Install EV Chargers in Cypress, California

Install EV chargers or analyze a site in Cypress, California. 54 existing public charging locations (4 DC fast, 50 Level 2). Free 0–100 profitability score on any Cypress address from EV Data Map by Charge Rigs.

Cypress, California is served by 54 public electric vehicle charging locations operating 115 individual chargers — an average of 2.1 chargers per site. Of those locations, 4 (7%) offer DC fast charging suitable for road-trip stops and short-dwell sessions, while 50 (93%) provide Level 2 charging for longer dwell times such as workplace, retail and overnight parking.

The largest charging network in Cypress is ChargePoint Network with 50 locations, followed by eVgo Network with 2. Average DC fast power across the city is approximately 325 kW, which puts most fast-charging stalls in the modern 150 kW–350 kW class capable of delivering a meaningful state-of-charge top-up in 15–30 minutes for a typical EV.

EV Data Map is an EVSE and DC Fast Charger location analyzer that scores every potential charging site in the United States from 0 to 100 for DC Fast Charger ROI, combining EV ownership density, daytime population, traffic, demographics, nearby competing chargers, dwell-time characteristics of surrounding land use, and grid capacity. Use the analyzer below to enter any address in Cypress and receive an instant ROI score, demand projection, and recommended charger configuration.

What to know about charging in Cypress

Cypress, California, offers a distinctive EV charging landscape primarily dominated by the ChargePoint Network, which operates 93% of the city’s 54 public charging locations. This concentration on a single network affects both reliability and pricing, making it crucial for new site developers to consider competitive advantages. The city features an impressive ultra-fast charging capability, with all four DC fast locations boasting an average power of 325 kW and the highest stall reaching 350 kW. While only 7% of public chargers are DC fast, these sites attract attention due to their power levels, presenting opportunities for competitors to position lower-cost 150-350 kW options strategically. Leveraging the local charging dynamics can identify valuable growth points in this market.

Cypress charging by the numbers

Locations
54
Chargers
115
DC Fast locations
4
Level 2 locations
50

DC fast share: 7% of locations. Level 2 share: 93%. Average chargers per site: 2.1. Average DC fast power: 325 kW.

Cypress charging — local snapshot

Top operator share
ChargePoint Network runs 93% of public locations across 4 networks.
Average DC fast power
325 kW (fastest stall: 350 kW)
High-power share
100% of DC fast sites are 150 kW-class or higher
Mix
7% DC fast / 93% Level 2 across 54 locations
Estimated DC ports
28 fast-charging ports city-wide

Charging networks in Cypress

The following operators run public charging in Cypress, ranked by number of locations.

Featured charging locations in Cypress

A selection of higher-power public charging locations across Cypress, sorted by power level.

  1. Hampton Inn Los Angeles-Orange County-Cypress — Cypress, CA, 90630 (eVgo Network · DC Fast · 350 kW)
  2. Chase Bank - 10011 Valley View St — Cypress, CA, 90630 (eVgo Network · DC Fast · 350 kW)
  3. Target T0229 (Cypress, CA) — Cypress, CA, 90630 (Electrify America · DC Fast · 350 kW)
  4. Los Alamitos Race Course - Tesla Supercharger — Cypress, CA, 90720 (Tesla · DC Fast · 250 kW)
  5. CITYOFCYPRESS CYPRESS PARK 3 — Cypress, CA, 90630 (ChargePoint Network · Level 2 · 6.5 kW)
  6. CITYOFCYPRESS CYPRESS PARK 1 — Cypress, CA, 90630 (ChargePoint Network · Level 2 · 6.5 kW)
  7. M&O 11 — Cypress, CA, 90630 (ChargePoint Network · Level 2 · 6.5 kW)
  8. M&O 30 — Cypress, CA, 90630 (ChargePoint Network · Level 2 · 6.5 kW)
  9. CITYOFCYPRESS CERRITOS 6 — Cypress, CA, 90630 (ChargePoint Network · Level 2 · 6.5 kW)
  10. M&O 14 — Cypress, CA, 90630 (ChargePoint Network · Level 2 · 6.5 kW)
  11. M&O 26 — Cypress, CA, 90630 (ChargePoint Network · Level 2 · 6.5 kW)
  12. CITYOFCYPRESS CERRITOS 1 — Cypress, CA, 90630 (ChargePoint Network · Level 2 · 6.5 kW)

Nearby cities with EV charging coverage

Other cities in California we cover with full charging data and site profitability scoring — useful for comparing footprints across the state.

How profitability scores work

Every score on EV Data Map blends location demand, competition and operating economics into a single 0–100 number. Demand is modeled from registered EV count, commute and through-traffic patterns, daytime worker population, retail and hospitality footprint, and tourism inflows. Competition uses the count and quality of nearby existing chargers — including DC fast power, network reliability and dwell-fit. Operating economics include estimated electricity tariffs, demand-charge exposure, expected utilization, and capital cost for the recommended hardware mix.

For Cypress specifically, our model accounts for local commute corridors, nearby interstate and US-highway traffic, the existing footprint of 4 DC fast and 50 Level 2 sites, and the typical dwell profile of the surrounding land use. The result is a per-address score plus a recommended configuration — number of stalls, target power level and network — that maximises projected revenue.

Frequently asked questions

How many EV charging stations are in Cypress, California?
There are 54 public electric vehicle charging locations in Cypress, California, with a combined 115 individual chargers. 4 locations offer DC fast charging and 50 provide Level 2 charging.
What is the largest EV charging network in Cypress?
ChargePoint Network operates the most public charging locations in Cypress with 50 sites, followed by eVgo Network with 2 sites.
How much does it cost to install an EV charger in Cypress?
Level 2 EV chargers in Cypress typically install for $4,000–$12,000 per port including make-ready. DC fast installs run $80,000–$250,000+ per port depending on power level, utility upgrades and trenching.
What permits and incentives apply to EV chargers in Cypress?
Most Cypress projects need an electrical permit (and a building permit plus utility coordination for DC fast). Sites can typically stack the federal 30C tax credit (up to 30% / $100,000 per commercial charger in eligible census tracts) with California state, utility and NEVI-funded programs.
How long does it take to install an EV charger in Cypress?
A typical commercial Level 2 installation in Cypress energizes in 4–8 weeks from site survey. DC fast installs run 4–9 months because of utility service upgrades, transformer lead times and switchgear.
How long does an EV charger in Cypress take to become profitable?
Payback in Cypress depends on utilization, electricity tariffs (especially demand charges) and incentives captured. Well-sited Level 2 stations typically reach payback in 3–5 years; DC fast sites with strong throughput in 3–6 years.