Install EV Chargers in Mobile, Alabama

Install EV chargers or analyze a site in Mobile, Alabama. 33 existing public charging locations (7 DC fast, 26 Level 2). Free 0–100 profitability score on any Mobile address from EV Data Map by Charge Rigs.

Mobile, Alabama is served by 33 public electric vehicle charging locations operating 91 individual chargers — an average of 2.8 chargers per site. Of those locations, 7 (21%) offer DC fast charging suitable for road-trip stops and short-dwell sessions, while 26 (79%) provide Level 2 charging for longer dwell times such as workplace, retail and overnight parking.

The largest charging network in Mobile is ChargePoint Network with 23 locations, followed by Blink Network with 4. Average DC fast power across the city is approximately 164 kW, which puts most fast-charging stalls in the modern 150 kW–350 kW class capable of delivering a meaningful state-of-charge top-up in 15–30 minutes for a typical EV.

EV Data Map is an EVSE and DC Fast Charger location analyzer that scores every potential charging site in the United States from 0 to 100 for DC Fast Charger ROI, combining EV ownership density, daytime population, traffic, demographics, nearby competing chargers, dwell-time characteristics of surrounding land use, and grid capacity. Use the analyzer below to enter any address in Mobile and receive an instant ROI score, demand projection, and recommended charger configuration.

What to know about charging in Mobile

Mobile, Alabama's EV charging landscape is characterized by a strong concentration of ChargePoint Network, which dominates 70% of the city's 33 public charging locations. This reliance on a single operator influences key factors like uptime and pricing, essential for any developer considering entry. Notably, the city's 7 DC fast charging sites feature a robust average power of 164 kW, with more than half of these stations classified at 150 kW or higher, providing compelling options for quick charging. This modern infrastructure positions Mobile favorably within the region, as drivers increasingly seek out high-power options, emphasizing the importance of integrating competitive hardware in this thriving market.

Mobile charging by the numbers

Locations
33
Chargers
91
DC Fast locations
7
Level 2 locations
26

DC fast share: 21% of locations. Level 2 share: 79%. Average chargers per site: 2.8. Average DC fast power: 164 kW.

Mobile charging — local snapshot

Top operator share
ChargePoint Network runs 70% of public locations across 5 networks.
Average DC fast power
164 kW (fastest stall: 250 kW)
High-power share
57% of DC fast sites are 150 kW-class or higher
Mix
21% DC fast / 79% Level 2 across 33 locations
Estimated DC ports
30 fast-charging ports city-wide

Charging networks in Mobile

The following operators run public charging in Mobile, ranked by number of locations.

Featured charging locations in Mobile

A selection of higher-power public charging locations across Mobile, sorted by power level.

  1. BMW OF MOBILE 1 CPE250-2 — Mobile, AL, 36606 (ChargePoint Network · DC Fast · 250 kW)
  2. BMW OF MOBILE 1 CPE250-1 — Mobile, AL, 36606 (ChargePoint Network · DC Fast · 250 kW)
  3. Winn-Dixie — Mobile, AL, 36619 (Tesla · DC Fast · 250 kW)
  4. The Bel Air Mall - Tesla Supercharger — Mobile, AL, 36606 (Tesla · DC Fast · 150 kW)
  5. Mullinax Ford of Mobile — Mobile, AL, 36608 (SYNERGEV · DC Fast · 120 kW)
  6. COMMUNITY CHARG MOBILE DIV 2 — Mobile, AL, 36602 (ChargePoint Network · DC Fast · 62.5 kW)
  7. COMMUNITY CHARG MOBILE DIV 1 — Mobile, AL, 36602 (ChargePoint Network · DC Fast · 62.5 kW)
  8. BMW OF MOBILE 1 CP6000-1 — Mobile, AL, 36606 (ChargePoint Network · Level 2 · 19.2 kW)
  9. The Crossing at Pine Brook — Mobile, AL, 36609 (Blink Network · Level 2 · 10.8 kW)
  10. Joe Bullard Automotive Group — Mobile, AL, 36606 (Blink Network · Level 2 · 10.5 kW)
  11. Portier at Midtown — Mobile, AL, 36606 (Blink Network · Level 2 · 10.4 kW)
  12. Yester Oaks — Mobile, AL, 36608 (Blink Network · Level 2 · 8.6 kW)

Nearby cities with EV charging coverage

Other cities in Alabama we cover with full charging data and site profitability scoring — useful for comparing footprints across the state.

How profitability scores work

Every score on EV Data Map blends location demand, competition and operating economics into a single 0–100 number. Demand is modeled from registered EV count, commute and through-traffic patterns, daytime worker population, retail and hospitality footprint, and tourism inflows. Competition uses the count and quality of nearby existing chargers — including DC fast power, network reliability and dwell-fit. Operating economics include estimated electricity tariffs, demand-charge exposure, expected utilization, and capital cost for the recommended hardware mix.

For Mobile specifically, our model accounts for local commute corridors, nearby interstate and US-highway traffic, the existing footprint of 7 DC fast and 26 Level 2 sites, and the typical dwell profile of the surrounding land use. The result is a per-address score plus a recommended configuration — number of stalls, target power level and network — that maximises projected revenue.

Frequently asked questions

How many EV charging stations are in Mobile, Alabama?
There are 33 public electric vehicle charging locations in Mobile, Alabama, with a combined 91 individual chargers. 7 locations offer DC fast charging and 26 provide Level 2 charging.
What is the largest EV charging network in Mobile?
ChargePoint Network operates the most public charging locations in Mobile with 23 sites, followed by Blink Network with 4 sites.
How much does it cost to install an EV charger in Mobile?
Level 2 EV chargers in Mobile typically install for $4,000–$12,000 per port including make-ready. DC fast installs run $80,000–$250,000+ per port depending on power level, utility upgrades and trenching.
What permits and incentives apply to EV chargers in Mobile?
Most Mobile projects need an electrical permit (and a building permit plus utility coordination for DC fast). Sites can typically stack the federal 30C tax credit (up to 30% / $100,000 per commercial charger in eligible census tracts) with Alabama state, utility and NEVI-funded programs.
How long does it take to install an EV charger in Mobile?
A typical commercial Level 2 installation in Mobile energizes in 4–8 weeks from site survey. DC fast installs run 4–9 months because of utility service upgrades, transformer lead times and switchgear.
How long does an EV charger in Mobile take to become profitable?
Payback in Mobile depends on utilization, electricity tariffs (especially demand charges) and incentives captured. Well-sited Level 2 stations typically reach payback in 3–5 years; DC fast sites with strong throughput in 3–6 years.