EV Charging in Fermeuse, Newfoundland and Labrador

Public EV charging in Fermeuse, Newfoundland and Labrador. 3 charging locations (1 DC fast, 2 Level 2). Score any address with EV Data Map's free 0–100 site profitability analyzer — Canadian incentives via ZEVIP and provincial programs included.

Fermeuse, Newfoundland and Labrador is served by 3 public electric vehicle charging locations operating roughly 3 individual chargers. Of those, 1 (33%) offer DC fast charging suitable for road-trip stops and short-dwell sessions, while 2 (67%) provide Level 2 charging for longer dwell times such as workplace, retail and overnight parking.

The largest charging network in Fermeuse is ChargePoint Network with 2 locations, followed by Non-Networked with 1. Average DC fast power across the city is approximately 63 kW.

EV Data Map scores every potential charging site in Canada from 0 to 100 for profitability, combining ZEV registration density, daytime population, traffic, demographics, nearby competing chargers, and grid context. Enter any Fermeuse address below for an instant profitability score, demand projection, and recommended charger configuration — including ZEVIP, Newfoundland and Labrador provincial, and utility incentive matching.

Fermeuse charging by the numbers

Locations
3
Chargers
3
DC Fast locations
1
Level 2 locations
2

Charging networks in Fermeuse

Featured charging locations in Fermeuse

  1. TAKECHARGE FERMEUSE DCFC — Fermeuse, NL, A0A 2G0 (ChargePoint Network · DC Fast · 62.5 kW)
  2. Newfoundland Power — Fermeuse, NL, A0A 2G0 (Non-Networked · Level 2 · 7.2 kW)
  3. TAKECHARGE FERMEUSE L2 — Fermeuse, NL, A0A 2G0 (ChargePoint Network · Level 2 · 6.5 kW)

Frequently asked questions

How many EV charging stations are in Fermeuse, Newfoundland and Labrador?
There are 3 public EV charging locations in Fermeuse, Newfoundland and Labrador, with a combined 3 individual chargers. 1 locations offer DC fast charging and 2 provide Level 2 charging.
What incentives apply to EV chargers in Newfoundland and Labrador?
Most Fermeuse projects can stack the federal Zero Emission Vehicle Infrastructure Program (ZEVIP) — covering up to 50% of project costs — with provincial Newfoundland and Labrador programs and utility incentives. Class 56 accelerated CCA is also available for commercial charging hardware.
What is the largest EV charging network in Fermeuse?
ChargePoint Network operates the most public charging locations in Fermeuse with 2 sites, followed by Non-Networked with 1 sites.

Related coverage