Install EV Chargers in Herndon, Virginia

Install EV chargers or analyze a site in Herndon, Virginia. 31 existing public charging locations (4 DC fast, 27 Level 2). Free 0–100 profitability score on any Herndon address from EV Data Map by Charge Rigs.

Herndon, Virginia is served by 31 public electric vehicle charging locations operating 90 individual chargers — an average of 2.9 chargers per site. Of those locations, 4 (13%) offer DC fast charging suitable for road-trip stops and short-dwell sessions, while 27 (87%) provide Level 2 charging for longer dwell times such as workplace, retail and overnight parking.

The largest charging network in Herndon is ChargePoint Network with 16 locations, followed by Blink Network with 8. Average DC fast power across the city is approximately 238 kW, which puts most fast-charging stalls in the modern 150 kW–350 kW class capable of delivering a meaningful state-of-charge top-up in 15–30 minutes for a typical EV.

EV Data Map is an EVSE and DC Fast Charger location analyzer that scores every potential charging site in the United States from 0 to 100 for DC Fast Charger ROI, combining EV ownership density, daytime population, traffic, demographics, nearby competing chargers, dwell-time characteristics of surrounding land use, and grid capacity. Use the analyzer below to enter any address in Herndon and receive an instant ROI score, demand projection, and recommended charger configuration.

What to know about charging in Herndon

Herndon, Virginia, boasts a well-balanced EV charging landscape with 31 public locations across four distinct networks, ensuring robust access for residents and visitors alike. Notably, 13% of these are DC fast charging stations, featuring an impressive average power output of 238 kW, capable of accommodating those with urgent charging needs. The city's commitment to high-performance charging is evident, as all DC fast sites are rated 150 kW or higher, ensuring quick turnaround times for drivers. With ChargePoint Network operating over half of the charging sites, Herndon effectively avoids the pitfalls of single-operator concentration while still maintaining reliable service. This strategic mix not only meets the current demand but also positions Herndon for future growth in electric mobility.

Herndon charging by the numbers

Locations
31
Chargers
90
DC Fast locations
4
Level 2 locations
27

DC fast share: 13% of locations. Level 2 share: 87%. Average chargers per site: 2.9. Average DC fast power: 238 kW.

Herndon charging — local snapshot

Top operator share
ChargePoint Network runs 52% of public locations across 4 networks.
Average DC fast power
238 kW (fastest stall: 350 kW)
High-power share
100% of DC fast sites are 150 kW-class or higher
Mix
13% DC fast / 87% Level 2 across 31 locations
Estimated DC ports
16 fast-charging ports city-wide

Charging networks in Herndon

The following operators run public charging in Herndon, ranked by number of locations.

Featured charging locations in Herndon

A selection of higher-power public charging locations across Herndon, sorted by power level.

  1. Fox Mill Shopping Center — Herndon, VA, 20171 (eVgo Network · DC Fast · 350 kW)
  2. Safeway Herndon #1689 — Herndon, VA, 20170 (eVgo Network · DC Fast · 200 kW)
  3. Village Center at Dulles — Herndon, VA, 20171 (eVgo Network · DC Fast · 200 kW)
  4. Sheetz Herndon #726 — Herndon, VA, 20171 (eVgo Network · DC Fast · 200 kW)
  5. Northwest Federal Credit Union — Herndon, VA, 20170 (Blink Network · Level 2 · 17.3 kW)
  6. Herndon — Herndon, VA, 20171 (Blink Network · Level 2 · 16.6 kW)
  7. Lincoln Property Company Engineering — Herndon, VA, 20171 (Blink Network · Level 2 · 11.5 kW)
  8. ICON at Dulles - K Building Garage — Herndon, VA, 20171 (EVGATEWAY · Level 2 · 11.5 kW)
  9. Discovery Square Apartments — Herndon, VA, 20121 (Blink Network · Level 2 · 11.5 kW)
  10. ICON at Dulles - I Building Garage — Herndon, VA, 20171 (EVGATEWAY · Level 2 · 11.5 kW)
  11. Makers Rise Apartments — Herndon, VA, 20171 (EVGATEWAY · Level 2 · 9.6 kW)
  12. FAIRFAX COUNTY HERNDON METRO 5 — Herndon, VA, 20191 (ChargePoint Network · Level 2 · 6.5 kW)

Nearby cities with EV charging coverage

Other cities in Virginia we cover with full charging data and site profitability scoring — useful for comparing footprints across the state.

How profitability scores work

Every score on EV Data Map blends location demand, competition and operating economics into a single 0–100 number. Demand is modeled from registered EV count, commute and through-traffic patterns, daytime worker population, retail and hospitality footprint, and tourism inflows. Competition uses the count and quality of nearby existing chargers — including DC fast power, network reliability and dwell-fit. Operating economics include estimated electricity tariffs, demand-charge exposure, expected utilization, and capital cost for the recommended hardware mix.

For Herndon specifically, our model accounts for local commute corridors, nearby interstate and US-highway traffic, the existing footprint of 4 DC fast and 27 Level 2 sites, and the typical dwell profile of the surrounding land use. The result is a per-address score plus a recommended configuration — number of stalls, target power level and network — that maximises projected revenue.

Frequently asked questions

How many EV charging stations are in Herndon, Virginia?
There are 31 public electric vehicle charging locations in Herndon, Virginia, with a combined 90 individual chargers. 4 locations offer DC fast charging and 27 provide Level 2 charging.
What is the largest EV charging network in Herndon?
ChargePoint Network operates the most public charging locations in Herndon with 16 sites, followed by Blink Network with 8 sites.
How much does it cost to install an EV charger in Herndon?
Level 2 EV chargers in Herndon typically install for $4,000–$12,000 per port including make-ready. DC fast installs run $80,000–$250,000+ per port depending on power level, utility upgrades and trenching.
What permits and incentives apply to EV chargers in Herndon?
Most Herndon projects need an electrical permit (and a building permit plus utility coordination for DC fast). Sites can typically stack the federal 30C tax credit (up to 30% / $100,000 per commercial charger in eligible census tracts) with Virginia state, utility and NEVI-funded programs.
How long does it take to install an EV charger in Herndon?
A typical commercial Level 2 installation in Herndon energizes in 4–8 weeks from site survey. DC fast installs run 4–9 months because of utility service upgrades, transformer lead times and switchgear.
How long does an EV charger in Herndon take to become profitable?
Payback in Herndon depends on utilization, electricity tariffs (especially demand charges) and incentives captured. Well-sited Level 2 stations typically reach payback in 3–5 years; DC fast sites with strong throughput in 3–6 years.