Public EV charging in Venise-en-Québec, Quebec. 5 charging locations (1 DC fast, 4 Level 2). Score any address with EV Data Map's free 0–100 site profitability analyzer — Canadian incentives via ZEVIP and provincial programs included.
Venise-en-Québec, Quebec is served by 5 public electric vehicle charging locations operating roughly 17 individual chargers. Of those, 1 (20%) offer DC fast charging suitable for road-trip stops and short-dwell sessions, while 4 (80%) provide Level 2 charging for longer dwell times such as workplace, retail and overnight parking.
The largest charging network in Venise-en-Québec is Circuit électrique with 5 locations. Average DC fast power across the city is approximately 100 kW.
EV Data Map is an EVSE and DC Fast Charger location analyzer that scores every potential charging site in Canada from 0 to 100 for DC Fast Charger ROI, combining ZEV registration density, daytime population, traffic, demographics, nearby competing chargers, and grid context. Enter any Venise-en-Québec address below for an instant ROI score, demand projection, and recommended charger configuration — including ZEVIP, Quebec provincial, and utility incentive matching.
Venise-en-Québec's public charging landscape is uniquely shaped by the presence of Circuit électrique, which operates all five public charging locations, establishing a consistent framework for uptime and pricing. With only one DC fast charging site at an average power of 100 kW, the opportunities for faster charging are limited, making any new entrants with 150 kW or higher capacities particularly attractive to EV drivers who prioritize speed. Additionally, the prevalence of Level 2 chargers caters to those who prefer longer charging dwell times. This singular operator landscape and power mix highlight potential market gaps for additional charging solutions, particularly in the context of nearby municipalities such as Dunham and Cowansville, which may influence regional EV travel patterns.
Other cities in Quebec we cover with full charging data and site profitability scoring.
Venise-en-Québec projects can typically stack three layers of funding: the federal Zero Emission Vehicle Infrastructure Program (ZEVIP) covering up to 50% of project costs, Quebec provincial programs for additional rebates and tax credits, and local utility incentives for grid-connected installations. Class 56 accelerated capital cost allowance (100% first-year writeoff) further improves project economics for commercial installations.
Use the analyzer to see which programs apply to a specific Venise-en-Québec address along with eligible award amounts.
Every score on EV Data Map blends location demand, competition and operating economics into a single 0–100 number. For Canadian sites, demand draws on Statistics Canada ZEV registrations (Table 20-10-0024) projected forward to 2026 using province-level CAGR, daytime population from StatCan census tracts, and traffic patterns. Competition uses the count and quality of nearby chargers — including DC fast power, network reliability and dwell-fit. Operating economics include provincial electricity tariffs, demand-charge exposure, expected utilization, and capital cost for the recommended hardware mix.
For Venise-en-Québec specifically, our model factors local commute corridors, the existing footprint of 1 DC fast and 4 Level 2 sites, and the dwell profile of surrounding land use. The result is a per-address score plus a recommended configuration — number of stalls, target power level and network — that maximises projected revenue.