Install EV Chargers in Buena Park, California

Install EV chargers or analyze a site in Buena Park, California. 18 existing public charging locations (11 DC fast, 7 Level 2). Free 0–100 profitability score on any Buena Park address from EV Data Map by Charge Rigs.

Buena Park, California is served by 18 public electric vehicle charging locations operating 108 individual chargers — an average of 6.0 chargers per site. Of those locations, 11 (61%) offer DC fast charging suitable for road-trip stops and short-dwell sessions, while 7 (39%) provide Level 2 charging for longer dwell times such as workplace, retail and overnight parking.

The largest charging network in Buena Park is ChargePoint Network with 8 locations, followed by Non-Networked with 2. Average DC fast power across the city is approximately 117 kW, which puts most fast-charging stalls in the modern 150 kW–350 kW class capable of delivering a meaningful state-of-charge top-up in 15–30 minutes for a typical EV.

EV Data Map is an EVSE and DC Fast Charger location analyzer that scores every potential charging site in the United States from 0 to 100 for DC Fast Charger ROI, combining EV ownership density, daytime population, traffic, demographics, nearby competing chargers, dwell-time characteristics of surrounding land use, and grid capacity. Use the analyzer below to enter any address in Buena Park and receive an instant ROI score, demand projection, and recommended charger configuration.

What to know about charging in Buena Park

Buena Park stands out with a competitive and diverse EV charging landscape, featuring 18 public locations operated by eight distinct networks. ChargePoint Network dominates, claiming 44% of the sites, which fosters competitive pricing and reliable uptime for drivers. The city’s 11 DC fast charging stations average a robust 117 kW, with the top station capable of delivering 350 kW, catering to drivers seeking quicker charging options. With 18% of DC fast sites rated at 150 kW or higher, new operators offering similar high-power hardware can effectively position themselves in the local market. Additionally, the division between fast and Level 2 charging addresses varying driver needs, while EV Data Map can help identify strategic placement opportunities, maximizing the impact of the current charging infrastructure.

Buena Park charging by the numbers

Locations
18
Chargers
108
DC Fast locations
11
Level 2 locations
7

DC fast share: 61% of locations. Level 2 share: 39%. Average chargers per site: 6.0. Average DC fast power: 117 kW.

Buena Park charging — local snapshot

Top operator share
ChargePoint Network runs 44% of public locations across 8 networks.
Average DC fast power
117 kW (fastest stall: 350 kW)
High-power share
18% of DC fast sites are 150 kW-class or higher
Mix
61% DC fast / 39% Level 2 across 18 locations
Estimated DC ports
81 fast-charging ports city-wide

Charging networks in Buena Park

The following operators run public charging in Buena Park, ranked by number of locations.

Featured charging locations in Buena Park

A selection of higher-power public charging locations across Buena Park, sorted by power level.

  1. Target T2082 (Buena Park, CA) — Buena Park, CA, 90621 (Electrify America · DC Fast · 350 kW)
  2. Nexus Town Center Shopping Center - Tesla Supercharger — Buena Park, CA, 90620 (Tesla · DC Fast · 250 kW)
  3. KEN GRODY FORD DC3 PL — Buena Park, CA, 90621 (ChargePoint Network · DC Fast · 120 kW)
  4. KEN GRODY FORD DC SVC LOT PL — Buena Park, CA, 90621 (ChargePoint Network · DC Fast · 120 kW)
  5. KEN GRODY FORD DC1 PL — Buena Park, CA, 90621 (ChargePoint Network · DC Fast · 120 kW)
  6. The Source OC - Tesla Supercharger — Buena Park, CA, 90621 (Tesla · DC Fast · 72 kW)
  7. Hampton Inn Suites Buena Park — Buena Park, CA, 90621 (EVGATEWAY · DC Fast · 60 kW)
  8. Buena Park Nissan — Buena Park, CA, 90621 (Non-Networked · DC Fast · 50 kW)
  9. Courtyard Anaheim Buena Park — Buena Park, CA, 90620 (eVgo Network · DC Fast · 50 kW)
  10. Buena Park Downtown — Buena Park, CA, 90620 (Non-Networked · DC Fast · 50 kW)
  11. US Bank Buena Park - La Palma — Buena Park, CA, 90620 (EVCS · DC Fast · 50 kW)
  12. 7282 Orangethorpe Ave — Buena Park, CA, 90621 (LOOP · Level 2 · 7.7 kW)

Nearby cities with EV charging coverage

Other cities in California we cover with full charging data and site profitability scoring — useful for comparing footprints across the state.

How profitability scores work

Every score on EV Data Map blends location demand, competition and operating economics into a single 0–100 number. Demand is modeled from registered EV count, commute and through-traffic patterns, daytime worker population, retail and hospitality footprint, and tourism inflows. Competition uses the count and quality of nearby existing chargers — including DC fast power, network reliability and dwell-fit. Operating economics include estimated electricity tariffs, demand-charge exposure, expected utilization, and capital cost for the recommended hardware mix.

For Buena Park specifically, our model accounts for local commute corridors, nearby interstate and US-highway traffic, the existing footprint of 11 DC fast and 7 Level 2 sites, and the typical dwell profile of the surrounding land use. The result is a per-address score plus a recommended configuration — number of stalls, target power level and network — that maximises projected revenue.

Frequently asked questions

How many EV charging stations are in Buena Park, California?
There are 18 public electric vehicle charging locations in Buena Park, California, with a combined 108 individual chargers. 11 locations offer DC fast charging and 7 provide Level 2 charging.
What is the largest EV charging network in Buena Park?
ChargePoint Network operates the most public charging locations in Buena Park with 8 sites, followed by Non-Networked with 2 sites.
How much does it cost to install an EV charger in Buena Park?
Level 2 EV chargers in Buena Park typically install for $4,000–$12,000 per port including make-ready. DC fast installs run $80,000–$250,000+ per port depending on power level, utility upgrades and trenching.
What permits and incentives apply to EV chargers in Buena Park?
Most Buena Park projects need an electrical permit (and a building permit plus utility coordination for DC fast). Sites can typically stack the federal 30C tax credit (up to 30% / $100,000 per commercial charger in eligible census tracts) with California state, utility and NEVI-funded programs.
How long does it take to install an EV charger in Buena Park?
A typical commercial Level 2 installation in Buena Park energizes in 4–8 weeks from site survey. DC fast installs run 4–9 months because of utility service upgrades, transformer lead times and switchgear.
How long does an EV charger in Buena Park take to become profitable?
Payback in Buena Park depends on utilization, electricity tariffs (especially demand charges) and incentives captured. Well-sited Level 2 stations typically reach payback in 3–5 years; DC fast sites with strong throughput in 3–6 years.

Related coverage