Install EV Chargers in Covina, California

Install EV chargers or analyze a site in Covina, California. 20 existing public charging locations (6 DC fast, 14 Level 2). Free 0–100 profitability score on any Covina address from EV Data Map by Charge Rigs.

Covina, California is served by 20 public electric vehicle charging locations operating 76 individual chargers — an average of 3.8 chargers per site. Of those locations, 6 (30%) offer DC fast charging suitable for road-trip stops and short-dwell sessions, while 14 (70%) provide Level 2 charging for longer dwell times such as workplace, retail and overnight parking.

The largest charging network in Covina is ChargePoint Network with 14 locations, followed by Tesla with 1. Average DC fast power across the city is approximately 207 kW, which puts most fast-charging stalls in the modern 150 kW–350 kW class capable of delivering a meaningful state-of-charge top-up in 15–30 minutes for a typical EV.

EV Data Map is an EVSE and DC Fast Charger location analyzer that scores every potential charging site in the United States from 0 to 100 for DC Fast Charger ROI, combining EV ownership density, daytime population, traffic, demographics, nearby competing chargers, dwell-time characteristics of surrounding land use, and grid capacity. Use the analyzer below to enter any address in Covina and receive an instant ROI score, demand projection, and recommended charger configuration.

What to know about charging in Covina

Covina, California offers a notable concentration of public charging, primarily dominated by ChargePoint Network, which accounts for 70% of the 20 available locations. With 30% of these sites featuring DC fast chargers, the average output reaches an impressive 207 kW, positioning the city as a competitive market for ultra-fast charging solutions. Notably, 67% of the DC fast chargers are rated 150 kW-class or higher, indicating a strong potential for attracting drivers seeking rapid charging options. For site developers, this landscape presents both a challenge and an opportunity, as new operators must consider the established network's reliability and pricing while positioning their installations to meet the growing demand for high-powered charging options in Covina and the neighboring areas.

Covina charging by the numbers

Locations
20
Chargers
76
DC Fast locations
6
Level 2 locations
14

DC fast share: 30% of locations. Level 2 share: 70%. Average chargers per site: 3.8. Average DC fast power: 207 kW.

Covina charging — local snapshot

Top operator share
ChargePoint Network runs 70% of public locations across 7 networks.
Average DC fast power
207 kW (fastest stall: 350 kW)
High-power share
67% of DC fast sites are 150 kW-class or higher
Mix
30% DC fast / 70% Level 2 across 20 locations
Estimated DC ports
51 fast-charging ports city-wide

Charging networks in Covina

The following operators run public charging in Covina, ranked by number of locations.

Featured charging locations in Covina

A selection of higher-power public charging locations across Covina, sorted by power level.

  1. IKEA 413 Los Angeles (Covina, CA) — Covina, CA, 91723 (Electrify America · DC Fast · 350 kW)
  2. Covina Town Square — Covina, CA, 91722 (eVgo Network · DC Fast · 350 kW)
  3. IKEA - Tesla Supercharger — Covina, CA, 91723 (Tesla · DC Fast · 250 kW)
  4. 7Charge - Covina 22548 — Covina, CA, 91722 (7CHARGE · DC Fast · 180 kW)
  5. Inter Community Hospital Covina — Covina, CA, 91723 (NAYAX_ENERGY · DC Fast · 60 kW)
  6. Covina Hills Chevrolet — Covina, CA, 91723 (EV Connect · DC Fast · 50 kW)
  7. COVINA EV 124 E COLLEGE — Covina, CA, 91723 (ChargePoint Network · Level 2 · 6.5 kW)
  8. IKEA USA COVINA 2 — Covina, CA, 91723 (ChargePoint Network · Level 2 · 6.5 kW)
  9. COVINA EV METRO 1 — Covina, CA, 91723 (ChargePoint Network · Level 2 · 6.5 kW)
  10. COVINA EV METRO 2 — Covina, CA, 91723 (ChargePoint Network · Level 2 · 6.5 kW)
  11. IKEA USA COVINA 1 — Covina, CA, 91723 (ChargePoint Network · Level 2 · 6.5 kW)
  12. OAKMONT MANAGE STATION 1 — Covina, CA, 91724 (ChargePoint Network · Level 2 · 6.5 kW)

Nearby cities with EV charging coverage

Other cities in California we cover with full charging data and site profitability scoring — useful for comparing footprints across the state.

How profitability scores work

Every score on EV Data Map blends location demand, competition and operating economics into a single 0–100 number. Demand is modeled from registered EV count, commute and through-traffic patterns, daytime worker population, retail and hospitality footprint, and tourism inflows. Competition uses the count and quality of nearby existing chargers — including DC fast power, network reliability and dwell-fit. Operating economics include estimated electricity tariffs, demand-charge exposure, expected utilization, and capital cost for the recommended hardware mix.

For Covina specifically, our model accounts for local commute corridors, nearby interstate and US-highway traffic, the existing footprint of 6 DC fast and 14 Level 2 sites, and the typical dwell profile of the surrounding land use. The result is a per-address score plus a recommended configuration — number of stalls, target power level and network — that maximises projected revenue.

Frequently asked questions

How many EV charging stations are in Covina, California?
There are 20 public electric vehicle charging locations in Covina, California, with a combined 76 individual chargers. 6 locations offer DC fast charging and 14 provide Level 2 charging.
What is the largest EV charging network in Covina?
ChargePoint Network operates the most public charging locations in Covina with 14 sites, followed by Tesla with 1 sites.
How much does it cost to install an EV charger in Covina?
Level 2 EV chargers in Covina typically install for $4,000–$12,000 per port including make-ready. DC fast installs run $80,000–$250,000+ per port depending on power level, utility upgrades and trenching.
What permits and incentives apply to EV chargers in Covina?
Most Covina projects need an electrical permit (and a building permit plus utility coordination for DC fast). Sites can typically stack the federal 30C tax credit (up to 30% / $100,000 per commercial charger in eligible census tracts) with California state, utility and NEVI-funded programs.
How long does it take to install an EV charger in Covina?
A typical commercial Level 2 installation in Covina energizes in 4–8 weeks from site survey. DC fast installs run 4–9 months because of utility service upgrades, transformer lead times and switchgear.
How long does an EV charger in Covina take to become profitable?
Payback in Covina depends on utilization, electricity tariffs (especially demand charges) and incentives captured. Well-sited Level 2 stations typically reach payback in 3–5 years; DC fast sites with strong throughput in 3–6 years.

Related coverage