Public EV charging in Châteauguay, Quebec. 17 charging locations (4 DC fast, 13 Level 2). Score any address with EV Data Map's free 0–100 site profitability analyzer — Canadian incentives via ZEVIP and provincial programs included.
Châteauguay, Quebec is served by 17 public electric vehicle charging locations operating roughly 44 individual chargers. Of those, 4 (24%) offer DC fast charging suitable for road-trip stops and short-dwell sessions, while 13 (76%) provide Level 2 charging for longer dwell times such as workplace, retail and overnight parking.
The largest charging network in Châteauguay is Circuit électrique with 10 locations, followed by FLO with 6. Average DC fast power across the city is approximately 493 kW.
EV Data Map is an EVSE and DC Fast Charger location analyzer that scores every potential charging site in Canada from 0 to 100 for DC Fast Charger ROI, combining ZEV registration density, daytime population, traffic, demographics, nearby competing chargers, and grid context. Enter any Châteauguay address below for an instant ROI score, demand projection, and recommended charger configuration — including ZEVIP, Quebec provincial, and utility incentive matching.
Châteauguay, Quebec stands out with its diverse EV charging landscape, featuring 17 public locations across three networks, predominantly Circuit électrique which accounts for 59% of these sites. The city offers a robust fast-charging infrastructure, with 4 DC fast chargers averaging an impressive 493 kW, including a remarkable peak of 1500 kW, ensuring quick turnaround for drivers. Notably, half of the fast charging sites support 150 kW or more, positioning Châteauguay at the upper echelon of charging power, making it a choice destination for EV drivers seeking efficiency. This varied charging ecosystem balances high-demand DC fast options with longer-duration Level 2 stations, catering effectively to both quick pit stops and more leisurely charging needs.
Other cities in Quebec we cover with full charging data and site profitability scoring.
Châteauguay projects can typically stack three layers of funding: the federal Zero Emission Vehicle Infrastructure Program (ZEVIP) covering up to 50% of project costs, Quebec provincial programs for additional rebates and tax credits, and local utility incentives for grid-connected installations. Class 56 accelerated capital cost allowance (100% first-year writeoff) further improves project economics for commercial installations.
Use the analyzer to see which programs apply to a specific Châteauguay address along with eligible award amounts.
Every score on EV Data Map blends location demand, competition and operating economics into a single 0–100 number. For Canadian sites, demand draws on Statistics Canada ZEV registrations (Table 20-10-0024) projected forward to 2026 using province-level CAGR, daytime population from StatCan census tracts, and traffic patterns. Competition uses the count and quality of nearby chargers — including DC fast power, network reliability and dwell-fit. Operating economics include provincial electricity tariffs, demand-charge exposure, expected utilization, and capital cost for the recommended hardware mix.
For Châteauguay specifically, our model factors local commute corridors, the existing footprint of 4 DC fast and 13 Level 2 sites, and the dwell profile of surrounding land use. The result is a per-address score plus a recommended configuration — number of stalls, target power level and network — that maximises projected revenue.