Install EV chargers or analyze a site in San Diego, California. 905 existing public charging locations (93 DC fast, 812 Level 2). Free 0–100 profitability score on any San Diego address from EV Data Map by Charge Rigs.
San Diego, California is served by 905 public electric vehicle charging locations operating 2,999 individual chargers — an average of 3.3 chargers per site. Of those locations, 93 (10%) offer DC fast charging suitable for road-trip stops and short-dwell sessions, while 812 (90%) provide Level 2 charging for longer dwell times such as workplace, retail and overnight parking.
The largest charging network in San Diego is ChargePoint Network with 699 locations, followed by Blink Network with 49. Average DC fast power across the city is approximately 181 kW, which puts most fast-charging stalls in the modern 150 kW–350 kW class capable of delivering a meaningful state-of-charge top-up in 15–30 minutes for a typical EV.
EV Data Map is an EVSE and DC Fast Charger location analyzer that scores every potential charging site in the United States from 0 to 100 for DC Fast Charger ROI, combining EV ownership density, daytime population, traffic, demographics, nearby competing chargers, dwell-time characteristics of surrounding land use, and grid capacity. Use the analyzer below to enter any address in San Diego and receive an instant ROI score, demand projection, and recommended charger configuration.
What to know about charging in San Diego
San Diego’s EV charging landscape is heavily influenced by ChargePoint Network, which operates 77% of the 903 public charging locations, creating a unique reliance on a single provider for uptime and pricing. With 93 DC fast charging stations averaging 181 kW and featuring a top power stall of 350 kW, the region offers competitive options, particularly with 55% of these DC fast sites rated at 150 kW or higher. This modern infrastructure presents a compelling opportunity for new entrants offering similar high-power capabilities, especially as just 10% of public locations are DC fast chargers, indicating a significant demand for quick charging solutions among local drivers.
San Diego charging by the numbers
Locations
905
Chargers
2,999
DC Fast locations
93
Level 2 locations
812
DC fast share: 10% of locations. Level 2 share: 90%. Average chargers per site: 3.3. Average DC fast power: 181 kW.
San Diego charging — local snapshot
Top operator share
ChargePoint Network runs 77% of public locations across 20 networks.
Average DC fast power
181 kW (fastest stall: 350 kW)
High-power share
55% of DC fast sites are 150 kW-class or higher
Mix
10% DC fast / 90% Level 2 across 905 locations
Estimated DC ports
617 fast-charging ports city-wide
Charging networks in San Diego
The following operators run public charging in San Diego, ranked by number of locations.
ChargePoint Network — 699 locations
Blink Network — 49 locations
POWERFLEX — 30 locations
Tesla Destination — 27 locations
Tesla — 25 locations
eVgo Network — 16 locations
Electrify America — 13 locations
Non-Networked — 11 locations
Featured charging locations in San Diego
A selection of higher-power public charging locations across San Diego, sorted by power level.
Vestar Penasquitos Village (San Diego, CA) — San Diego, CA, 92129 (Electrify America · DC Fast · 350 kW)
Fashion Valley Mall South (San Diego, CA) — San Diego, CA, 92108 (Electrify America · DC Fast · 350 kW)
Regency Point Loma Plaza (San Diego, CA) — San Diego, CA, 92110 (Electrify America · DC Fast · 350 kW)
Las Americas Premium Outlets (San Diego, CA) — San Diego, CA, 92173 (Electrify America · DC Fast · 350 kW)
Mira Mesa Mall — San Diego, CA, 92126 (eVgo Network · DC Fast · 350 kW)
Fashion Valley Mall North (San Diego, CA) — San Diego, CA, 92108 (Electrify America · DC Fast · 350 kW)
Target T1846 (College Ave, San Diego, CA) — San Diego, CA, 92115 (Electrify America · DC Fast · 350 kW)
Balboa Mesa Shopping Center — San Diego, CA, 92111 (eVgo Network · DC Fast · 350 kW)
Mission Valley (San Diego, CA) — San Diego, CA, 92108 (Electrify America · DC Fast · 350 kW)
Sheraton Mission Valley San Diego — San Diego, CA, 92108 (eVgo Network · DC Fast · 350 kW)
Stonecrest Plaza — San Diego, CA, 92123 (eVgo Network · DC Fast · 350 kW)
Walmart 2177 (San Diego, CA) — San Diego, CA, 92123 (Electrify America · DC Fast · 350 kW)
Nearby cities with EV charging coverage
Other cities in California we cover with full charging data and site profitability scoring — useful for comparing footprints across the state.
Every score on EV Data Map blends location demand, competition and operating economics into a single 0–100 number. Demand is modeled from registered EV count, commute and through-traffic patterns, daytime worker population, retail and hospitality footprint, and tourism inflows. Competition uses the count and quality of nearby existing chargers — including DC fast power, network reliability and dwell-fit. Operating economics include estimated electricity tariffs, demand-charge exposure, expected utilization, and capital cost for the recommended hardware mix.
For San Diego specifically, our model accounts for local commute corridors, nearby interstate and US-highway traffic, the existing footprint of 93 DC fast and 812 Level 2 sites, and the typical dwell profile of the surrounding land use. The result is a per-address score plus a recommended configuration — number of stalls, target power level and network — that maximises projected revenue.
Frequently asked questions
How many EV charging stations are in San Diego, California?
There are 905 public electric vehicle charging locations in San Diego, California, with a combined 2,999 individual chargers. 93 locations offer DC fast charging and 812 provide Level 2 charging.
What is the largest EV charging network in San Diego?
ChargePoint Network operates the most public charging locations in San Diego with 699 sites, followed by Blink Network with 49 sites.
How much does it cost to install an EV charger in San Diego?
Level 2 EV chargers in San Diego typically install for $4,000–$12,000 per port including make-ready. DC fast installs run $80,000–$250,000+ per port depending on power level, utility upgrades and trenching.
What permits and incentives apply to EV chargers in San Diego?
Most San Diego projects need an electrical permit (and a building permit plus utility coordination for DC fast). Sites can typically stack the federal 30C tax credit (up to 30% / $100,000 per commercial charger in eligible census tracts) with California state, utility and NEVI-funded programs.
How long does it take to install an EV charger in San Diego?
A typical commercial Level 2 installation in San Diego energizes in 4–8 weeks from site survey. DC fast installs run 4–9 months because of utility service upgrades, transformer lead times and switchgear.
How long does an EV charger in San Diego take to become profitable?
Payback in San Diego depends on utilization, electricity tariffs (especially demand charges) and incentives captured. Well-sited Level 2 stations typically reach payback in 3–5 years; DC fast sites with strong throughput in 3–6 years.