Install EV Chargers in City of Industry, California

Install EV chargers or analyze a site in City of Industry, California. 81 existing public charging locations (5 DC fast, 76 Level 2). Free 0–100 profitability score on any City of Industry address from EV Data Map by Charge Rigs.

City of Industry, California is served by 81 public electric vehicle charging locations operating 185 individual chargers — an average of 2.3 chargers per site. Of those locations, 5 (6%) offer DC fast charging suitable for road-trip stops and short-dwell sessions, while 76 (94%) provide Level 2 charging for longer dwell times such as workplace, retail and overnight parking.

The largest charging network in City of Industry is ChargePoint Network with 76 locations, followed by Tesla with 2. Average DC fast power across the city is approximately 147 kW, which puts most fast-charging stalls in the modern 150 kW–350 kW class capable of delivering a meaningful state-of-charge top-up in 15–30 minutes for a typical EV.

EV Data Map is an EVSE and DC Fast Charger location analyzer that scores every potential charging site in the United States from 0 to 100 for DC Fast Charger ROI, combining EV ownership density, daytime population, traffic, demographics, nearby competing chargers, dwell-time characteristics of surrounding land use, and grid capacity. Use the analyzer below to enter any address in City of Industry and receive an instant ROI score, demand projection, and recommended charger configuration.

What to know about charging in City of Industry

City of Industry, California, features a charging landscape that is heavily influenced by ChargePoint Network, which dominates 94% of its 81 public charging sites. This reliance on a single operator may affect the reliability and pricing strategy for new entrants considering competition. With just 6% of the locations offering DC fast charging—averaging 147 kW and boasting a maximum of 250 kW—there is potential for enhanced service through higher-capacity installations. Notably, 40% of the fast charging sites operate at 150 kW-class or above, suggesting that any new high-power DC charger would stand out in local charging maps. For developers, understanding the existing distribution and power dynamics is crucial for identifying opportunities in this evolving market.

City of Industry charging by the numbers

Locations
81
Chargers
185
DC Fast locations
5
Level 2 locations
76

DC fast share: 6% of locations. Level 2 share: 94%. Average chargers per site: 2.3. Average DC fast power: 147 kW.

City of Industry charging — local snapshot

Top operator share
ChargePoint Network runs 94% of public locations across 5 networks.
Average DC fast power
147 kW (fastest stall: 250 kW)
High-power share
40% of DC fast sites are 150 kW-class or higher
Mix
6% DC fast / 94% Level 2 across 81 locations
Estimated DC ports
36 fast-charging ports city-wide

Charging networks in City of Industry

The following operators run public charging in City of Industry, ranked by number of locations.

Featured charging locations in City of Industry

A selection of higher-power public charging locations across City of Industry, sorted by power level.

  1. Seasons Place - Tesla Supercharger — City of Industry, CA, 91748 (Tesla · DC Fast · 250 kW)
  2. Puente Hills Mall - Tesla Supercharger — City of Industry, CA, 91748 (Tesla · DC Fast · 250 kW)
  3. Chevrolet of Puente Hills — City of Industry, CA, 91748 (CHARGESMART_EV · DC Fast · 120 kW)
  4. PH SUBARU PH SUBARU — City of Industry, CA, 91748 (ChargePoint Network · DC Fast · 62.5 kW)
  5. Puente Hills Nissan — City of Industry, CA, 91748 (Non-Networked · DC Fast · 50 kW)
  6. AXCA 18138 — City of Industry, CA, 91748 (ChargePoint Network · Level 2 · 11.5 kW)
  7. Pacific Palms Resort - Tesla Destination — City of Industry, CA, 91744 (Tesla Destination · Level 2 · 7.2 kW)
  8. 12801 12801 #1 — City of Industry, CA, 91746 (ChargePoint Network · Level 2 · 6.5 kW)
  9. 12801 12801 #9 — City of Industry, CA, 91746 (ChargePoint Network · Level 2 · 6.5 kW)
  10. ATRIUM ATRIUM #8 — City of Industry, CA, 91746 (ChargePoint Network · Level 2 · 6.5 kW)
  11. INDUSTRY STATION 15 — City of Industry, CA, 91789 (ChargePoint Network · Level 2 · 6.5 kW)
  12. INDUSTRY STATION 13 — City of Industry, CA, 91789 (ChargePoint Network · Level 2 · 6.5 kW)

Nearby cities with EV charging coverage

Other cities in California we cover with full charging data and site profitability scoring — useful for comparing footprints across the state.

How profitability scores work

Every score on EV Data Map blends location demand, competition and operating economics into a single 0–100 number. Demand is modeled from registered EV count, commute and through-traffic patterns, daytime worker population, retail and hospitality footprint, and tourism inflows. Competition uses the count and quality of nearby existing chargers — including DC fast power, network reliability and dwell-fit. Operating economics include estimated electricity tariffs, demand-charge exposure, expected utilization, and capital cost for the recommended hardware mix.

For City of Industry specifically, our model accounts for local commute corridors, nearby interstate and US-highway traffic, the existing footprint of 5 DC fast and 76 Level 2 sites, and the typical dwell profile of the surrounding land use. The result is a per-address score plus a recommended configuration — number of stalls, target power level and network — that maximises projected revenue.

Frequently asked questions

How many EV charging stations are in City of Industry, California?
There are 81 public electric vehicle charging locations in City of Industry, California, with a combined 185 individual chargers. 5 locations offer DC fast charging and 76 provide Level 2 charging.
What is the largest EV charging network in City of Industry?
ChargePoint Network operates the most public charging locations in City of Industry with 76 sites, followed by Tesla with 2 sites.
How much does it cost to install an EV charger in City of Industry?
Level 2 EV chargers in City of Industry typically install for $4,000–$12,000 per port including make-ready. DC fast installs run $80,000–$250,000+ per port depending on power level, utility upgrades and trenching.
What permits and incentives apply to EV chargers in City of Industry?
Most City of Industry projects need an electrical permit (and a building permit plus utility coordination for DC fast). Sites can typically stack the federal 30C tax credit (up to 30% / $100,000 per commercial charger in eligible census tracts) with California state, utility and NEVI-funded programs.
How long does it take to install an EV charger in City of Industry?
A typical commercial Level 2 installation in City of Industry energizes in 4–8 weeks from site survey. DC fast installs run 4–9 months because of utility service upgrades, transformer lead times and switchgear.
How long does an EV charger in City of Industry take to become profitable?
Payback in City of Industry depends on utilization, electricity tariffs (especially demand charges) and incentives captured. Well-sited Level 2 stations typically reach payback in 3–5 years; DC fast sites with strong throughput in 3–6 years.

Related coverage