Install EV Chargers in Campbell, California

Install EV chargers or analyze a site in Campbell, California. 60 existing public charging locations (11 DC fast, 49 Level 2). Free 0–100 profitability score on any Campbell address from EV Data Map by Charge Rigs.

Campbell, California is served by 60 public electric vehicle charging locations operating 147 individual chargers — an average of 2.5 chargers per site. Of those locations, 11 (18%) offer DC fast charging suitable for road-trip stops and short-dwell sessions, while 49 (82%) provide Level 2 charging for longer dwell times such as workplace, retail and overnight parking.

The largest charging network in Campbell is ChargePoint Network with 44 locations, followed by Blink Network with 6. Average DC fast power across the city is approximately 239 kW, which puts most fast-charging stalls in the modern 150 kW–350 kW class capable of delivering a meaningful state-of-charge top-up in 15–30 minutes for a typical EV.

EV Data Map is an EVSE and DC Fast Charger location analyzer that scores every potential charging site in the United States from 0 to 100 for DC Fast Charger ROI, combining EV ownership density, daytime population, traffic, demographics, nearby competing chargers, dwell-time characteristics of surrounding land use, and grid capacity. Use the analyzer below to enter any address in Campbell and receive an instant ROI score, demand projection, and recommended charger configuration.

What to know about charging in Campbell

Campbell, California's charging infrastructure is characterized by a strong reliance on the ChargePoint Network, which operates 73% of the city's 60 public charging locations, ensuring high reliability and network uptime. Of the 11 DC fast charging stations, the impressive average power of 239 kW, with 82% rated at 150 kW or higher, positions them at the forefront of ultrafast charging options in the region. With a significant number of DC fast ports available, new operators focusing on 150–350 kW hardware can effectively capture the high-demand EV driver market. When considering site development in Campbell, it's crucial to analyze this distinct power distribution alongside the competitive landscape shaped by various networks and the growing local EV user community.

Campbell charging by the numbers

Locations
60
Chargers
147
DC Fast locations
11
Level 2 locations
49

DC fast share: 18% of locations. Level 2 share: 82%. Average chargers per site: 2.5. Average DC fast power: 239 kW.

Campbell charging — local snapshot

Top operator share
ChargePoint Network runs 73% of public locations across 8 networks.
Average DC fast power
239 kW (fastest stall: 500 kW)
High-power share
82% of DC fast sites are 150 kW-class or higher
Mix
18% DC fast / 82% Level 2 across 60 locations
Estimated DC ports
30 fast-charging ports city-wide

Charging networks in Campbell

The following operators run public charging in Campbell, ranked by number of locations.

Featured charging locations in Campbell

A selection of higher-power public charging locations across Campbell, sorted by power level.

  1. Kirkwood Plaza - Tesla Supercharger — Campbell, CA, 95008 (Tesla · DC Fast · 500 kW)
  2. CHARGEPOINT HQ PL1.0 — Campbell, CA, 95008 (ChargePoint Network · DC Fast · 360 kW)
  3. Nob Hill Campbell #606 — Campbell, CA, 95008 (eVgo Network · DC Fast · 350 kW)
  4. CHARGEPOINT 242-16-DC-PL2 — Campbell, CA, 95008 (ChargePoint Network · DC Fast · 280 kW)
  5. CHARGEPOINT 242-06-DC-250 — Campbell, CA, 95008 (ChargePoint Network · DC Fast · 250 kW)
  6. CHARGEPOINT 242-07-DC-250 — Campbell, CA, 95008 (ChargePoint Network · DC Fast · 250 kW)
  7. CHARGEPOINT 242-17-DC-PL1 — Campbell, CA, 95008 (ChargePoint Network · DC Fast · 200 kW)
  8. CHARGEPOINT 242-01-DC-280 — Campbell, CA, 95008 (ChargePoint Network · DC Fast · 160 kW)
  9. CHARGEPOINT 242-02-DC-280 — Campbell, CA, 95008 (ChargePoint Network · DC Fast · 160 kW)
  10. CHARGEPOINT 254-67-DC-280ML — Campbell, CA, 95008 (ChargePoint Network · DC Fast · 80 kW)
  11. CHARGEPOINT 254-64-DC-250 — Campbell, CA, 95008 (ChargePoint Network · DC Fast · 40 kW)
  12. CHARGEPOINT 240-02-AC-6KADA — Campbell, CA, 95008 (ChargePoint Network · Level 2 · 19.2 kW)

Nearby cities with EV charging coverage

Other cities in California we cover with full charging data and site profitability scoring — useful for comparing footprints across the state.

How profitability scores work

Every score on EV Data Map blends location demand, competition and operating economics into a single 0–100 number. Demand is modeled from registered EV count, commute and through-traffic patterns, daytime worker population, retail and hospitality footprint, and tourism inflows. Competition uses the count and quality of nearby existing chargers — including DC fast power, network reliability and dwell-fit. Operating economics include estimated electricity tariffs, demand-charge exposure, expected utilization, and capital cost for the recommended hardware mix.

For Campbell specifically, our model accounts for local commute corridors, nearby interstate and US-highway traffic, the existing footprint of 11 DC fast and 49 Level 2 sites, and the typical dwell profile of the surrounding land use. The result is a per-address score plus a recommended configuration — number of stalls, target power level and network — that maximises projected revenue.

Frequently asked questions

How many EV charging stations are in Campbell, California?
There are 60 public electric vehicle charging locations in Campbell, California, with a combined 147 individual chargers. 11 locations offer DC fast charging and 49 provide Level 2 charging.
What is the largest EV charging network in Campbell?
ChargePoint Network operates the most public charging locations in Campbell with 44 sites, followed by Blink Network with 6 sites.
How much does it cost to install an EV charger in Campbell?
Level 2 EV chargers in Campbell typically install for $4,000–$12,000 per port including make-ready. DC fast installs run $80,000–$250,000+ per port depending on power level, utility upgrades and trenching.
What permits and incentives apply to EV chargers in Campbell?
Most Campbell projects need an electrical permit (and a building permit plus utility coordination for DC fast). Sites can typically stack the federal 30C tax credit (up to 30% / $100,000 per commercial charger in eligible census tracts) with California state, utility and NEVI-funded programs.
How long does it take to install an EV charger in Campbell?
A typical commercial Level 2 installation in Campbell energizes in 4–8 weeks from site survey. DC fast installs run 4–9 months because of utility service upgrades, transformer lead times and switchgear.
How long does an EV charger in Campbell take to become profitable?
Payback in Campbell depends on utilization, electricity tariffs (especially demand charges) and incentives captured. Well-sited Level 2 stations typically reach payback in 3–5 years; DC fast sites with strong throughput in 3–6 years.

Related coverage