Public EV charging in Saint-Jean-Port-Joli, Quebec. 5 charging locations (2 DC fast, 3 Level 2). Score any address with EV Data Map's free 0–100 site profitability analyzer — Canadian incentives via ZEVIP and provincial programs included.
Saint-Jean-Port-Joli, Quebec is served by 5 public electric vehicle charging locations operating roughly 9 individual chargers. Of those, 2 (40%) offer DC fast charging suitable for road-trip stops and short-dwell sessions, while 3 (60%) provide Level 2 charging for longer dwell times such as workplace, retail and overnight parking.
The largest charging network in Saint-Jean-Port-Joli is Circuit électrique with 2 locations, followed by ChargePoint Network with 2. Average DC fast power across the city is approximately 350 kW.
EV Data Map is an EVSE and DC Fast Charger location analyzer that scores every potential charging site in Canada from 0 to 100 for DC Fast Charger ROI, combining ZEV registration density, daytime population, traffic, demographics, nearby competing chargers, and grid context. Enter any Saint-Jean-Port-Joli address below for an instant ROI score, demand projection, and recommended charger configuration — including ZEVIP, Quebec provincial, and utility incentive matching.
Saint-Jean-Port-Joli stands out in its EV charging landscape with a well-balanced mix of infrastructure that caters to both fast and longer-dwell charging needs. The city features two DC fast charging sites, each providing an impressive average power of 350 kW, ensuring ultra-fast recharging options for drivers on the go. Notably, 40% of the five public charging locations are dedicated to DC fast charging, a significant proportion that enhances convenience for EV users. With three distinct charging networks represented and a leading operator comprising 40% of the sites, the city strikes a unique balance, making it an attractive choice for EV drivers and potential site developers alike.
Other cities in Quebec we cover with full charging data and site profitability scoring.
Saint-Jean-Port-Joli projects can typically stack three layers of funding: the federal Zero Emission Vehicle Infrastructure Program (ZEVIP) covering up to 50% of project costs, Quebec provincial programs for additional rebates and tax credits, and local utility incentives for grid-connected installations. Class 56 accelerated capital cost allowance (100% first-year writeoff) further improves project economics for commercial installations.
Use the analyzer to see which programs apply to a specific Saint-Jean-Port-Joli address along with eligible award amounts.
Every score on EV Data Map blends location demand, competition and operating economics into a single 0–100 number. For Canadian sites, demand draws on Statistics Canada ZEV registrations (Table 20-10-0024) projected forward to 2026 using province-level CAGR, daytime population from StatCan census tracts, and traffic patterns. Competition uses the count and quality of nearby chargers — including DC fast power, network reliability and dwell-fit. Operating economics include provincial electricity tariffs, demand-charge exposure, expected utilization, and capital cost for the recommended hardware mix.
For Saint-Jean-Port-Joli specifically, our model factors local commute corridors, the existing footprint of 2 DC fast and 3 Level 2 sites, and the dwell profile of surrounding land use. The result is a per-address score plus a recommended configuration — number of stalls, target power level and network — that maximises projected revenue.