EV Charging in Orleans, Ontario

Public EV charging in Orleans, Ontario. 5 charging locations (1 DC fast, 4 Level 2). Score any address with EV Data Map's free 0–100 site profitability analyzer — Canadian incentives via ZEVIP and provincial programs included.

Orleans, Ontario is served by 5 public electric vehicle charging locations operating roughly 10 individual chargers. Of those, 1 (20%) offer DC fast charging suitable for road-trip stops and short-dwell sessions, while 4 (80%) provide Level 2 charging for longer dwell times such as workplace, retail and overnight parking.

The largest charging network in Orleans is FLO with 2 locations, followed by IVY with 2. Average DC fast power across the city is approximately 50 kW.

EV Data Map is an EVSE and DC Fast Charger location analyzer that scores every potential charging site in Canada from 0 to 100 for DC Fast Charger ROI, combining ZEV registration density, daytime population, traffic, demographics, nearby competing chargers, and grid context. Enter any Orleans address below for an instant ROI score, demand projection, and recommended charger configuration — including ZEVIP, Ontario provincial, and utility incentive matching.

What to know about charging in Orleans

Orleans, Ontario features a balanced mix of EV charging infrastructure with five public locations operated by three different networks, highlighting a unique market dynamics where neither a single operator dominates nor a fully competitive landscape prevails. The city’s solitary DC fast charging station, averaging 50 kW, reflects a legacy fleet that lags behind newer, more robust options available elsewhere, especially considering the absence of 150 kW-class or higher chargers. As 20% of the charging sites provide DC fast access, they cater primarily to drivers seeking quicker turnaround times, while the remaining four Level 2 stations accommodate longer-stay users. This distinctive blend of charging options creates opportunities for developers to strategically enhance the local infrastructure by focusing on higher power solutions that can improve driver satisfaction and attract new EV users.

Orleans charging by the numbers

Locations
5
Chargers
10
DC Fast locations
1
Level 2 locations
4

Orleans charging — local snapshot

Top operator share
FLO runs 40% of public locations across 3 networks.
Average DC fast power
50 kW (fastest stall: 50 kW)
High-power share
0% of DC fast sites are 150 kW-class or higher
Mix
20% DC fast / 80% Level 2 across 5 locations
Estimated DC ports
4 fast-charging ports city-wide

Charging networks in Orleans

Featured charging locations in Orleans

  1. Orleans Canadian Tire — Orleans, ON, K4A 0G2 (IVY · DC Fast · 50 kW)
  2. Core+ MAX — Orléans, ON, K1C 7J2 (FLO · Level 2 · 16.6 kW)
  3. City of Ottawa - Chapel Hill Park N Ride — Orleans, ON, K1W 1K8 (FLO · Level 2 · 7.2 kW)
  4. NCC P20 — Orleans, ON, K1A 0E7 (IVY · Level 2 · 6.7 kW)
  5. Desjardins - CdS Orléans — Orléans, ON, K1C 1G4 (Circuit électrique · Level 2 · 6.2 kW)

Nearby cities with EV charging coverage

Other cities in Ontario we cover with full charging data and site profitability scoring.

Incentives for EV chargers in Ontario

Orleans projects can typically stack three layers of funding: the federal Zero Emission Vehicle Infrastructure Program (ZEVIP) covering up to 50% of project costs, Ontario provincial programs for additional rebates and tax credits, and local utility incentives for grid-connected installations. Class 56 accelerated capital cost allowance (100% first-year writeoff) further improves project economics for commercial installations.

Use the analyzer to see which programs apply to a specific Orleans address along with eligible award amounts.

How profitability scores work in Orleans

Every score on EV Data Map blends location demand, competition and operating economics into a single 0–100 number. For Canadian sites, demand draws on Statistics Canada ZEV registrations (Table 20-10-0024) projected forward to 2026 using province-level CAGR, daytime population from StatCan census tracts, and traffic patterns. Competition uses the count and quality of nearby chargers — including DC fast power, network reliability and dwell-fit. Operating economics include provincial electricity tariffs, demand-charge exposure, expected utilization, and capital cost for the recommended hardware mix.

For Orleans specifically, our model factors local commute corridors, the existing footprint of 1 DC fast and 4 Level 2 sites, and the dwell profile of surrounding land use. The result is a per-address score plus a recommended configuration — number of stalls, target power level and network — that maximises projected revenue.

Frequently asked questions

How many EV charging stations are in Orleans, Ontario?
There are 5 public EV charging locations in Orleans, Ontario, with a combined 10 individual chargers. 1 locations offer DC fast charging and 4 provide Level 2 charging.
What incentives apply to EV chargers in Ontario?
Most Orleans projects can stack the federal Zero Emission Vehicle Infrastructure Program (ZEVIP) — covering up to 50% of project costs — with provincial Ontario programs and utility incentives. Class 56 accelerated CCA is also available for commercial charging hardware.
What is the largest EV charging network in Orleans?
FLO operates the most public charging locations in Orleans with 2 sites, followed by IVY with 2 sites.

Related coverage