Install EV Chargers in Bellflower, California

Install EV chargers or analyze a site in Bellflower, California. 22 existing public charging locations (4 DC fast, 18 Level 2). Free 0–100 profitability score on any Bellflower address from EV Data Map by Charge Rigs.

Bellflower, California is served by 22 public electric vehicle charging locations operating 55 individual chargers — an average of 2.5 chargers per site. Of those locations, 4 (18%) offer DC fast charging suitable for road-trip stops and short-dwell sessions, while 18 (82%) provide Level 2 charging for longer dwell times such as workplace, retail and overnight parking.

The largest charging network in Bellflower is ChargePoint Network with 16 locations, followed by eVgo Network with 2. Average DC fast power across the city is approximately 230 kW, which puts most fast-charging stalls in the modern 150 kW–350 kW class capable of delivering a meaningful state-of-charge top-up in 15–30 minutes for a typical EV.

EV Data Map is an EVSE and DC Fast Charger location analyzer that scores every potential charging site in the United States from 0 to 100 for DC Fast Charger ROI, combining EV ownership density, daytime population, traffic, demographics, nearby competing chargers, dwell-time characteristics of surrounding land use, and grid capacity. Use the analyzer below to enter any address in Bellflower and receive an instant ROI score, demand projection, and recommended charger configuration.

What to know about charging in Bellflower

In Bellflower, California, the public charging landscape is notably shaped by the dominance of the ChargePoint Network, which operates 73% of the 22 public charging locations. This reliance on a single network provides a consistent user experience, but also implies that potential competitors must offer exceptional uptime and pricing to entice drivers. Notably, the four DC fast charging stations boast an impressive average power of 230 kW, with 75% offering 150 kW or higher, highlighting the city's commitment to ultra-fast charging options. With 19 DC fast ports, Bellflower presents a strategic opportunity for new entrants equipped with similar high-capacity hardware to capture driver interest in this well-served market.

Bellflower charging by the numbers

Locations
22
Chargers
55
DC Fast locations
4
Level 2 locations
18

DC fast share: 18% of locations. Level 2 share: 82%. Average chargers per site: 2.5. Average DC fast power: 230 kW.

Bellflower charging — local snapshot

Top operator share
ChargePoint Network runs 73% of public locations across 6 networks.
Average DC fast power
230 kW (fastest stall: 350 kW)
High-power share
75% of DC fast sites are 150 kW-class or higher
Mix
18% DC fast / 82% Level 2 across 22 locations
Estimated DC ports
19 fast-charging ports city-wide

Charging networks in Bellflower

The following operators run public charging in Bellflower, ranked by number of locations.

Featured charging locations in Bellflower

A selection of higher-power public charging locations across Bellflower, sorted by power level.

  1. Chase Bank - 16804 Bellflower Blvd — Bellflower, CA, 90706 (eVgo Network · DC Fast · 350 kW)
  2. 17308 Bellflower Blvd — Bellflower, CA, 90706 (eVgo Network · DC Fast · 350 kW)
  3. 7Charge - Bellflower 41296 — Bellflower, CA, 90706 (7CHARGE · DC Fast · 180 kW)
  4. G&M OIL G&M #187 — Bellflower, CA, 90706 (ChargePoint Network · DC Fast · 40 kW)
  5. St. John Bosco High School — Bellflower, CA, 90706 (FLO · Level 2 · 19.2 kW)
  6. 15747 Woodruff Ave Bellflower CA 90706 — Bellflower, CA, 90706 (EVGATEWAY · Level 2 · 7.2 kW)
  7. 8827 Artesia Blvd — Bellflower, CA, 90706 (EV Connect · Level 2 · 7.2 kW)
  8. BELLFLOWER CITY STATION 8 — Bellflower, CA, 90706 (ChargePoint Network · Level 2 · 6.5 kW)
  9. BELLFLOWER CITY STATION 4 — Bellflower, CA, 90706 (ChargePoint Network · Level 2 · 6.5 kW)
  10. BELLFLOWER CITY STATION 9 — Bellflower, CA, 90706 (ChargePoint Network · Level 2 · 6.5 kW)
  11. BELLFLOWER CITY STATION 5 — Bellflower, CA, 90706 (ChargePoint Network · Level 2 · 6.5 kW)
  12. BELLFLOWER CITY STATION 7 — Bellflower, CA, 90706 (ChargePoint Network · Level 2 · 6.5 kW)

Nearby cities with EV charging coverage

Other cities in California we cover with full charging data and site profitability scoring — useful for comparing footprints across the state.

How profitability scores work

Every score on EV Data Map blends location demand, competition and operating economics into a single 0–100 number. Demand is modeled from registered EV count, commute and through-traffic patterns, daytime worker population, retail and hospitality footprint, and tourism inflows. Competition uses the count and quality of nearby existing chargers — including DC fast power, network reliability and dwell-fit. Operating economics include estimated electricity tariffs, demand-charge exposure, expected utilization, and capital cost for the recommended hardware mix.

For Bellflower specifically, our model accounts for local commute corridors, nearby interstate and US-highway traffic, the existing footprint of 4 DC fast and 18 Level 2 sites, and the typical dwell profile of the surrounding land use. The result is a per-address score plus a recommended configuration — number of stalls, target power level and network — that maximises projected revenue.

Frequently asked questions

How many EV charging stations are in Bellflower, California?
There are 22 public electric vehicle charging locations in Bellflower, California, with a combined 55 individual chargers. 4 locations offer DC fast charging and 18 provide Level 2 charging.
What is the largest EV charging network in Bellflower?
ChargePoint Network operates the most public charging locations in Bellflower with 16 sites, followed by eVgo Network with 2 sites.
How much does it cost to install an EV charger in Bellflower?
Level 2 EV chargers in Bellflower typically install for $4,000–$12,000 per port including make-ready. DC fast installs run $80,000–$250,000+ per port depending on power level, utility upgrades and trenching.
What permits and incentives apply to EV chargers in Bellflower?
Most Bellflower projects need an electrical permit (and a building permit plus utility coordination for DC fast). Sites can typically stack the federal 30C tax credit (up to 30% / $100,000 per commercial charger in eligible census tracts) with California state, utility and NEVI-funded programs.
How long does it take to install an EV charger in Bellflower?
A typical commercial Level 2 installation in Bellflower energizes in 4–8 weeks from site survey. DC fast installs run 4–9 months because of utility service upgrades, transformer lead times and switchgear.
How long does an EV charger in Bellflower take to become profitable?
Payback in Bellflower depends on utilization, electricity tariffs (especially demand charges) and incentives captured. Well-sited Level 2 stations typically reach payback in 3–5 years; DC fast sites with strong throughput in 3–6 years.

Related coverage