Install EV Chargers in Rapid City, South Dakota

Install EV chargers or analyze a site in Rapid City, South Dakota. 21 existing public charging locations (7 DC fast, 14 Level 2). Free 0–100 profitability score on any Rapid City address from EV Data Map by Charge Rigs.

Rapid City, South Dakota is served by 21 public electric vehicle charging locations operating 35 individual chargers — an average of 1.7 chargers per site. Of those locations, 7 (33%) offer DC fast charging suitable for road-trip stops and short-dwell sessions, while 14 (67%) provide Level 2 charging for longer dwell times such as workplace, retail and overnight parking.

The largest charging network in Rapid City is ChargePoint Network with 14 locations, followed by Non-Networked with 3. Average DC fast power across the city is approximately 82 kW, which puts most fast-charging stalls in the modern 150 kW–350 kW class capable of delivering a meaningful state-of-charge top-up in 15–30 minutes for a typical EV.

EV Data Map is an EVSE and DC Fast Charger location analyzer that scores every potential charging site in the United States from 0 to 100 for DC Fast Charger ROI, combining EV ownership density, daytime population, traffic, demographics, nearby competing chargers, dwell-time characteristics of surrounding land use, and grid capacity. Use the analyzer below to enter any address in Rapid City and receive an instant ROI score, demand projection, and recommended charger configuration.

What to know about charging in Rapid City

Rapid City, South Dakota, presents a unique landscape for EV charging operators, with 21 public locations dominated by a single major player, ChargePoint Network, which accounts for 67% of the sites. This concentration on a single provider may impact service reliability and pricing strategies. Notably, the city's 7 DC fast charging stations average 82 kW, with just 14% offering 150 kW or more—indicating an opportunity for new entrants to leverage higher power capabilities to attract drivers. With 33% of the city’s charging infrastructure dedicated to DC fast options, operators can strategically position themselves against a backdrop of growing demand for both rapid and Level 2 charging solutions. The existing charging ecosystem also highlights key gaps that new developments could target to optimize coverage and meet the needs of the EV community.

Rapid City charging by the numbers

Locations
21
Chargers
35
DC Fast locations
7
Level 2 locations
14

DC fast share: 33% of locations. Level 2 share: 67%. Average chargers per site: 1.7. Average DC fast power: 82 kW.

Rapid City charging — local snapshot

Top operator share
ChargePoint Network runs 67% of public locations across 5 networks.
Average DC fast power
82 kW (fastest stall: 150 kW)
High-power share
14% of DC fast sites are 150 kW-class or higher
Mix
33% DC fast / 67% Level 2 across 21 locations
Estimated DC ports
11 fast-charging ports city-wide

Charging networks in Rapid City

The following operators run public charging in Rapid City, ranked by number of locations.

Featured charging locations in Rapid City

A selection of higher-power public charging locations across Rapid City, sorted by power level.

  1. Rushmore Mall - Tesla Supercharger — Rapid City, SD, 57701 (Tesla · DC Fast · 150 kW)
  2. SECFIRSTBNK SECFIRSTBNK-C — Rapid City, SD, 57701 (ChargePoint Network · DC Fast · 125 kW)
  3. SECFIRSTBNK SECFIRSTBNK-B — Rapid City, SD, 57701 (ChargePoint Network · DC Fast · 125 kW)
  4. SECFIRSTBNK SECFIRSTBNK-A — Rapid City, SD, 57701 (ChargePoint Network · DC Fast · 62.5 kW)
  5. Granite Automotive — Rapid City, SD, 57701 (Blink Network · DC Fast · 60 kW)
  6. RCKIA RCKIAABB — Rapid City, SD, 57701 (ChargePoint Network · DC Fast · 24 kW)
  7. MCKIEFORD1 DC FAST — Rapid City, SD, 57701 (ChargePoint Network · DC Fast · 24 kW)
  8. RCKIA KIA RC 1 — Rapid City, SD, 57701 (ChargePoint Network · Level 2 · 12 kW)
  9. RUSHMORE HONDA STATION 2 — Rapid City, SD, 57701 (ChargePoint Network · Level 2 · 12 kW)
  10. Courtesy Subaru — Rapid City, SD, 57701 (Blink Network · Level 2 · 8.6 kW)
  11. Liberty Mitsubishi — Rapid City, SD, 57701 (Non-Networked · Level 2 · 7.2 kW)
  12. Holiday Inn Rapid City Downtown Convention Center - Tesla Destination — Rapid City, SD, 57701 (Non-Networked · Level 2 · 7.2 kW)

Nearby cities with EV charging coverage

Other cities in South Dakota we cover with full charging data and site profitability scoring — useful for comparing footprints across the state.

How profitability scores work

Every score on EV Data Map blends location demand, competition and operating economics into a single 0–100 number. Demand is modeled from registered EV count, commute and through-traffic patterns, daytime worker population, retail and hospitality footprint, and tourism inflows. Competition uses the count and quality of nearby existing chargers — including DC fast power, network reliability and dwell-fit. Operating economics include estimated electricity tariffs, demand-charge exposure, expected utilization, and capital cost for the recommended hardware mix.

For Rapid City specifically, our model accounts for local commute corridors, nearby interstate and US-highway traffic, the existing footprint of 7 DC fast and 14 Level 2 sites, and the typical dwell profile of the surrounding land use. The result is a per-address score plus a recommended configuration — number of stalls, target power level and network — that maximises projected revenue.

Frequently asked questions

How many EV charging stations are in Rapid City, South Dakota?
There are 21 public electric vehicle charging locations in Rapid City, South Dakota, with a combined 35 individual chargers. 7 locations offer DC fast charging and 14 provide Level 2 charging.
What is the largest EV charging network in Rapid City?
ChargePoint Network operates the most public charging locations in Rapid City with 14 sites, followed by Non-Networked with 3 sites.
How much does it cost to install an EV charger in Rapid City?
Level 2 EV chargers in Rapid City typically install for $4,000–$12,000 per port including make-ready. DC fast installs run $80,000–$250,000+ per port depending on power level, utility upgrades and trenching.
What permits and incentives apply to EV chargers in Rapid City?
Most Rapid City projects need an electrical permit (and a building permit plus utility coordination for DC fast). Sites can typically stack the federal 30C tax credit (up to 30% / $100,000 per commercial charger in eligible census tracts) with South Dakota state, utility and NEVI-funded programs.
How long does it take to install an EV charger in Rapid City?
A typical commercial Level 2 installation in Rapid City energizes in 4–8 weeks from site survey. DC fast installs run 4–9 months because of utility service upgrades, transformer lead times and switchgear.
How long does an EV charger in Rapid City take to become profitable?
Payback in Rapid City depends on utilization, electricity tariffs (especially demand charges) and incentives captured. Well-sited Level 2 stations typically reach payback in 3–5 years; DC fast sites with strong throughput in 3–6 years.