Install EV Chargers in Chantilly, Virginia

Install EV chargers or analyze a site in Chantilly, Virginia. 23 existing public charging locations (5 DC fast, 18 Level 2). Free 0–100 profitability score on any Chantilly address from EV Data Map by Charge Rigs.

Chantilly, Virginia is served by 23 public electric vehicle charging locations operating 69 individual chargers — an average of 3.0 chargers per site. Of those locations, 5 (22%) offer DC fast charging suitable for road-trip stops and short-dwell sessions, while 18 (78%) provide Level 2 charging for longer dwell times such as workplace, retail and overnight parking.

The largest charging network in Chantilly is ChargePoint Network with 11 locations, followed by Blink Network with 4. Average DC fast power across the city is approximately 153 kW, which puts most fast-charging stalls in the modern 150 kW–350 kW class capable of delivering a meaningful state-of-charge top-up in 15–30 minutes for a typical EV.

EV Data Map is an EVSE and DC Fast Charger location analyzer that scores every potential charging site in the United States from 0 to 100 for DC Fast Charger ROI, combining EV ownership density, daytime population, traffic, demographics, nearby competing chargers, dwell-time characteristics of surrounding land use, and grid capacity. Use the analyzer below to enter any address in Chantilly and receive an instant ROI score, demand projection, and recommended charger configuration.

What to know about charging in Chantilly

Chantilly, Virginia, boasts a competitive electric vehicle charging infrastructure with 23 public locations supported by seven distinct operators, enhancing choice for drivers. ChargePoint Network leads with 48% of the market, creating a robust environment where pricing and uptime remain competitive. Notably, 22% of these locations offer DC fast charging, averaging 153 kW, with 40% classified as 150 kW or higher, making them well-suited for quick top-ups. This modern high-power setup, including a peak stall of 350 kW, attracts drivers who prioritize charging speed and convenience. As a result, the city's diverse charging options enable users to tailor their experiences based on power needs and amenities, while the EV Data Map allows for strategic site selection that considers traffic patterns and grid capacity.

Chantilly charging by the numbers

Locations
23
Chargers
69
DC Fast locations
5
Level 2 locations
18

DC fast share: 22% of locations. Level 2 share: 78%. Average chargers per site: 3.0. Average DC fast power: 153 kW.

Chantilly charging — local snapshot

Top operator share
ChargePoint Network runs 48% of public locations across 7 networks.
Average DC fast power
153 kW (fastest stall: 350 kW)
High-power share
40% of DC fast sites are 150 kW-class or higher
Mix
22% DC fast / 78% Level 2 across 23 locations
Estimated DC ports
15 fast-charging ports city-wide

Charging networks in Chantilly

The following operators run public charging in Chantilly, ranked by number of locations.

Featured charging locations in Chantilly

A selection of higher-power public charging locations across Chantilly, sorted by power level.

  1. Walmart 5969 (Chantilly, VA) — Chantilly, VA, 20151 (Electrify America · DC Fast · 350 kW)
  2. Sheetz #304 — Chantilly, VA, 20152 (eVgo Network · DC Fast · 200 kW)
  3. Ted Britt Ford — Chantilly, VA, 20151 (FORD_CHARGE · DC Fast · 120 kW)
  4. The Field at Commonwealth — Chantilly, VA, 20151 (eVgo Network · DC Fast · 50 kW)
  5. Priority Nissan - Chantilly — Chantilly, VA, 20151 (Non-Networked · DC Fast · 44 kW)
  6. Quest Diagnostics - Chantilly — Chantilly, VA, 20153 (Blink Network · Level 2 · 16.9 kW)
  7. HY OF CHANTILLY ST2-NEAR PARTS — Chantilly, VA, 20151 (ChargePoint Network · Level 2 · 12 kW)
  8. HY OF CHANTILLY ST3-IN SHOP — Chantilly, VA, 20151 (ChargePoint Network · Level 2 · 12 kW)
  9. 50250 — Chantilly, VA, 20151 (Blink Network · Level 2 · 11.5 kW)
  10. The Community of Cedar Lakes — Chantilly, VA, 22033 (Blink Network · Level 2 · 10.4 kW)
  11. G&C Juice Bar — Chantilly, VA, 20151 (Non-Networked · Level 2 · 7.2 kW)
  12. Enterprise Court — Chantilly, VA, 20151 (Non-Networked · Level 2 · 7.2 kW)

Nearby cities with EV charging coverage

Other cities in Virginia we cover with full charging data and site profitability scoring — useful for comparing footprints across the state.

How profitability scores work

Every score on EV Data Map blends location demand, competition and operating economics into a single 0–100 number. Demand is modeled from registered EV count, commute and through-traffic patterns, daytime worker population, retail and hospitality footprint, and tourism inflows. Competition uses the count and quality of nearby existing chargers — including DC fast power, network reliability and dwell-fit. Operating economics include estimated electricity tariffs, demand-charge exposure, expected utilization, and capital cost for the recommended hardware mix.

For Chantilly specifically, our model accounts for local commute corridors, nearby interstate and US-highway traffic, the existing footprint of 5 DC fast and 18 Level 2 sites, and the typical dwell profile of the surrounding land use. The result is a per-address score plus a recommended configuration — number of stalls, target power level and network — that maximises projected revenue.

Frequently asked questions

How many EV charging stations are in Chantilly, Virginia?
There are 23 public electric vehicle charging locations in Chantilly, Virginia, with a combined 69 individual chargers. 5 locations offer DC fast charging and 18 provide Level 2 charging.
What is the largest EV charging network in Chantilly?
ChargePoint Network operates the most public charging locations in Chantilly with 11 sites, followed by Blink Network with 4 sites.
How much does it cost to install an EV charger in Chantilly?
Level 2 EV chargers in Chantilly typically install for $4,000–$12,000 per port including make-ready. DC fast installs run $80,000–$250,000+ per port depending on power level, utility upgrades and trenching.
What permits and incentives apply to EV chargers in Chantilly?
Most Chantilly projects need an electrical permit (and a building permit plus utility coordination for DC fast). Sites can typically stack the federal 30C tax credit (up to 30% / $100,000 per commercial charger in eligible census tracts) with Virginia state, utility and NEVI-funded programs.
How long does it take to install an EV charger in Chantilly?
A typical commercial Level 2 installation in Chantilly energizes in 4–8 weeks from site survey. DC fast installs run 4–9 months because of utility service upgrades, transformer lead times and switchgear.
How long does an EV charger in Chantilly take to become profitable?
Payback in Chantilly depends on utilization, electricity tariffs (especially demand charges) and incentives captured. Well-sited Level 2 stations typically reach payback in 3–5 years; DC fast sites with strong throughput in 3–6 years.