Install EV Chargers in Paramount, California

Install EV chargers or analyze a site in Paramount, California. 12 existing public charging locations (0 DC fast, 12 Level 2). Free 0–100 profitability score on any Paramount address from EV Data Map by Charge Rigs.

Paramount, California is served by 12 public electric vehicle charging locations operating 22 individual chargers — an average of 1.8 chargers per site. Of those locations, 0 (0%) offer DC fast charging suitable for road-trip stops and short-dwell sessions, while 12 (100%) provide Level 2 charging for longer dwell times such as workplace, retail and overnight parking.

The largest charging network in Paramount is ChargePoint Network with 11 locations, followed by AMPUP with 1. Average DC fast power across the city is approximately 0 kW, which puts most fast-charging stalls in the modern 150 kW–350 kW class capable of delivering a meaningful state-of-charge top-up in 15–30 minutes for a typical EV.

EV Data Map is an EVSE and DC Fast Charger location analyzer that scores every potential charging site in the United States from 0 to 100 for DC Fast Charger ROI, combining EV ownership density, daytime population, traffic, demographics, nearby competing chargers, dwell-time characteristics of surrounding land use, and grid capacity. Use the analyzer below to enter any address in Paramount and receive an instant ROI score, demand projection, and recommended charger configuration.

What to know about charging in Paramount

Paramount, California presents a unique landscape for EV charging with its 12 public locations exclusively featuring Level 2 chargers, leaving a significant void in fast charging options. With 0% of sites offering DC fast charging and a complete reliance on the ChargePoint Network for 92% of the locations, the local charging infrastructure heavily influences network reliability and pricing. This lack of high-power charging creates a compelling business opportunity for new site developers, as residents seeking quick top-ups are currently forced to travel beyond the city limits. As the demand for more accessible and rapid charging solutions grows, there's a clear pathway for operators to fill this essential gap in Paramount’s EV ecosystem.

Paramount charging by the numbers

Locations
12
Chargers
22
DC Fast locations
0
Level 2 locations
12

DC fast share: 0% of locations. Level 2 share: 100%. Average chargers per site: 1.8. Average DC fast power: 0 kW.

Paramount charging — local snapshot

Top operator share
ChargePoint Network runs 92% of public locations across 2 networks.
Mix
0% DC fast / 100% Level 2 across 12 locations

Charging networks in Paramount

The following operators run public charging in Paramount, ranked by number of locations.

Featured charging locations in Paramount

A selection of higher-power public charging locations across Paramount, sorted by power level.

  1. KFC Paramount — Paramount, CA, 90723 (AMPUP · Level 2 · 7.2 kW)
  2. PARAMOUNT CITY PROGRESS P#7 — Paramount, CA, 90723 (ChargePoint Network · Level 2 · 6.5 kW)
  3. PARAMOUNT CITY PROGRESS P #3 — Paramount, CA, 90723 (ChargePoint Network · Level 2 · 6.5 kW)
  4. LYONSBC CHARGER EV1 — Paramount, CA, 90723 (ChargePoint Network · Level 2 · 6.5 kW)
  5. SOMERSETCHARGER SOEMRSET CT4K — Paramount, CA, 90723 (ChargePoint Network · Level 2 · 6.5 kW)
  6. PARAMOUNT CITY PROGRESS P #2 — Paramount, CA, 90723 (ChargePoint Network · Level 2 · 6.5 kW)
  7. PARAMOUNT CITY PROGRESS P #4 — Paramount, CA, 90723 (ChargePoint Network · Level 2 · 6.5 kW)
  8. PARAMOUNT CITY SUBSTATION — Paramount, CA, 90723 (ChargePoint Network · Level 2 · 6.5 kW)
  9. PARAMOUNT CITY PROGRESS P #1 — Paramount, CA, 90723 (ChargePoint Network · Level 2 · 6.5 kW)
  10. PARAMOUNT CITY CITY HALL — Paramount, CA, 90723 (ChargePoint Network · Level 2 · 6.5 kW)
  11. PARAMOUNT CITY PROGRESS P #5 — Paramount, CA, 90723 (ChargePoint Network · Level 2 · 6.5 kW)
  12. PARAMOUNT CITY PROGRESS P#6 — Paramount, CA, 90723 (ChargePoint Network · Level 2 · 6.5 kW)

Nearby cities with EV charging coverage

Other cities in California we cover with full charging data and site profitability scoring — useful for comparing footprints across the state.

How profitability scores work

Every score on EV Data Map blends location demand, competition and operating economics into a single 0–100 number. Demand is modeled from registered EV count, commute and through-traffic patterns, daytime worker population, retail and hospitality footprint, and tourism inflows. Competition uses the count and quality of nearby existing chargers — including DC fast power, network reliability and dwell-fit. Operating economics include estimated electricity tariffs, demand-charge exposure, expected utilization, and capital cost for the recommended hardware mix.

For Paramount specifically, our model accounts for local commute corridors, nearby interstate and US-highway traffic, the existing footprint of 0 DC fast and 12 Level 2 sites, and the typical dwell profile of the surrounding land use. The result is a per-address score plus a recommended configuration — number of stalls, target power level and network — that maximises projected revenue.

Frequently asked questions

How many EV charging stations are in Paramount, California?
There are 12 public electric vehicle charging locations in Paramount, California, with a combined 22 individual chargers. 0 locations offer DC fast charging and 12 provide Level 2 charging.
What is the largest EV charging network in Paramount?
ChargePoint Network operates the most public charging locations in Paramount with 11 sites, followed by AMPUP with 1 sites.
How much does it cost to install an EV charger in Paramount?
Level 2 EV chargers in Paramount typically install for $4,000–$12,000 per port including make-ready. DC fast installs run $80,000–$250,000+ per port depending on power level, utility upgrades and trenching.
What permits and incentives apply to EV chargers in Paramount?
Most Paramount projects need an electrical permit (and a building permit plus utility coordination for DC fast). Sites can typically stack the federal 30C tax credit (up to 30% / $100,000 per commercial charger in eligible census tracts) with California state, utility and NEVI-funded programs.
How long does it take to install an EV charger in Paramount?
A typical commercial Level 2 installation in Paramount energizes in 4–8 weeks from site survey. DC fast installs run 4–9 months because of utility service upgrades, transformer lead times and switchgear.
How long does an EV charger in Paramount take to become profitable?
Payback in Paramount depends on utilization, electricity tariffs (especially demand charges) and incentives captured. Well-sited Level 2 stations typically reach payback in 3–5 years; DC fast sites with strong throughput in 3–6 years.