Install EV Chargers in Chesapeake, Virginia

Install EV chargers or analyze a site in Chesapeake, Virginia. 29 existing public charging locations (13 DC fast, 16 Level 2). Free 0–100 profitability score on any Chesapeake address from EV Data Map by Charge Rigs.

Chesapeake, Virginia is served by 29 public electric vehicle charging locations operating 97 individual chargers — an average of 3.3 chargers per site. Of those locations, 13 (45%) offer DC fast charging suitable for road-trip stops and short-dwell sessions, while 16 (55%) provide Level 2 charging for longer dwell times such as workplace, retail and overnight parking.

The largest charging network in Chesapeake is ChargePoint Network with 10 locations, followed by Blink Network with 7. Average DC fast power across the city is approximately 135 kW, which puts most fast-charging stalls in the modern 150 kW–350 kW class capable of delivering a meaningful state-of-charge top-up in 15–30 minutes for a typical EV.

EV Data Map is an EVSE and DC Fast Charger location analyzer that scores every potential charging site in the United States from 0 to 100 for DC Fast Charger ROI, combining EV ownership density, daytime population, traffic, demographics, nearby competing chargers, dwell-time characteristics of surrounding land use, and grid capacity. Use the analyzer below to enter any address in Chesapeake and receive an instant ROI score, demand projection, and recommended charger configuration.

What to know about charging in Chesapeake

Chesapeake, Virginia, boasts a competitive EV charging landscape with 29 public locations, including a robust 45% DC fast charging share. This diversity is amplified by the presence of eight distinct charging networks, ensuring pricing and uptime remain favorable for drivers. Notably, the average fast charging power stands at 135 kW, with 38% of the DC fast sites classified at 150 kW or higher, catering to the rising demand for efficient rapid charging. The fastest stall reaches an impressive 350 kW, appealing to a wider range of drivers who prioritize power selection in navigation apps. This distinctive charging mix not only addresses immediate fueling needs but also presents unique opportunities for site developers to strategically position new stations within an evolving market.

Chesapeake charging by the numbers

Locations
29
Chargers
97
DC Fast locations
13
Level 2 locations
16

DC fast share: 45% of locations. Level 2 share: 55%. Average chargers per site: 3.3. Average DC fast power: 135 kW.

Chesapeake charging — local snapshot

Top operator share
ChargePoint Network runs 34% of public locations across 8 networks.
Average DC fast power
135 kW (fastest stall: 350 kW)
High-power share
38% of DC fast sites are 150 kW-class or higher
Mix
45% DC fast / 55% Level 2 across 29 locations
Estimated DC ports
34 fast-charging ports city-wide

Charging networks in Chesapeake

The following operators run public charging in Chesapeake, ranked by number of locations.

Featured charging locations in Chesapeake

A selection of higher-power public charging locations across Chesapeake, sorted by power level.

  1. Target Chesapeake #T2203 — Chesapeake, VA, 23322 (eVgo Network · DC Fast · 350 kW)
  2. Wawa - Tesla Supercharger — Chesapeake, VA, 23322 (Tesla · DC Fast · 250 kW)
  3. Cavalier Ford Greenbrier — Chesapeake, VA, 23320 (FORD_CHARGE · DC Fast · 240 kW)
  4. Cavalier Ford Chesapeake Square — Chesapeake, VA, 23321 (FORD_CHARGE · DC Fast · 240 kW)
  5. Southern CDJR - Greenbrier — Chesapeake, VA, 23320 (CHARGESMART_EV · DC Fast · 180 kW)
  6. L590 PRIORITY PL01 — Chesapeake, VA, 23320 (ChargePoint Network · DC Fast · 120 kW)
  7. CHESHYUNDAI DC 1 — Chesapeake, VA, 23321 (ChargePoint Network · DC Fast · 62.5 kW)
  8. SOUTHERN VW VW SERVICE — Chesapeake, VA, 23320 (ChargePoint Network · DC Fast · 62.5 kW)
  9. SOUTHERN VW VW SALES 2 — Chesapeake, VA, 23320 (ChargePoint Network · DC Fast · 62.5 kW)
  10. SOUTHERN VW VW SALES 1 — Chesapeake, VA, 23320 (ChargePoint Network · DC Fast · 62.5 kW)
  11. Greenbrier Mall — Chesapeake, VA, 23320 (eVgo Network · DC Fast · 50 kW)
  12. Hall Nissan — Chesapeake, VA, 23321 (Non-Networked · DC Fast · 50 kW)

Nearby cities with EV charging coverage

Other cities in Virginia we cover with full charging data and site profitability scoring — useful for comparing footprints across the state.

How profitability scores work

Every score on EV Data Map blends location demand, competition and operating economics into a single 0–100 number. Demand is modeled from registered EV count, commute and through-traffic patterns, daytime worker population, retail and hospitality footprint, and tourism inflows. Competition uses the count and quality of nearby existing chargers — including DC fast power, network reliability and dwell-fit. Operating economics include estimated electricity tariffs, demand-charge exposure, expected utilization, and capital cost for the recommended hardware mix.

For Chesapeake specifically, our model accounts for local commute corridors, nearby interstate and US-highway traffic, the existing footprint of 13 DC fast and 16 Level 2 sites, and the typical dwell profile of the surrounding land use. The result is a per-address score plus a recommended configuration — number of stalls, target power level and network — that maximises projected revenue.

Frequently asked questions

How many EV charging stations are in Chesapeake, Virginia?
There are 29 public electric vehicle charging locations in Chesapeake, Virginia, with a combined 97 individual chargers. 13 locations offer DC fast charging and 16 provide Level 2 charging.
What is the largest EV charging network in Chesapeake?
ChargePoint Network operates the most public charging locations in Chesapeake with 10 sites, followed by Blink Network with 7 sites.
How much does it cost to install an EV charger in Chesapeake?
Level 2 EV chargers in Chesapeake typically install for $4,000–$12,000 per port including make-ready. DC fast installs run $80,000–$250,000+ per port depending on power level, utility upgrades and trenching.
What permits and incentives apply to EV chargers in Chesapeake?
Most Chesapeake projects need an electrical permit (and a building permit plus utility coordination for DC fast). Sites can typically stack the federal 30C tax credit (up to 30% / $100,000 per commercial charger in eligible census tracts) with Virginia state, utility and NEVI-funded programs.
How long does it take to install an EV charger in Chesapeake?
A typical commercial Level 2 installation in Chesapeake energizes in 4–8 weeks from site survey. DC fast installs run 4–9 months because of utility service upgrades, transformer lead times and switchgear.
How long does an EV charger in Chesapeake take to become profitable?
Payback in Chesapeake depends on utilization, electricity tariffs (especially demand charges) and incentives captured. Well-sited Level 2 stations typically reach payback in 3–5 years; DC fast sites with strong throughput in 3–6 years.