Install EV Chargers in Erie, Colorado

Install EV chargers or analyze a site in Erie, Colorado. 20 existing public charging locations (1 DC fast, 19 Level 2). Free 0–100 profitability score on any Erie address from EV Data Map by Charge Rigs.

Erie, Colorado is served by 20 public electric vehicle charging locations operating 42 individual chargers — an average of 2.1 chargers per site. Of those locations, 1 (5%) offer DC fast charging suitable for road-trip stops and short-dwell sessions, while 19 (95%) provide Level 2 charging for longer dwell times such as workplace, retail and overnight parking.

The largest charging network in Erie is ChargePoint Network with 19 locations, followed by Electrify America with 1. Average DC fast power across the city is approximately 350 kW, which puts most fast-charging stalls in the modern 150 kW–350 kW class capable of delivering a meaningful state-of-charge top-up in 15–30 minutes for a typical EV.

EV Data Map is an EVSE and DC Fast Charger location analyzer that scores every potential charging site in the United States from 0 to 100 for DC Fast Charger ROI, combining EV ownership density, daytime population, traffic, demographics, nearby competing chargers, dwell-time characteristics of surrounding land use, and grid capacity. Use the analyzer below to enter any address in Erie and receive an instant ROI score, demand projection, and recommended charger configuration.

What to know about charging in Erie

In Erie, Colorado, the public EV charging landscape is predominantly shaped by ChargePoint Network, which operates 95% of the city's 20 charging locations. This reliance on a single operator underscores the importance of evaluating network reliability and pricing before establishing a competitive site. With only one DC fast charger available, averaging an impressive 350 kW, Erie boasts an ultra-fast service that positions it above many regions; all fast chargers are rated at 150 kW-class or higher. While the market is primarily served through Level 2 chargers, the exceptional power offerings are critical differentiators for drivers using navigation apps to locate optimal charging options.

Erie charging by the numbers

Locations
20
Chargers
42
DC Fast locations
1
Level 2 locations
19

DC fast share: 5% of locations. Level 2 share: 95%. Average chargers per site: 2.1. Average DC fast power: 350 kW.

Erie charging — local snapshot

Top operator share
ChargePoint Network runs 95% of public locations across 2 networks.
Average DC fast power
350 kW (fastest stall: 350 kW)
High-power share
100% of DC fast sites are 150 kW-class or higher
Mix
5% DC fast / 95% Level 2 across 20 locations
Estimated DC ports
4 fast-charging ports city-wide

Charging networks in Erie

The following operators run public charging in Erie, ranked by number of locations.

Featured charging locations in Erie

A selection of higher-power public charging locations across Erie, sorted by power level.

  1. Kroger King Soopers 129 (Erie, CO) — Erie, CO, 80516 (Electrify America · DC Fast · 350 kW)
  2. PLUG IN ERIE SCHOFIELD NORTH — Erie, CO, 80516 (ChargePoint Network · Level 2 · 19.2 kW)
  3. ERIE FIELDS ERIE FIELDS EV — Erie, CO, 80516 (ChargePoint Network · Level 2 · 9.6 kW)
  4. PLUG IN ERIE LAWSC EAST — Erie, CO, 80516 (ChargePoint Network · Level 2 · 9.6 kW)
  5. PLUG IN ERIE TOWNHALLCHURCHS — Erie, CO, 80516 (ChargePoint Network · Level 2 · 7.7 kW)
  6. BLDG 2 1 — Erie, CO, 80026 (ChargePoint Network · Level 2 · 6.5 kW)
  7. PLUG IN ERIE ECC NE — Erie, CO, 80516 (ChargePoint Network · Level 2 · 6.5 kW)
  8. BVSD MEADOWLARKK8-S1 — Erie, CO, 80516 (ChargePoint Network · Level 2 · 6.5 kW)
  9. BVSD MEADOWLARKK8-N1 — Erie, CO, 80516 (ChargePoint Network · Level 2 · 6.5 kW)
  10. PLUG IN ERIE COAL CREEK PARK — Erie, CO, 80516 (ChargePoint Network · Level 2 · 6.5 kW)
  11. SVVSD SOARING HEIGHTS — Erie, CO, 80516 (ChargePoint Network · Level 2 · 6.5 kW)
  12. PLUG IN ERIE ECC SW — Erie, CO, 80516 (ChargePoint Network · Level 2 · 6.5 kW)

Nearby cities with EV charging coverage

Other cities in Colorado we cover with full charging data and site profitability scoring — useful for comparing footprints across the state.

How profitability scores work

Every score on EV Data Map blends location demand, competition and operating economics into a single 0–100 number. Demand is modeled from registered EV count, commute and through-traffic patterns, daytime worker population, retail and hospitality footprint, and tourism inflows. Competition uses the count and quality of nearby existing chargers — including DC fast power, network reliability and dwell-fit. Operating economics include estimated electricity tariffs, demand-charge exposure, expected utilization, and capital cost for the recommended hardware mix.

For Erie specifically, our model accounts for local commute corridors, nearby interstate and US-highway traffic, the existing footprint of 1 DC fast and 19 Level 2 sites, and the typical dwell profile of the surrounding land use. The result is a per-address score plus a recommended configuration — number of stalls, target power level and network — that maximises projected revenue.

Frequently asked questions

How many EV charging stations are in Erie, Colorado?
There are 20 public electric vehicle charging locations in Erie, Colorado, with a combined 42 individual chargers. 1 locations offer DC fast charging and 19 provide Level 2 charging.
What is the largest EV charging network in Erie?
ChargePoint Network operates the most public charging locations in Erie with 19 sites, followed by Electrify America with 1 sites.
How much does it cost to install an EV charger in Erie?
Level 2 EV chargers in Erie typically install for $4,000–$12,000 per port including make-ready. DC fast installs run $80,000–$250,000+ per port depending on power level, utility upgrades and trenching.
What permits and incentives apply to EV chargers in Erie?
Most Erie projects need an electrical permit (and a building permit plus utility coordination for DC fast). Sites can typically stack the federal 30C tax credit (up to 30% / $100,000 per commercial charger in eligible census tracts) with Colorado state, utility and NEVI-funded programs.
How long does it take to install an EV charger in Erie?
A typical commercial Level 2 installation in Erie energizes in 4–8 weeks from site survey. DC fast installs run 4–9 months because of utility service upgrades, transformer lead times and switchgear.
How long does an EV charger in Erie take to become profitable?
Payback in Erie depends on utilization, electricity tariffs (especially demand charges) and incentives captured. Well-sited Level 2 stations typically reach payback in 3–5 years; DC fast sites with strong throughput in 3–6 years.

Related coverage