Install EV Chargers in Greenwood Village, Colorado

Install EV chargers or analyze a site in Greenwood Village, Colorado. 22 existing public charging locations (2 DC fast, 20 Level 2). Free 0–100 profitability score on any Greenwood Village address from EV Data Map by Charge Rigs.

Greenwood Village, Colorado is served by 22 public electric vehicle charging locations operating 70 individual chargers — an average of 3.2 chargers per site. Of those locations, 2 (9%) offer DC fast charging suitable for road-trip stops and short-dwell sessions, while 20 (91%) provide Level 2 charging for longer dwell times such as workplace, retail and overnight parking.

The largest charging network in Greenwood Village is ChargePoint Network with 11 locations, followed by Blink Network with 4. Average DC fast power across the city is approximately 338 kW, which puts most fast-charging stalls in the modern 150 kW–350 kW class capable of delivering a meaningful state-of-charge top-up in 15–30 minutes for a typical EV.

EV Data Map is an EVSE and DC Fast Charger location analyzer that scores every potential charging site in the United States from 0 to 100 for DC Fast Charger ROI, combining EV ownership density, daytime population, traffic, demographics, nearby competing chargers, dwell-time characteristics of surrounding land use, and grid capacity. Use the analyzer below to enter any address in Greenwood Village and receive an instant ROI score, demand projection, and recommended charger configuration.

What to know about charging in Greenwood Village

Greenwood Village presents a robust public charging landscape defined by its eight diverse operators across 21 charging locations, with ChargePoint Network holding a notable 52% share. This variety fosters competitive pricing and reliable uptime while allowing drivers to choose charging solutions based on power and amenities. The city boasts two DC fast charging sites featuring an impressive average power of 338 kW, with the fastest available at a remarkable 350 kW—placing it among the most advanced charging offerings in the U.S. With 100% of its DC fast stations rated above 150 kW and a total of approximately 18 DC fast ports, Greenwood Village is well-positioned to meet diverse EV charging needs.

Greenwood Village charging by the numbers

Locations
22
Chargers
70
DC Fast locations
2
Level 2 locations
20

DC fast share: 9% of locations. Level 2 share: 91%. Average chargers per site: 3.2. Average DC fast power: 338 kW.

Greenwood Village charging — local snapshot

Top operator share
ChargePoint Network runs 50% of public locations across 8 networks.
Average DC fast power
338 kW (fastest stall: 350 kW)
High-power share
100% of DC fast sites are 150 kW-class or higher
Mix
9% DC fast / 91% Level 2 across 22 locations
Estimated DC ports
18 fast-charging ports city-wide

Charging networks in Greenwood Village

The following operators run public charging in Greenwood Village, ranked by number of locations.

Featured charging locations in Greenwood Village

A selection of higher-power public charging locations across Greenwood Village, sorted by power level.

  1. Regency Belleview Square (Greenwood Village, CO) — Greenwood Village, CO, 80111 (Electrify America · DC Fast · 350 kW)
  2. Cafe India - Tesla Supercharger — Greenwood Village, CO, 80112 (Tesla · DC Fast · 325 kW)
  3. Empower - Great - West Financial — Greenwood Village, CO, 80111 (Blink Network · Level 2 · 11.5 kW)
  4. La Quinta Inn & Suites Englewood Tech Center — Greenwood Village, CO, 80112 (ENVIROSPARK · Level 2 · 11.1 kW)
  5. The Outlook at Arapahoe Station — Greenwood Village, CO, 80111 (Blink Network · Level 2 · 10 kW)
  6. The Outlook at Arapahoe Station - Tenant Only — Greenwood Village, CO, 80111 (Blink Network · Level 2 · 10 kW)
  7. La Quinta Inn & Suites Denver Englewood Tech Ctr - Tesla Destination — Greenwood Village, CO, 80112 (Tesla Destination · Level 2 · 7.2 kW)
  8. American Lung Association - Denver Clean Cities — Greenwood Village, CO, 80111 (Non-Networked · Level 2 · 7.2 kW)
  9. H5 Data Centers Denver — Greenwood Village, CO, 80111 (EVGATEWAY · Level 2 · 7.2 kW)
  10. AMG National Bank & Trust — Greenwood Village, CO, 80111 (Non-Networked · Level 2 · 7.2 kW)
  11. TRIAD STATION 2 — Greenwood Village, CO, 80111 (ChargePoint Network · Level 2 · 6.5 kW)
  12. TRIAD STATION 4 — Greenwood Village, CO, 80111 (ChargePoint Network · Level 2 · 6.5 kW)

Nearby cities with EV charging coverage

Other cities in Colorado we cover with full charging data and site profitability scoring — useful for comparing footprints across the state.

How profitability scores work

Every score on EV Data Map blends location demand, competition and operating economics into a single 0–100 number. Demand is modeled from registered EV count, commute and through-traffic patterns, daytime worker population, retail and hospitality footprint, and tourism inflows. Competition uses the count and quality of nearby existing chargers — including DC fast power, network reliability and dwell-fit. Operating economics include estimated electricity tariffs, demand-charge exposure, expected utilization, and capital cost for the recommended hardware mix.

For Greenwood Village specifically, our model accounts for local commute corridors, nearby interstate and US-highway traffic, the existing footprint of 2 DC fast and 20 Level 2 sites, and the typical dwell profile of the surrounding land use. The result is a per-address score plus a recommended configuration — number of stalls, target power level and network — that maximises projected revenue.

Frequently asked questions

How many EV charging stations are in Greenwood Village, Colorado?
There are 22 public electric vehicle charging locations in Greenwood Village, Colorado, with a combined 70 individual chargers. 2 locations offer DC fast charging and 20 provide Level 2 charging.
What is the largest EV charging network in Greenwood Village?
ChargePoint Network operates the most public charging locations in Greenwood Village with 11 sites, followed by Blink Network with 4 sites.
How much does it cost to install an EV charger in Greenwood Village?
Level 2 EV chargers in Greenwood Village typically install for $4,000–$12,000 per port including make-ready. DC fast installs run $80,000–$250,000+ per port depending on power level, utility upgrades and trenching.
What permits and incentives apply to EV chargers in Greenwood Village?
Most Greenwood Village projects need an electrical permit (and a building permit plus utility coordination for DC fast). Sites can typically stack the federal 30C tax credit (up to 30% / $100,000 per commercial charger in eligible census tracts) with Colorado state, utility and NEVI-funded programs.
How long does it take to install an EV charger in Greenwood Village?
A typical commercial Level 2 installation in Greenwood Village energizes in 4–8 weeks from site survey. DC fast installs run 4–9 months because of utility service upgrades, transformer lead times and switchgear.
How long does an EV charger in Greenwood Village take to become profitable?
Payback in Greenwood Village depends on utilization, electricity tariffs (especially demand charges) and incentives captured. Well-sited Level 2 stations typically reach payback in 3–5 years; DC fast sites with strong throughput in 3–6 years.

Related coverage