Install EV Chargers in Coronado, California

Install EV chargers or analyze a site in Coronado, California. 20 existing public charging locations (2 DC fast, 18 Level 2). Free 0–100 profitability score on any Coronado address from EV Data Map by Charge Rigs.

Coronado, California is served by 20 public electric vehicle charging locations operating 47 individual chargers — an average of 2.4 chargers per site. Of those locations, 2 (10%) offer DC fast charging suitable for road-trip stops and short-dwell sessions, while 18 (90%) provide Level 2 charging for longer dwell times such as workplace, retail and overnight parking.

The largest charging network in Coronado is ChargePoint Network with 11 locations, followed by Blink Network with 3. Average DC fast power across the city is approximately 200 kW, which puts most fast-charging stalls in the modern 150 kW–350 kW class capable of delivering a meaningful state-of-charge top-up in 15–30 minutes for a typical EV.

EV Data Map is an EVSE and DC Fast Charger location analyzer that scores every potential charging site in the United States from 0 to 100 for DC Fast Charger ROI, combining EV ownership density, daytime population, traffic, demographics, nearby competing chargers, dwell-time characteristics of surrounding land use, and grid capacity. Use the analyzer below to enter any address in Coronado and receive an instant ROI score, demand projection, and recommended charger configuration.

What to know about charging in Coronado

Coronado boasts a competitive public charging landscape with 20 locations powered by 7 distinct networks, fostering a dynamic environment for EV drivers. ChargePoint Network leads with 55% of these sites, promoting competitive pricing and uptime while encouraging users to prioritize charging power and amenities over brand loyalty. The two DC fast charging stations average an impressive 200 kW, with one reaching a peak of 350 kW, positioning Coronado as a leader in ultra-fast charging options. Notably, half of the fast chargers are 150 kW-class or higher, making them appealing choices for drivers seeking quick top-ups. As local charging needs evolve, Coronado's mix of DC fast and Level 2 stations provides a nuanced and efficient solution for various driving patterns.

Coronado charging by the numbers

Locations
20
Chargers
47
DC Fast locations
2
Level 2 locations
18

DC fast share: 10% of locations. Level 2 share: 90%. Average chargers per site: 2.4. Average DC fast power: 200 kW.

Coronado charging — local snapshot

Top operator share
ChargePoint Network runs 55% of public locations across 7 networks.
Average DC fast power
200 kW (fastest stall: 350 kW)
High-power share
50% of DC fast sites are 150 kW-class or higher
Mix
10% DC fast / 90% Level 2 across 20 locations
Estimated DC ports
5 fast-charging ports city-wide

Charging networks in Coronado

The following operators run public charging in Coronado, ranked by number of locations.

Featured charging locations in Coronado

A selection of higher-power public charging locations across Coronado, sorted by power level.

  1. Vons Coronado — Coronado, CA, 92118 (eVgo Network · DC Fast · 350 kW)
  2. US Bank Coronado — Coronado, CA, 92118 (EVCS · DC Fast · 50 kW)
  3. City of Coronado City Hall — Coronado, CA, 92118 (Blink Network · Level 2 · 19.3 kW)
  4. Coronado Point — Coronado, CA, 92118 (Blink Network · Level 2 · 17 kW)
  5. Coronado Cays — Coronado, CA, 92118 (OpConnect · Level 2 · 7.7 kW)
  6. Hotel del Coronado — Coronado, CA, 92118 (Non-Networked · Level 2 · 7.2 kW)
  7. Coronado Island Marriott Resort & Spa — Coronado, CA, 92118 (NOODOE · Level 2 · 7 kW)
  8. Second Street and B Avenue — Coronado, CA, 92118 (Blink Network · Level 2 · 6.7 kW)
  9. HOTEL DEL EV CHARGER 5 P2 — Coronado, CA, 92118 (ChargePoint Network · Level 2 · 6.5 kW)
  10. HOTEL DEL EV CHARGER 4 P2 — Coronado, CA, 92118 (ChargePoint Network · Level 2 · 6.5 kW)
  11. HOTEL DEL EV CHARGER 6 P1 — Coronado, CA, 92118 (ChargePoint Network · Level 2 · 6.5 kW)
  12. HOTEL DEL EV CHARGER 1 P2 — Coronado, CA, 92118 (ChargePoint Network · Level 2 · 6.5 kW)

Nearby cities with EV charging coverage

Other cities in California we cover with full charging data and site profitability scoring — useful for comparing footprints across the state.

How profitability scores work

Every score on EV Data Map blends location demand, competition and operating economics into a single 0–100 number. Demand is modeled from registered EV count, commute and through-traffic patterns, daytime worker population, retail and hospitality footprint, and tourism inflows. Competition uses the count and quality of nearby existing chargers — including DC fast power, network reliability and dwell-fit. Operating economics include estimated electricity tariffs, demand-charge exposure, expected utilization, and capital cost for the recommended hardware mix.

For Coronado specifically, our model accounts for local commute corridors, nearby interstate and US-highway traffic, the existing footprint of 2 DC fast and 18 Level 2 sites, and the typical dwell profile of the surrounding land use. The result is a per-address score plus a recommended configuration — number of stalls, target power level and network — that maximises projected revenue.

Frequently asked questions

How many EV charging stations are in Coronado, California?
There are 20 public electric vehicle charging locations in Coronado, California, with a combined 47 individual chargers. 2 locations offer DC fast charging and 18 provide Level 2 charging.
What is the largest EV charging network in Coronado?
ChargePoint Network operates the most public charging locations in Coronado with 11 sites, followed by Blink Network with 3 sites.
How much does it cost to install an EV charger in Coronado?
Level 2 EV chargers in Coronado typically install for $4,000–$12,000 per port including make-ready. DC fast installs run $80,000–$250,000+ per port depending on power level, utility upgrades and trenching.
What permits and incentives apply to EV chargers in Coronado?
Most Coronado projects need an electrical permit (and a building permit plus utility coordination for DC fast). Sites can typically stack the federal 30C tax credit (up to 30% / $100,000 per commercial charger in eligible census tracts) with California state, utility and NEVI-funded programs.
How long does it take to install an EV charger in Coronado?
A typical commercial Level 2 installation in Coronado energizes in 4–8 weeks from site survey. DC fast installs run 4–9 months because of utility service upgrades, transformer lead times and switchgear.
How long does an EV charger in Coronado take to become profitable?
Payback in Coronado depends on utilization, electricity tariffs (especially demand charges) and incentives captured. Well-sited Level 2 stations typically reach payback in 3–5 years; DC fast sites with strong throughput in 3–6 years.

Related coverage