Install EV Chargers in Sioux Falls, South Dakota

Install EV chargers or analyze a site in Sioux Falls, South Dakota. 33 existing public charging locations (12 DC fast, 21 Level 2). Free 0–100 profitability score on any Sioux Falls address from EV Data Map by Charge Rigs.

Sioux Falls, South Dakota is served by 33 public electric vehicle charging locations operating 117 individual chargers — an average of 3.5 chargers per site. Of those locations, 12 (36%) offer DC fast charging suitable for road-trip stops and short-dwell sessions, while 21 (64%) provide Level 2 charging for longer dwell times such as workplace, retail and overnight parking.

The largest charging network in Sioux Falls is Tesla Destination with 7 locations, followed by ChargePoint Network with 7. Average DC fast power across the city is approximately 133 kW, which puts most fast-charging stalls in the modern 150 kW–350 kW class capable of delivering a meaningful state-of-charge top-up in 15–30 minutes for a typical EV.

EV Data Map is an EVSE and DC Fast Charger location analyzer that scores every potential charging site in the United States from 0 to 100 for DC Fast Charger ROI, combining EV ownership density, daytime population, traffic, demographics, nearby competing chargers, dwell-time characteristics of surrounding land use, and grid capacity. Use the analyzer below to enter any address in Sioux Falls and receive an instant ROI score, demand projection, and recommended charger configuration.

What to know about charging in Sioux Falls

Sioux Falls boasts a dynamic EV charging landscape characterized by a diverse mix of 33 public charging locations operated by 10 distinct networks, including a notable presence from Tesla Destination and ChargePoint. With 36% of the sites offering DC fast charging, drivers benefit from an average power output of 133 kW, with several high-capacity options reaching up to 350 kW. This mid-power offering is complemented by the fact that one-third of the DC fast locations are 150 kW or higher, positioning Sioux Falls as an attractive choice for EV owners seeking efficient charging solutions. The competitive market encourages nuanced charging site selection, catering to travelers and locals alike who prioritize power capabilities and amenities over sticking to a single brand.

Sioux Falls charging by the numbers

Locations
33
Chargers
117
DC Fast locations
12
Level 2 locations
21

DC fast share: 36% of locations. Level 2 share: 64%. Average chargers per site: 3.5. Average DC fast power: 133 kW.

Sioux Falls charging — local snapshot

Top operator share
Tesla Destination runs 21% of public locations across 10 networks.
Average DC fast power
133 kW (fastest stall: 350 kW)
High-power share
33% of DC fast sites are 150 kW-class or higher
Mix
36% DC fast / 64% Level 2 across 33 locations
Estimated DC ports
38 fast-charging ports city-wide

Charging networks in Sioux Falls

The following operators run public charging in Sioux Falls, ranked by number of locations.

Featured charging locations in Sioux Falls

A selection of higher-power public charging locations across Sioux Falls, sorted by power level.

  1. Quality Inn Airport North (Sioux Falls, SD) — Sioux Falls, SD, 57107 (Electrify America · DC Fast · 350 kW)
  2. Flying J 716 — Sioux Falls, SD, 57107 (eVgo Network · DC Fast · 350 kW)
  3. Sioux Falls Ford — Sioux Falls, SD, 57106 (SYNERGEV · DC Fast · 180 kW)
  4. Hy-Vee - Tesla Supercharger — Sioux Falls, SD, 57106 (Tesla · DC Fast · 150 kW)
  5. Sioux Falls Kenworth — Sioux Falls, SD, 57104 (FLIPTURN · DC Fast · 120 kW)
  6. Billion Hyundai of Sioux Falls — Sioux Falls, SD, 57106 (Blink Network · DC Fast · 120 kW)
  7. Cadillac Of Sioux Falls — SIOUX FALLS, SD, 57107 (EV Connect · DC Fast · 120 kW)
  8. Schulte Subaru - DCFC — Sioux Falls, SD, 57108 (Blink Network · DC Fast · 60 kW)
  9. Luxury Auto Mall — Sioux Falls, SD, 57107 (Non-Networked · DC Fast · 50 kW)
  10. Billion Buick GMC Sioux Falls — Sioux Falls, SD, 57105 (EV Connect · DC Fast · 50 kW)
  11. Volvo Cars Sioux Falls — Sioux Falls, SD, 57105 (Non-Networked · DC Fast · 25 kW)
  12. SF KIA SFKIA1ABB — Sioux Falls, SD, 57105 (ChargePoint Network · DC Fast · 24 kW)

Nearby cities with EV charging coverage

Other cities in South Dakota we cover with full charging data and site profitability scoring — useful for comparing footprints across the state.

How profitability scores work

Every score on EV Data Map blends location demand, competition and operating economics into a single 0–100 number. Demand is modeled from registered EV count, commute and through-traffic patterns, daytime worker population, retail and hospitality footprint, and tourism inflows. Competition uses the count and quality of nearby existing chargers — including DC fast power, network reliability and dwell-fit. Operating economics include estimated electricity tariffs, demand-charge exposure, expected utilization, and capital cost for the recommended hardware mix.

For Sioux Falls specifically, our model accounts for local commute corridors, nearby interstate and US-highway traffic, the existing footprint of 12 DC fast and 21 Level 2 sites, and the typical dwell profile of the surrounding land use. The result is a per-address score plus a recommended configuration — number of stalls, target power level and network — that maximises projected revenue.

Frequently asked questions

How many EV charging stations are in Sioux Falls, South Dakota?
There are 33 public electric vehicle charging locations in Sioux Falls, South Dakota, with a combined 117 individual chargers. 12 locations offer DC fast charging and 21 provide Level 2 charging.
What is the largest EV charging network in Sioux Falls?
Tesla Destination operates the most public charging locations in Sioux Falls with 7 sites, followed by ChargePoint Network with 7 sites.
How much does it cost to install an EV charger in Sioux Falls?
Level 2 EV chargers in Sioux Falls typically install for $4,000–$12,000 per port including make-ready. DC fast installs run $80,000–$250,000+ per port depending on power level, utility upgrades and trenching.
What permits and incentives apply to EV chargers in Sioux Falls?
Most Sioux Falls projects need an electrical permit (and a building permit plus utility coordination for DC fast). Sites can typically stack the federal 30C tax credit (up to 30% / $100,000 per commercial charger in eligible census tracts) with South Dakota state, utility and NEVI-funded programs.
How long does it take to install an EV charger in Sioux Falls?
A typical commercial Level 2 installation in Sioux Falls energizes in 4–8 weeks from site survey. DC fast installs run 4–9 months because of utility service upgrades, transformer lead times and switchgear.
How long does an EV charger in Sioux Falls take to become profitable?
Payback in Sioux Falls depends on utilization, electricity tariffs (especially demand charges) and incentives captured. Well-sited Level 2 stations typically reach payback in 3–5 years; DC fast sites with strong throughput in 3–6 years.

Related coverage