Install EV Chargers in Downey, California

Install EV chargers or analyze a site in Downey, California. 32 existing public charging locations (11 DC fast, 21 Level 2). Free 0–100 profitability score on any Downey address from EV Data Map by Charge Rigs.

Downey, California is served by 32 public electric vehicle charging locations operating 169 individual chargers — an average of 5.3 chargers per site. Of those locations, 11 (34%) offer DC fast charging suitable for road-trip stops and short-dwell sessions, while 21 (66%) provide Level 2 charging for longer dwell times such as workplace, retail and overnight parking.

The largest charging network in Downey is ChargePoint Network with 16 locations, followed by Non-Networked with 4. Average DC fast power across the city is approximately 109 kW, which puts most fast-charging stalls in the modern 150 kW–350 kW class capable of delivering a meaningful state-of-charge top-up in 15–30 minutes for a typical EV.

EV Data Map is an EVSE and DC Fast Charger location analyzer that scores every potential charging site in the United States from 0 to 100 for DC Fast Charger ROI, combining EV ownership density, daytime population, traffic, demographics, nearby competing chargers, dwell-time characteristics of surrounding land use, and grid capacity. Use the analyzer below to enter any address in Downey and receive an instant ROI score, demand projection, and recommended charger configuration.

What to know about charging in Downey

Downey stands out in the EV charging landscape with its competitive mix of 32 public charging locations, featuring 9 distinct operators that promote diverse pricing dynamics and uptime reliability. ChargePoint Network dominates with 50% of the sites, but drivers have the advantage of choice, allowing them to select based on power and amenities at the 11 DC fast charging stations, which average 108 kW and include a top-tier 350 kW unit. Notably, 18% of these fast chargers exceed 150 kW, appealing to users who prioritize speed. With 34% of the charging infrastructure dedicated to DC fast options, and a significant number of fast ports available, there's notable potential for further development to meet increasing demand across Downey and its surrounding areas.

Downey charging by the numbers

Locations
32
Chargers
169
DC Fast locations
11
Level 2 locations
21

DC fast share: 34% of locations. Level 2 share: 66%. Average chargers per site: 5.3. Average DC fast power: 109 kW.

Downey charging — local snapshot

Top operator share
ChargePoint Network runs 50% of public locations across 9 networks.
Average DC fast power
109 kW (fastest stall: 350 kW)
High-power share
18% of DC fast sites are 150 kW-class or higher
Mix
34% DC fast / 66% Level 2 across 32 locations
Estimated DC ports
46 fast-charging ports city-wide

Charging networks in Downey

The following operators run public charging in Downey, ranked by number of locations.

Featured charging locations in Downey

A selection of higher-power public charging locations across Downey, sorted by power level.

  1. Walmart 4132 (Downey, CA) — Downey, CA, 90242 (Electrify America · DC Fast · 350 kW)
  2. Downey Crossroads — Downey, CA, 90240 (eVgo Network · DC Fast · 350 kW)
  3. The Commons at Gallatin Road - Tesla Supercharger — Downey, CA, 90240 (Tesla · DC Fast · 72 kW)
  4. Stonewood Center - Tesla Supercharger — Downey, CA, 90241 (Tesla · DC Fast · 72 kW)
  5. DOWNEYHYUNDAI CPE250 1 — Downey, CA, 90241 (ChargePoint Network · DC Fast · 62.5 kW)
  6. Downey Nissan — Downey, CA, 90241 (Non-Networked · DC Fast · 50 kW)
  7. G&M OIL CHEVRON #142 — Downey, CA, 90242 (ChargePoint Network · DC Fast · 50 kW)
  8. Stonewood Center — Downey, CA, 90241 (eVgo Network · DC Fast · 50 kW)
  9. Downey Promenade — Downey, CA, 90242 (eVgo Network · DC Fast · 50 kW)
  10. US Bank Downey — Downey, CA, 90241 (EVCS · DC Fast · 50 kW)
  11. DOWNEYHYUNDAI CPE250 2 — Downey, CA, 90241 (ChargePoint Network · DC Fast · 40 kW)
  12. Hertz Car Rental — Downey, CA, 90241 (LOOP · Level 2 · 7.7 kW)

Nearby cities with EV charging coverage

Other cities in California we cover with full charging data and site profitability scoring — useful for comparing footprints across the state.

How profitability scores work

Every score on EV Data Map blends location demand, competition and operating economics into a single 0–100 number. Demand is modeled from registered EV count, commute and through-traffic patterns, daytime worker population, retail and hospitality footprint, and tourism inflows. Competition uses the count and quality of nearby existing chargers — including DC fast power, network reliability and dwell-fit. Operating economics include estimated electricity tariffs, demand-charge exposure, expected utilization, and capital cost for the recommended hardware mix.

For Downey specifically, our model accounts for local commute corridors, nearby interstate and US-highway traffic, the existing footprint of 11 DC fast and 21 Level 2 sites, and the typical dwell profile of the surrounding land use. The result is a per-address score plus a recommended configuration — number of stalls, target power level and network — that maximises projected revenue.

Frequently asked questions

How many EV charging stations are in Downey, California?
There are 32 public electric vehicle charging locations in Downey, California, with a combined 169 individual chargers. 11 locations offer DC fast charging and 21 provide Level 2 charging.
What is the largest EV charging network in Downey?
ChargePoint Network operates the most public charging locations in Downey with 16 sites, followed by Non-Networked with 4 sites.
How much does it cost to install an EV charger in Downey?
Level 2 EV chargers in Downey typically install for $4,000–$12,000 per port including make-ready. DC fast installs run $80,000–$250,000+ per port depending on power level, utility upgrades and trenching.
What permits and incentives apply to EV chargers in Downey?
Most Downey projects need an electrical permit (and a building permit plus utility coordination for DC fast). Sites can typically stack the federal 30C tax credit (up to 30% / $100,000 per commercial charger in eligible census tracts) with California state, utility and NEVI-funded programs.
How long does it take to install an EV charger in Downey?
A typical commercial Level 2 installation in Downey energizes in 4–8 weeks from site survey. DC fast installs run 4–9 months because of utility service upgrades, transformer lead times and switchgear.
How long does an EV charger in Downey take to become profitable?
Payback in Downey depends on utilization, electricity tariffs (especially demand charges) and incentives captured. Well-sited Level 2 stations typically reach payback in 3–5 years; DC fast sites with strong throughput in 3–6 years.