Install EV Chargers in Fullerton, California

Install EV chargers or analyze a site in Fullerton, California. 123 existing public charging locations (7 DC fast, 116 Level 2). Free 0–100 profitability score on any Fullerton address from EV Data Map by Charge Rigs.

Fullerton, California is served by 123 public electric vehicle charging locations operating 252 individual chargers — an average of 2.0 chargers per site. Of those locations, 7 (6%) offer DC fast charging suitable for road-trip stops and short-dwell sessions, while 116 (94%) provide Level 2 charging for longer dwell times such as workplace, retail and overnight parking.

The largest charging network in Fullerton is ChargePoint Network with 116 locations, followed by Tesla with 2. Average DC fast power across the city is approximately 163 kW, which puts most fast-charging stalls in the modern 150 kW–350 kW class capable of delivering a meaningful state-of-charge top-up in 15–30 minutes for a typical EV.

EV Data Map is an EVSE and DC Fast Charger location analyzer that scores every potential charging site in the United States from 0 to 100 for DC Fast Charger ROI, combining EV ownership density, daytime population, traffic, demographics, nearby competing chargers, dwell-time characteristics of surrounding land use, and grid capacity. Use the analyzer below to enter any address in Fullerton and receive an instant ROI score, demand projection, and recommended charger configuration.

What to know about charging in Fullerton

In Fullerton, California, the charging landscape is notably characterized by the dominance of the ChargePoint Network, which accounts for 94% of the city’s 123 public charging locations. This concentration within a single operating network enhances reliability but also presents competitive challenges for new site developers. The local DC fast charging infrastructure comprises 7 locations, averaging 163 kW, with 43% of them classified as 150 kW or higher, including a peak stall delivering 350 kW. This positions Fullerton at the forefront of high-power charging options, making it essential for potential operators to consider offering similar or superior power capabilities to attract EV drivers, who prioritize efficient charging options in navigation apps.

Fullerton charging by the numbers

Locations
123
Chargers
252
DC Fast locations
7
Level 2 locations
116

DC fast share: 6% of locations. Level 2 share: 94%. Average chargers per site: 2.0. Average DC fast power: 163 kW.

Fullerton charging — local snapshot

Top operator share
ChargePoint Network runs 94% of public locations across 6 networks.
Average DC fast power
163 kW (fastest stall: 350 kW)
High-power share
43% of DC fast sites are 150 kW-class or higher
Mix
6% DC fast / 94% Level 2 across 123 locations
Estimated DC ports
37 fast-charging ports city-wide

Charging networks in Fullerton

The following operators run public charging in Fullerton, ranked by number of locations.

Featured charging locations in Fullerton

A selection of higher-power public charging locations across Fullerton, sorted by power level.

  1. Target T1383 (Fullerton, CA) — FULLERTON, CA, 92833 (Electrify America · DC Fast · 350 kW)
  2. Fullerton Metrocenter - Tesla Supercharger — Fullerton, CA, 92832 (Tesla · DC Fast · 325 kW)
  3. Fullerton Town Center - Tesla Supercharger — Fullerton, CA, 92832 (Tesla · DC Fast · 250 kW)
  4. CSU FULLERTON DCFC 02 — Fullerton, CA, 92831 (ChargePoint Network · DC Fast · 62.5 kW)
  5. Propel Fuels - Shell — Fullerton, CA, 92831 (Non-Networked · DC Fast · 50 kW)
  6. US Bank Fullerton — Fullerton, CA, 92832 (EVCS · DC Fast · 50 kW)
  7. CSU FULLERTON DCFC 01 — Fullerton, CA, 92831 (ChargePoint Network · DC Fast · 50 kW)
  8. Aspect — Fullerton, CA, 92832 (LOOP · Level 2 · 7.7 kW)
  9. Avignon Apartment Homes — Fullerton, CA, 92833 (LOOP · Level 2 · 7.7 kW)
  10. 1835 SUNNYCREST 121 — Fullerton, CA, 92835 (ChargePoint Network · Level 2 · 6.5 kW)
  11. FJUHSD FUHS 1 — Fullerton, CA, 92832 (ChargePoint Network · Level 2 · 6.5 kW)
  12. PARK STRUCTURE FULLERTON 1 — Fullerton, CA, 92832 (ChargePoint Network · Level 2 · 6.5 kW)

Nearby cities with EV charging coverage

Other cities in California we cover with full charging data and site profitability scoring — useful for comparing footprints across the state.

How profitability scores work

Every score on EV Data Map blends location demand, competition and operating economics into a single 0–100 number. Demand is modeled from registered EV count, commute and through-traffic patterns, daytime worker population, retail and hospitality footprint, and tourism inflows. Competition uses the count and quality of nearby existing chargers — including DC fast power, network reliability and dwell-fit. Operating economics include estimated electricity tariffs, demand-charge exposure, expected utilization, and capital cost for the recommended hardware mix.

For Fullerton specifically, our model accounts for local commute corridors, nearby interstate and US-highway traffic, the existing footprint of 7 DC fast and 116 Level 2 sites, and the typical dwell profile of the surrounding land use. The result is a per-address score plus a recommended configuration — number of stalls, target power level and network — that maximises projected revenue.

Frequently asked questions

How many EV charging stations are in Fullerton, California?
There are 123 public electric vehicle charging locations in Fullerton, California, with a combined 252 individual chargers. 7 locations offer DC fast charging and 116 provide Level 2 charging.
What is the largest EV charging network in Fullerton?
ChargePoint Network operates the most public charging locations in Fullerton with 116 sites, followed by Tesla with 2 sites.
How much does it cost to install an EV charger in Fullerton?
Level 2 EV chargers in Fullerton typically install for $4,000–$12,000 per port including make-ready. DC fast installs run $80,000–$250,000+ per port depending on power level, utility upgrades and trenching.
What permits and incentives apply to EV chargers in Fullerton?
Most Fullerton projects need an electrical permit (and a building permit plus utility coordination for DC fast). Sites can typically stack the federal 30C tax credit (up to 30% / $100,000 per commercial charger in eligible census tracts) with California state, utility and NEVI-funded programs.
How long does it take to install an EV charger in Fullerton?
A typical commercial Level 2 installation in Fullerton energizes in 4–8 weeks from site survey. DC fast installs run 4–9 months because of utility service upgrades, transformer lead times and switchgear.
How long does an EV charger in Fullerton take to become profitable?
Payback in Fullerton depends on utilization, electricity tariffs (especially demand charges) and incentives captured. Well-sited Level 2 stations typically reach payback in 3–5 years; DC fast sites with strong throughput in 3–6 years.