Install EV Chargers in El Monte, California

Install EV chargers or analyze a site in El Monte, California. 28 existing public charging locations (6 DC fast, 22 Level 2). Free 0–100 profitability score on any El Monte address from EV Data Map by Charge Rigs.

El Monte, California is served by 28 public electric vehicle charging locations operating 94 individual chargers — an average of 3.4 chargers per site. Of those locations, 6 (21%) offer DC fast charging suitable for road-trip stops and short-dwell sessions, while 22 (79%) provide Level 2 charging for longer dwell times such as workplace, retail and overnight parking.

The largest charging network in El Monte is ChargePoint Network with 16 locations, followed by EV Connect with 4. Average DC fast power across the city is approximately 188 kW, which puts most fast-charging stalls in the modern 150 kW–350 kW class capable of delivering a meaningful state-of-charge top-up in 15–30 minutes for a typical EV.

EV Data Map is an EVSE and DC Fast Charger location analyzer that scores every potential charging site in the United States from 0 to 100 for DC Fast Charger ROI, combining EV ownership density, daytime population, traffic, demographics, nearby competing chargers, dwell-time characteristics of surrounding land use, and grid capacity. Use the analyzer below to enter any address in El Monte and receive an instant ROI score, demand projection, and recommended charger configuration.

What to know about charging in El Monte

El Monte features a robust and competitive charging landscape with 28 public locations spread across six distinct networks, enhancing choice for EV drivers. Leading the market, ChargePoint Network operates 57% of the sites, contributing to competitive pricing and reliability. The city supports advanced charging capabilities, with half of the six DC fast chargers rated at 150 kW or higher, peaking at an impressive 350 kW. This emphasis on high-power options, comprising 21% of total charging locations, caters to drivers seeking speed and efficiency. The varied offerings encourage users to prioritize power and amenities in their route planning, while the remaining Level 2 stations provide versatile options for longer dwell times.

El Monte charging by the numbers

Locations
28
Chargers
94
DC Fast locations
6
Level 2 locations
22

DC fast share: 21% of locations. Level 2 share: 79%. Average chargers per site: 3.4. Average DC fast power: 188 kW.

El Monte charging — local snapshot

Top operator share
ChargePoint Network runs 57% of public locations across 6 networks.
Average DC fast power
188 kW (fastest stall: 350 kW)
High-power share
50% of DC fast sites are 150 kW-class or higher
Mix
21% DC fast / 79% Level 2 across 28 locations
Estimated DC ports
45 fast-charging ports city-wide

Charging networks in El Monte

The following operators run public charging in El Monte, ranked by number of locations.

Featured charging locations in El Monte

A selection of higher-power public charging locations across El Monte, sorted by power level.

  1. Chase Bank - 4749 Santa Anita Ave — El Monte, CA, 91731 (eVgo Network · DC Fast · 350 kW)
  2. Fresh & Flash Market - Tesla Supercharger — El Monte, CA, 91732 (Tesla · DC Fast · 325 kW)
  3. El Monte, CA - Peck Road - Tesla Supercharger — El Monte, CA, 91732 (Tesla · DC Fast · 250 kW)
  4. Five Points Plaza (El Monte) — El Monte, CA, 91732 (eVgo Network · DC Fast · 100 kW)
  5. Ross Nissan El Monte — El Monte, CA, 91731 (Non-Networked · DC Fast · 50 kW)
  6. Santa Fe Trail Plaza — El Monte, CA, 91731 (eVgo Network · DC Fast · 50 kW)
  7. Mountain View High School — El Monte, CA, 91732 (EV Connect · Level 2 · 16.8 kW)
  8. Aston at Gateway — El Monte, CA, 91731 (LOOP · Level 2 · 7.7 kW)
  9. El Monte Union High School District Office — El Monte, CA, 91731 (EV Connect · Level 2 · 7.2 kW)
  10. San Gabriel Valley Airport — El Monte, CA, 91731 (Non-Networked · Level 2 · 7.2 kW)
  11. Arroyo High School — El Monte, CA, 91731 (EV Connect · Level 2 · 7.2 kW)
  12. El Monte High School — El Monte, CA, 91731 (EV Connect · Level 2 · 7.2 kW)

Nearby cities with EV charging coverage

Other cities in California we cover with full charging data and site profitability scoring — useful for comparing footprints across the state.

How profitability scores work

Every score on EV Data Map blends location demand, competition and operating economics into a single 0–100 number. Demand is modeled from registered EV count, commute and through-traffic patterns, daytime worker population, retail and hospitality footprint, and tourism inflows. Competition uses the count and quality of nearby existing chargers — including DC fast power, network reliability and dwell-fit. Operating economics include estimated electricity tariffs, demand-charge exposure, expected utilization, and capital cost for the recommended hardware mix.

For El Monte specifically, our model accounts for local commute corridors, nearby interstate and US-highway traffic, the existing footprint of 6 DC fast and 22 Level 2 sites, and the typical dwell profile of the surrounding land use. The result is a per-address score plus a recommended configuration — number of stalls, target power level and network — that maximises projected revenue.

Frequently asked questions

How many EV charging stations are in El Monte, California?
There are 28 public electric vehicle charging locations in El Monte, California, with a combined 94 individual chargers. 6 locations offer DC fast charging and 22 provide Level 2 charging.
What is the largest EV charging network in El Monte?
ChargePoint Network operates the most public charging locations in El Monte with 16 sites, followed by EV Connect with 4 sites.
How much does it cost to install an EV charger in El Monte?
Level 2 EV chargers in El Monte typically install for $4,000–$12,000 per port including make-ready. DC fast installs run $80,000–$250,000+ per port depending on power level, utility upgrades and trenching.
What permits and incentives apply to EV chargers in El Monte?
Most El Monte projects need an electrical permit (and a building permit plus utility coordination for DC fast). Sites can typically stack the federal 30C tax credit (up to 30% / $100,000 per commercial charger in eligible census tracts) with California state, utility and NEVI-funded programs.
How long does it take to install an EV charger in El Monte?
A typical commercial Level 2 installation in El Monte energizes in 4–8 weeks from site survey. DC fast installs run 4–9 months because of utility service upgrades, transformer lead times and switchgear.
How long does an EV charger in El Monte take to become profitable?
Payback in El Monte depends on utilization, electricity tariffs (especially demand charges) and incentives captured. Well-sited Level 2 stations typically reach payback in 3–5 years; DC fast sites with strong throughput in 3–6 years.