Public EV charging in Belleville, Ontario. 18 charging locations (5 DC fast, 13 Level 2). Score any address with EV Data Map's free 0–100 site profitability analyzer — Canadian incentives via ZEVIP and provincial programs included.
Belleville, Ontario is served by 18 public electric vehicle charging locations operating roughly 51 individual chargers. Of those, 5 (28%) offer DC fast charging suitable for road-trip stops and short-dwell sessions, while 13 (72%) provide Level 2 charging for longer dwell times such as workplace, retail and overnight parking.
The largest charging network in Belleville is ChargePoint Network with 7 locations, followed by FLO with 6. Average DC fast power across the city is approximately 73 kW.
EV Data Map is an EVSE and DC Fast Charger location analyzer that scores every potential charging site in Canada from 0 to 100 for DC Fast Charger ROI, combining ZEV registration density, daytime population, traffic, demographics, nearby competing chargers, and grid context. Enter any Belleville address below for an instant ROI score, demand projection, and recommended charger configuration — including ZEVIP, Ontario provincial, and utility incentive matching.
Belleville, Ontario boasts a competitive landscape for electric vehicle charging, featuring 18 public charging locations shared among six distinct operators. The presence of multiple brands, most notably the ChargePoint Network at 39% of sites, encourages diverse pricing and enhances uptime, allowing drivers to strategically choose based on power levels and amenities. With 28% of charging points designated as DC fast, the average output stands at 73 kW, with 20% of these sites capable of delivering 150 kW or more, appealing to those seeking quicker recharge options. This mix of charging infrastructure, coupled with the city's nuanced market dynamics, positions Belleville as an attractive destination for EV drivers navigating the region.
Other cities in Ontario we cover with full charging data and site profitability scoring.
Belleville projects can typically stack three layers of funding: the federal Zero Emission Vehicle Infrastructure Program (ZEVIP) covering up to 50% of project costs, Ontario provincial programs for additional rebates and tax credits, and local utility incentives for grid-connected installations. Class 56 accelerated capital cost allowance (100% first-year writeoff) further improves project economics for commercial installations.
Use the analyzer to see which programs apply to a specific Belleville address along with eligible award amounts.
Every score on EV Data Map blends location demand, competition and operating economics into a single 0–100 number. For Canadian sites, demand draws on Statistics Canada ZEV registrations (Table 20-10-0024) projected forward to 2026 using province-level CAGR, daytime population from StatCan census tracts, and traffic patterns. Competition uses the count and quality of nearby chargers — including DC fast power, network reliability and dwell-fit. Operating economics include provincial electricity tariffs, demand-charge exposure, expected utilization, and capital cost for the recommended hardware mix.
For Belleville specifically, our model factors local commute corridors, the existing footprint of 5 DC fast and 13 Level 2 sites, and the dwell profile of surrounding land use. The result is a per-address score plus a recommended configuration — number of stalls, target power level and network — that maximises projected revenue.