Install EV Chargers in Seal Beach, California

Install EV chargers or analyze a site in Seal Beach, California. 15 existing public charging locations (5 DC fast, 10 Level 2). Free 0–100 profitability score on any Seal Beach address from EV Data Map by Charge Rigs.

Seal Beach, California is served by 15 public electric vehicle charging locations operating 33 individual chargers — an average of 2.2 chargers per site. Of those locations, 5 (33%) offer DC fast charging suitable for road-trip stops and short-dwell sessions, while 10 (67%) provide Level 2 charging for longer dwell times such as workplace, retail and overnight parking.

The largest charging network in Seal Beach is ChargePoint Network with 10 locations, followed by Electrify America with 2. Average DC fast power across the city is approximately 226 kW, which puts most fast-charging stalls in the modern 150 kW–350 kW class capable of delivering a meaningful state-of-charge top-up in 15–30 minutes for a typical EV.

EV Data Map is an EVSE and DC Fast Charger location analyzer that scores every potential charging site in the United States from 0 to 100 for DC Fast Charger ROI, combining EV ownership density, daytime population, traffic, demographics, nearby competing chargers, dwell-time characteristics of surrounding land use, and grid capacity. Use the analyzer below to enter any address in Seal Beach and receive an instant ROI score, demand projection, and recommended charger configuration.

What to know about charging in Seal Beach

In Seal Beach, California, the EV charging landscape is significantly influenced by ChargePoint Network, which operates 67% of the city's 15 public charging locations, ensuring high reliability and consistent pricing. The presence of five DC fast charging sites, averaging an impressive 226 kW and featuring the fastest stall at 350 kW, positions the city as a competitive player in ultra-fast charging options. Notably, 60% of these DC fast stations are rated at 150 kW or higher, attracting EV drivers seeking quicker turnaround times. The strategic mix of 33% DC fast chargers alongside Level 2 options caters to both immediate needs and longer-stay charging demands, creating unique opportunities for operators looking to establish or expand their presence in this thriving market.

Seal Beach charging by the numbers

Locations
15
Chargers
33
DC Fast locations
5
Level 2 locations
10

DC fast share: 33% of locations. Level 2 share: 67%. Average chargers per site: 2.2. Average DC fast power: 226 kW.

Seal Beach charging — local snapshot

Top operator share
ChargePoint Network runs 67% of public locations across 5 networks.
Average DC fast power
226 kW (fastest stall: 350 kW)
High-power share
60% of DC fast sites are 150 kW-class or higher
Mix
33% DC fast / 67% Level 2 across 15 locations
Estimated DC ports
14 fast-charging ports city-wide

Charging networks in Seal Beach

The following operators run public charging in Seal Beach, ranked by number of locations.

Featured charging locations in Seal Beach

A selection of higher-power public charging locations across Seal Beach, sorted by power level.

  1. Chase Bank - 801 Pacific Coast Hwy — Seal Beach, CA, 90740 (eVgo Network · DC Fast · 350 kW)
  2. Regency Seal Beach Center (Seal Beach, CA) — Seal Beach, CA, 90740 (Electrify America · DC Fast · 350 kW)
  3. Vestar Shops at Rossmoor (Seal Beach, CA) — Seal Beach, CA, 90740 (Electrify America · DC Fast · 350 kW)
  4. H&S ENERGY H&S 2002 — Seal Beach, CA, 90740 (ChargePoint Network · DC Fast · 50 kW)
  5. H&S ENERGY H&S 2002.2 — Seal Beach, CA, 90740 (ChargePoint Network · DC Fast · 31 kW)
  6. Ayres Hotel Seal Beach — Seal Beach, CA, 90740 (LOOP · Level 2 · 7.7 kW)
  7. ACP MANAGEMENT SEAL BEACH #1 — Seal Beach, CA, 90740 (ChargePoint Network · Level 2 · 6.5 kW)
  8. GRF EV CHARGING GRF EV 3 — Seal Beach, CA, 90740 (ChargePoint Network · Level 2 · 6.5 kW)
  9. CITY OF SEALBCH 120 MAIN ST — Seal Beach, CA, 90740 (ChargePoint Network · Level 2 · 6.5 kW)
  10. CITY OF SEALBCH NORTH BEACH — Seal Beach, CA, 90740 (ChargePoint Network · Level 2 · 6.5 kW)
  11. GRF EV CHARGING GRF EV 4 — Seal Beach, CA, 90740 (ChargePoint Network · Level 2 · 6.5 kW)
  12. GRF EV CHARGING GRF EV 2 — Seal Beach, CA, 90740 (ChargePoint Network · Level 2 · 6.5 kW)

Nearby cities with EV charging coverage

Other cities in California we cover with full charging data and site profitability scoring — useful for comparing footprints across the state.

How profitability scores work

Every score on EV Data Map blends location demand, competition and operating economics into a single 0–100 number. Demand is modeled from registered EV count, commute and through-traffic patterns, daytime worker population, retail and hospitality footprint, and tourism inflows. Competition uses the count and quality of nearby existing chargers — including DC fast power, network reliability and dwell-fit. Operating economics include estimated electricity tariffs, demand-charge exposure, expected utilization, and capital cost for the recommended hardware mix.

For Seal Beach specifically, our model accounts for local commute corridors, nearby interstate and US-highway traffic, the existing footprint of 5 DC fast and 10 Level 2 sites, and the typical dwell profile of the surrounding land use. The result is a per-address score plus a recommended configuration — number of stalls, target power level and network — that maximises projected revenue.

Frequently asked questions

How many EV charging stations are in Seal Beach, California?
There are 15 public electric vehicle charging locations in Seal Beach, California, with a combined 33 individual chargers. 5 locations offer DC fast charging and 10 provide Level 2 charging.
What is the largest EV charging network in Seal Beach?
ChargePoint Network operates the most public charging locations in Seal Beach with 10 sites, followed by Electrify America with 2 sites.
How much does it cost to install an EV charger in Seal Beach?
Level 2 EV chargers in Seal Beach typically install for $4,000–$12,000 per port including make-ready. DC fast installs run $80,000–$250,000+ per port depending on power level, utility upgrades and trenching.
What permits and incentives apply to EV chargers in Seal Beach?
Most Seal Beach projects need an electrical permit (and a building permit plus utility coordination for DC fast). Sites can typically stack the federal 30C tax credit (up to 30% / $100,000 per commercial charger in eligible census tracts) with California state, utility and NEVI-funded programs.
How long does it take to install an EV charger in Seal Beach?
A typical commercial Level 2 installation in Seal Beach energizes in 4–8 weeks from site survey. DC fast installs run 4–9 months because of utility service upgrades, transformer lead times and switchgear.
How long does an EV charger in Seal Beach take to become profitable?
Payback in Seal Beach depends on utilization, electricity tariffs (especially demand charges) and incentives captured. Well-sited Level 2 stations typically reach payback in 3–5 years; DC fast sites with strong throughput in 3–6 years.