58104 (EV Connect · DC Fast · 50 kW)
  9. Luther Family Ford — Fargo, ND, 58104 (Blink Network · Level 2 · 19.2 kW)
  10. HECTOR 1 EV-3 — Fargo, ND, 58102 (ChargePoint Network · Level 2 · 13.4 kW)
  11. HECTOR 1 EV-4 — Fargo, ND, 58102 (ChargePoint Network · Level 2 · 13.4 kW)
  12. HECTOR 1 EV-5 — Fargo, ND, 58102 (ChargePoint Network · Level 2 · 13.4 kW)

Nearby cities with EV charging coverage

Other cities in North Dakota we cover with full charging data and site profitability scoring — useful for comparing footprints across the state.

How profitability scores work

Every score on EV Data Map blends location demand, competition and operating economics into a single 0–100 number. Demand is modeled from registered EV count, commute and through-traffic patterns, daytime worker population, retail and hospitality footprint, and tourism inflows. Competition uses the count and quality of nearby existing chargers — including DC fast power, network reliability and dwell-fit. Operating economics include estimated electricity tariffs, demand-charge exposure, expected utilization, and capital cost for the recommended hardware mix.

For Fargo specifically, our model accounts for local commute corridors, nearby interstate and US-highway traffic, the existing footprint of 8 DC fast and 19 Level 2 sites, and the typical dwell profile of the surrounding land use. The result is a per-address score plus a recommended configuration — number of stalls, target power level and network — that maximises projected revenue.

Frequently asked questions

How many EV charging stations are in Fargo, North Dakota?
There are 27 public electric vehicle charging locations in Fargo, North Dakota, with a combined 81 individual chargers. 8 locations offer DC fast charging and 19 provide Level 2 charging.
What is the largest EV charging network in Fargo?
ChargePoint Network operates the most public charging locations in Fargo with 16 sites, followed by Non-Networked with 3 sites.
How much does it cost to install an EV charger in Fargo?
Level 2 EV chargers in Fargo typically install for $4,000–$12,000 per port including make-ready. DC fast installs run $80,000–$250,000+ per port depending on power level, utility upgrades and trenching.
What permits and incentives apply to EV chargers in Fargo?
Most Fargo projects need an electrical permit (and a building permit plus utility coordination for DC fast). Sites can typically stack the federal 30C tax credit (up to 30% / $100,000 per commercial charger in eligible census tracts) with North Dakota state, utility and NEVI-funded programs.
How long does it take to install an EV charger in Fargo?
A typical commercial Level 2 installation in Fargo energizes in 4–8 weeks from site survey. DC fast installs run 4–9 months because of utility service upgrades, transformer lead times and switchgear.
How long does an EV charger in Fargo take to become profitable?
Payback in Fargo depends on utilization, electricity tariffs (especially demand charges) and incentives captured. Well-sited Level 2 stations typically reach payback in 3–5 years; DC fast sites with strong throughput in 3–6 years.

Related coverage