Install EV Chargers in Breckenridge, Colorado

Install EV chargers or analyze a site in Breckenridge, Colorado. 62 existing public charging locations (1 DC fast, 61 Level 2). Free 0–100 profitability score on any Breckenridge address from EV Data Map by Charge Rigs.

Breckenridge, Colorado is served by 62 public electric vehicle charging locations operating 132 individual chargers — an average of 2.1 chargers per site. Of those locations, 1 (2%) offer DC fast charging suitable for road-trip stops and short-dwell sessions, while 61 (98%) provide Level 2 charging for longer dwell times such as workplace, retail and overnight parking.

The largest charging network in Breckenridge is ChargePoint Network with 52 locations, followed by Blink Network with 4. Average DC fast power across the city is approximately 120 kW, which puts most fast-charging stalls in the modern 150 kW–350 kW class capable of delivering a meaningful state-of-charge top-up in 15–30 minutes for a typical EV.

EV Data Map is an EVSE and DC Fast Charger location analyzer that scores every potential charging site in the United States from 0 to 100 for DC Fast Charger ROI, combining EV ownership density, daytime population, traffic, demographics, nearby competing chargers, dwell-time characteristics of surrounding land use, and grid capacity. Use the analyzer below to enter any address in Breckenridge and receive an instant ROI score, demand projection, and recommended charger configuration.

What to know about charging in Breckenridge

Breckenridge, Colorado, offers a unique EV charging landscape dominated by ChargePoint Network, which encompasses an impressive 84% of the city’s 62 public charging locations. With only 2% classified as DC fast chargers, drivers looking for rapid charging will find a single site averaging 120 kW, a mid-range option relative to national standards. This heavy reliance on ChargePoint not only affects pricing and reliability but also creates an opportunity for new entrants to introduce higher-capacity charging solutions between 150 and 350 kW, enticing users seeking faster options. As the local EV charging infrastructure focuses predominantly on Level 2 stations, understanding these dynamics can assist site developers in strategically addressing the gaps in Breckenridge's network.

Breckenridge charging by the numbers

Locations
62
Chargers
132
DC Fast locations
1
Level 2 locations
61

DC fast share: 2% of locations. Level 2 share: 98%. Average chargers per site: 2.1. Average DC fast power: 120 kW.

Breckenridge charging — local snapshot

Top operator share
ChargePoint Network runs 84% of public locations across 4 networks.
Average DC fast power
120 kW (fastest stall: 120 kW)
High-power share
0% of DC fast sites are 150 kW-class or higher
Mix
2% DC fast / 98% Level 2 across 62 locations
Estimated DC ports
1 fast-charging ports city-wide

Charging networks in Breckenridge

The following operators run public charging in Breckenridge, ranked by number of locations.

Featured charging locations in Breckenridge

A selection of higher-power public charging locations across Breckenridge, sorted by power level.

  1. BRECK XEO BRECKENRDG PL1 — Breckenridge, CO, 80424 (ChargePoint Network · DC Fast · 120 kW)
  2. GRAND COLORADO GC8 #1 — Breckenridge, CO, 80424 (ChargePoint Network · Level 2 · 15.4 kW)
  3. Village at Breckenridge Public — Breckenridge, CO, 80424 (Blink Network · Level 2 · 11.5 kW)
  4. Beaver Run Resort and Conference Center — Breckenridge, CO, 80424 (Blink Network · Level 2 · 10.4 kW)
  5. – Main Street Station — Breckenridge, CO, 80424 (Blink Network · Level 2 · 10.4 kW)
  6. COMNTCO BK GARAGE — Breckenridge, CO, 80424 (ChargePoint Network · Level 2 · 7.7 kW)
  7. ALPENROCK STATION 5 — Breckenridge, CO, 80424 (ChargePoint Network · Level 2 · 7.7 kW)
  8. ALPENROCK STATION 1 — Breckenridge, CO, 80424 (ChargePoint Network · Level 2 · 7.7 kW)
  9. ALPENROCK STATION 6 — Breckenridge, CO, 80424 (ChargePoint Network · Level 2 · 7.7 kW)
  10. ALPENROCK STATION 2 — Breckenridge, CO, 80424 (ChargePoint Network · Level 2 · 7.7 kW)
  11. ALPENROCK STATION 3 — Breckenridge, CO, 80424 (ChargePoint Network · Level 2 · 7.7 kW)
  12. ALPENROCK STATION 4 — Breckenridge, CO, 80424 (ChargePoint Network · Level 2 · 7.7 kW)

Nearby cities with EV charging coverage

Other cities in Colorado we cover with full charging data and site profitability scoring — useful for comparing footprints across the state.

How profitability scores work

Every score on EV Data Map blends location demand, competition and operating economics into a single 0–100 number. Demand is modeled from registered EV count, commute and through-traffic patterns, daytime worker population, retail and hospitality footprint, and tourism inflows. Competition uses the count and quality of nearby existing chargers — including DC fast power, network reliability and dwell-fit. Operating economics include estimated electricity tariffs, demand-charge exposure, expected utilization, and capital cost for the recommended hardware mix.

For Breckenridge specifically, our model accounts for local commute corridors, nearby interstate and US-highway traffic, the existing footprint of 1 DC fast and 61 Level 2 sites, and the typical dwell profile of the surrounding land use. The result is a per-address score plus a recommended configuration — number of stalls, target power level and network — that maximises projected revenue.

Frequently asked questions

How many EV charging stations are in Breckenridge, Colorado?
There are 62 public electric vehicle charging locations in Breckenridge, Colorado, with a combined 132 individual chargers. 1 locations offer DC fast charging and 61 provide Level 2 charging.
What is the largest EV charging network in Breckenridge?
ChargePoint Network operates the most public charging locations in Breckenridge with 52 sites, followed by Blink Network with 4 sites.
How much does it cost to install an EV charger in Breckenridge?
Level 2 EV chargers in Breckenridge typically install for $4,000–$12,000 per port including make-ready. DC fast installs run $80,000–$250,000+ per port depending on power level, utility upgrades and trenching.
What permits and incentives apply to EV chargers in Breckenridge?
Most Breckenridge projects need an electrical permit (and a building permit plus utility coordination for DC fast). Sites can typically stack the federal 30C tax credit (up to 30% / $100,000 per commercial charger in eligible census tracts) with Colorado state, utility and NEVI-funded programs.
How long does it take to install an EV charger in Breckenridge?
A typical commercial Level 2 installation in Breckenridge energizes in 4–8 weeks from site survey. DC fast installs run 4–9 months because of utility service upgrades, transformer lead times and switchgear.
How long does an EV charger in Breckenridge take to become profitable?
Payback in Breckenridge depends on utilization, electricity tariffs (especially demand charges) and incentives captured. Well-sited Level 2 stations typically reach payback in 3–5 years; DC fast sites with strong throughput in 3–6 years.