Install EV chargers or analyze a site in Dothan, Alabama. 13 existing public charging locations (8 DC fast, 5 Level 2). Free 0–100 profitability score on any Dothan address from EV Data Map by Charge Rigs.
Dothan, Alabama is served by 13 public electric vehicle charging locations operating 36 individual chargers — an average of 2.8 chargers per site. Of those locations, 8 (62%) offer DC fast charging suitable for road-trip stops and short-dwell sessions, while 5 (38%) provide Level 2 charging for longer dwell times such as workplace, retail and overnight parking.
The largest charging network in Dothan is ChargePoint Network with 7 locations, followed by LOOP with 2. Average DC fast power across the city is approximately 155 kW, which puts most fast-charging stalls in the modern 150 kW–350 kW class capable of delivering a meaningful state-of-charge top-up in 15–30 minutes for a typical EV.
EV Data Map is an EVSE and DC Fast Charger location analyzer that scores every potential charging site in the United States from 0 to 100 for DC Fast Charger ROI, combining EV ownership density, daytime population, traffic, demographics, nearby competing chargers, dwell-time characteristics of surrounding land use, and grid capacity. Use the analyzer below to enter any address in Dothan and receive an instant ROI score, demand projection, and recommended charger configuration.
Dothan, Alabama showcases a robust public charging landscape with 13 locations that emphasize diversity and high power. The city features a notable 62% share of DC fast chargers, with an impressive average output of 155 kW, including a peak site delivering 250 kW. This means that half of the fast charging sites are at least 150 kW, appealing to drivers seeking efficient and rapid charging solutions. With five distinct charging networks, primarily dominated by ChargePoint Network at 54%, users have the flexibility to choose based on power preferences and amenities. This competitive market encourages dynamic pricing and uptime, making Dothan an attractive option for EV drivers traveling through this region.
DC fast share: 62% of locations. Level 2 share: 38%. Average chargers per site: 2.8. Average DC fast power: 155 kW.
The following operators run public charging in Dothan, ranked by number of locations.
A selection of higher-power public charging locations across Dothan, sorted by power level.
Other cities in Alabama we cover with full charging data and site profitability scoring — useful for comparing footprints across the state.
Every score on EV Data Map blends location demand, competition and operating economics into a single 0–100 number. Demand is modeled from registered EV count, commute and through-traffic patterns, daytime worker population, retail and hospitality footprint, and tourism inflows. Competition uses the count and quality of nearby existing chargers — including DC fast power, network reliability and dwell-fit. Operating economics include estimated electricity tariffs, demand-charge exposure, expected utilization, and capital cost for the recommended hardware mix.
For Dothan specifically, our model accounts for local commute corridors, nearby interstate and US-highway traffic, the existing footprint of 8 DC fast and 5 Level 2 sites, and the typical dwell profile of the surrounding land use. The result is a per-address score plus a recommended configuration — number of stalls, target power level and network — that maximises projected revenue.