Install EV chargers or analyze a site in Nederland, Colorado. 19 existing public charging locations (0 DC fast, 19 Level 2). Free 0–100 profitability score on any Nederland address from EV Data Map by Charge Rigs.

Nederland, Colorado is served by 19 public electric vehicle charging locations operating 38 individual chargers — an average of 2.0 chargers per site. Of those locations, 0 (0%) offer DC fast charging suitable for road-trip stops and short-dwell sessions, while 19 (100%) provide Level 2 charging for longer dwell times such as workplace, retail and overnight parking.

The largest charging network in Nederland is ChargePoint Network with 19 locations. Average DC fast power across the city is approximately 0 kW, which puts most fast-charging stalls in the modern 150 kW–350 kW class capable of delivering a meaningful state-of-charge top-up in 15–30 minutes for a typical EV.

EV Data Map is an EVSE and DC Fast Charger location analyzer that scores every potential charging site in the United States from 0 to 100 for DC Fast Charger ROI, combining EV ownership density, daytime population, traffic, demographics, nearby competing chargers, dwell-time characteristics of surrounding land use, and grid capacity. Use the analyzer below to enter any address in Nederland and receive an instant ROI score, demand projection, and recommended charger configuration.

What to know about charging in Nederland

In Nederland, Colorado, the public EV charging landscape is exclusively managed by ChargePoint Network, with all 19 charging locations offering Level 2 options and no DC fast chargers available. This unique setup creates a significant opportunity for site developers, as local drivers seeking rapid charging solutions must currently travel outside the city. With 100% reliance on a single network, factors such as uptime and pricing are consistent but leave little room for competition or diversification. The predominance of Level 2 chargers highlights an underserved demand for fast charging, presenting potential for growth in the EV infrastructure to cater to drivers in need of quicker turnarounds.

Nederland charging by the numbers

Locations
19
Chargers
38
DC Fast locations
0
Level 2 locations
19

DC fast share: 0% of locations. Level 2 share: 100%. Average chargers per site: 2.0. Average DC fast power: 0 kW.

Nederland charging — local snapshot

Top operator share
ChargePoint Network runs 100% of public locations.
Mix
0% DC fast / 100% Level 2 across 19 locations

Charging networks in Nederland

The following operators run public charging in Nederland, ranked by number of locations.

Featured charging locations in Nederland

A selection of higher-power public charging locations across Nederland, sorted by power level.

  1. ELDORA ELCP2215 — Nederland, CO, 80466 (ChargePoint Network · Level 2 · 6.5 kW)
  2. NED EV CHARGER STATION 1 — Nederland, CO, 80466 (ChargePoint Network · Level 2 · 6.5 kW)
  3. ELDORA ELCP2204 — Nederland, CO, 80466 (ChargePoint Network · Level 2 · 6.5 kW)
  4. ELDORA ELCP2207 — Nederland, CO, 80466 (ChargePoint Network · Level 2 · 6.5 kW)
  5. ELDORA ELCP2213 — Nederland, CO, 80466 (ChargePoint Network · Level 2 · 6.5 kW)
  6. BVSD NEDERLAND HIGH1 — Nederland, CO, 80466 (ChargePoint Network · Level 2 · 6.5 kW)
  7. BVSD NEDERLAND E1 — Nederland, CO, 80466 (ChargePoint Network · Level 2 · 6.5 kW)
  8. ELDORA ELCP2205 — Nederland, CO, 80466 (ChargePoint Network · Level 2 · 6.5 kW)
  9. ELDORA ELCP2214 — Nederland, CO, 80466 (ChargePoint Network · Level 2 · 6.5 kW)
  10. ELDORA ELCP2203 — Nederland, CO, 80466 (ChargePoint Network · Level 2 · 6.5 kW)
  11. ELDORA ELCP2206 — Nederland, CO, 80466 (ChargePoint Network · Level 2 · 6.5 kW)
  12. ELDORA ELCP2211 — Nederland, CO, 80466 (ChargePoint Network · Level 2 · 6.5 kW)

Nearby cities with EV charging coverage

Other cities in Colorado we cover with full charging data and site profitability scoring — useful for comparing footprints across the state.

How profitability scores work

Every score on EV Data Map blends location demand, competition and operating economics into a single 0–100 number. Demand is modeled from registered EV count, commute and through-traffic patterns, daytime worker population, retail and hospitality footprint, and tourism inflows. Competition uses the count and quality of nearby existing chargers — including DC fast power, network reliability and dwell-fit. Operating economics include estimated electricity tariffs, demand-charge exposure, expected utilization, and capital cost for the recommended hardware mix.

For Nederland specifically, our model accounts for local commute corridors, nearby interstate and US-highway traffic, the existing footprint of 0 DC fast and 19 Level 2 sites, and the typical dwell profile of the surrounding land use. The result is a per-address score plus a recommended configuration — number of stalls, target power level and network — that maximises projected revenue.

Frequently asked questions

How many EV charging stations are in Nederland, Colorado?
There are 19 public electric vehicle charging locations in Nederland, Colorado, with a combined 38 individual chargers. 0 locations offer DC fast charging and 19 provide Level 2 charging.
What is the largest EV charging network in Nederland?
ChargePoint Network operates the most public charging locations in Nederland with 19 sites.
How much does it cost to install an EV charger in Nederland?
Level 2 EV chargers in Nederland typically install for $4,000–$12,000 per port including make-ready. DC fast installs run $80,000–$250,000+ per port depending on power level, utility upgrades and trenching.
What permits and incentives apply to EV chargers in Nederland?
Most Nederland projects need an electrical permit (and a building permit plus utility coordination for DC fast). Sites can typically stack the federal 30C tax credit (up to 30% / $100,000 per commercial charger in eligible census tracts) with Colorado state, utility and NEVI-funded programs.
How long does it take to install an EV charger in Nederland?
A typical commercial Level 2 installation in Nederland energizes in 4–8 weeks from site survey. DC fast installs run 4–9 months because of utility service upgrades, transformer lead times and switchgear.
How long does an EV charger in Nederland take to become profitable?
Payback in Nederland depends on utilization, electricity tariffs (especially demand charges) and incentives captured. Well-sited Level 2 stations typically reach payback in 3–5 years; DC fast sites with strong throughput in 3–6 years.