Public EV charging in Rimouski, Quebec. 44 charging locations (8 DC fast, 36 Level 2). Score any address with EV Data Map's free 0–100 site profitability analyzer — Canadian incentives via ZEVIP and provincial programs included.
Rimouski, Quebec is served by 44 public electric vehicle charging locations operating roughly 124 individual chargers. Of those, 8 (18%) offer DC fast charging suitable for road-trip stops and short-dwell sessions, while 36 (82%) provide Level 2 charging for longer dwell times such as workplace, retail and overnight parking.
The largest charging network in Rimouski is Circuit électrique with 17 locations, followed by FLO with 13. Average DC fast power across the city is approximately 193 kW.
EV Data Map is an EVSE and DC Fast Charger location analyzer that scores every potential charging site in Canada from 0 to 100 for DC Fast Charger ROI, combining ZEV registration density, daytime population, traffic, demographics, nearby competing chargers, and grid context. Enter any Rimouski address below for an instant ROI score, demand projection, and recommended charger configuration — including ZEVIP, Quebec provincial, and utility incentive matching.
Rimouski stands out in the EV charging landscape with a diverse mix of seven operators managing 44 public charging locations, ensuring competitive pricing and uptime. With 18% of these sites offering DC fast charging, drivers benefit from an impressive average power of 193 kW and access to top-end infrastructure, like the 360 kW fast stall, to meet their charging needs efficiently. Notably, 63% of the DC fast sites are classified at 150 kW or higher, allowing users to quickly recharge and resume their journeys. This high-power offering combined with a variety of charging options encourages thoughtful site selection based on power and amenities, making Rimouski a compelling choice for EV drivers seeking a reliable charging experience.
Other cities in Quebec we cover with full charging data and site profitability scoring.
Rimouski projects can typically stack three layers of funding: the federal Zero Emission Vehicle Infrastructure Program (ZEVIP) covering up to 50% of project costs, Quebec provincial programs for additional rebates and tax credits, and local utility incentives for grid-connected installations. Class 56 accelerated capital cost allowance (100% first-year writeoff) further improves project economics for commercial installations.
Use the analyzer to see which programs apply to a specific Rimouski address along with eligible award amounts.
Every score on EV Data Map blends location demand, competition and operating economics into a single 0–100 number. For Canadian sites, demand draws on Statistics Canada ZEV registrations (Table 20-10-0024) projected forward to 2026 using province-level CAGR, daytime population from StatCan census tracts, and traffic patterns. Competition uses the count and quality of nearby chargers — including DC fast power, network reliability and dwell-fit. Operating economics include provincial electricity tariffs, demand-charge exposure, expected utilization, and capital cost for the recommended hardware mix.
For Rimouski specifically, our model factors local commute corridors, the existing footprint of 8 DC fast and 36 Level 2 sites, and the dwell profile of surrounding land use. The result is a per-address score plus a recommended configuration — number of stalls, target power level and network — that maximises projected revenue.