Install EV chargers or analyze a site in Monterey Park, California. 13 existing public charging locations (2 DC fast, 11 Level 2). Free 0–100 profitability score on any Monterey Park address from EV Data Map by Charge Rigs.
Monterey Park, California is served by 13 public electric vehicle charging locations operating 49 individual chargers — an average of 3.8 chargers per site. Of those locations, 2 (15%) offer DC fast charging suitable for road-trip stops and short-dwell sessions, while 11 (85%) provide Level 2 charging for longer dwell times such as workplace, retail and overnight parking.
The largest charging network in Monterey Park is ChargePoint Network with 5 locations, followed by EV Connect with 2. Average DC fast power across the city is approximately 200 kW, which puts most fast-charging stalls in the modern 150 kW–350 kW class capable of delivering a meaningful state-of-charge top-up in 15–30 minutes for a typical EV.
EV Data Map is an EVSE and DC Fast Charger location analyzer that scores every potential charging site in the United States from 0 to 100 for DC Fast Charger ROI, combining EV ownership density, daytime population, traffic, demographics, nearby competing chargers, dwell-time characteristics of surrounding land use, and grid capacity. Use the analyzer below to enter any address in Monterey Park and receive an instant ROI score, demand projection, and recommended charger configuration.
Monterey Park features a dynamic public EV charging ecosystem, with 13 locations operated by 8 distinct networks, fostering competitive pricing and uptime for drivers. ChargePoint Network leads as the top provider with 38% of sites, but the variety allows users to choose based on power output and amenities rather than brand loyalty. The city's two DC fast charging sites boast an impressive average power of 200 kW and include a stall that reaches up to 350 kW, positioning them among the top-tier options in the U.S. Notably, 50% of these fast sites are at least 150 kW, catering to the growing demand for rapid charging solutions while Level 2 stations accommodate longer-dwell needs. This strategic mix highlights Monterey Park's potential for enhanced EV infrastructure, driven by user preferences and local traffic patterns.
DC fast share: 15% of locations. Level 2 share: 85%. Average chargers per site: 3.8. Average DC fast power: 200 kW.
The following operators run public charging in Monterey Park, ranked by number of locations.
A selection of higher-power public charging locations across Monterey Park, sorted by power level.
Other cities in California we cover with full charging data and site profitability scoring — useful for comparing footprints across the state.
Every score on EV Data Map blends location demand, competition and operating economics into a single 0–100 number. Demand is modeled from registered EV count, commute and through-traffic patterns, daytime worker population, retail and hospitality footprint, and tourism inflows. Competition uses the count and quality of nearby existing chargers — including DC fast power, network reliability and dwell-fit. Operating economics include estimated electricity tariffs, demand-charge exposure, expected utilization, and capital cost for the recommended hardware mix.
For Monterey Park specifically, our model accounts for local commute corridors, nearby interstate and US-highway traffic, the existing footprint of 2 DC fast and 11 Level 2 sites, and the typical dwell profile of the surrounding land use. The result is a per-address score plus a recommended configuration — number of stalls, target power level and network — that maximises projected revenue.