Install EV chargers or analyze a site in Aventura, Florida. 43 existing public charging locations (2 DC fast, 41 Level 2). Free 0–100 profitability score on any Aventura address from EV Data Map by Charge Rigs.
Aventura, Florida is served by 43 public electric vehicle charging locations operating 125 individual chargers — an average of 2.9 chargers per site. Of those locations, 2 (5%) offer DC fast charging suitable for road-trip stops and short-dwell sessions, while 41 (95%) provide Level 2 charging for longer dwell times such as workplace, retail and overnight parking.
The largest charging network in Aventura is ChargePoint Network with 28 locations, followed by Blink Network with 6. Average DC fast power across the city is approximately 161 kW, which puts most fast-charging stalls in the modern 150 kW–350 kW class capable of delivering a meaningful state-of-charge top-up in 15–30 minutes for a typical EV.
EV Data Map is an EVSE and DC Fast Charger location analyzer that scores every potential charging site in the United States from 0 to 100 for DC Fast Charger ROI, combining EV ownership density, daytime population, traffic, demographics, nearby competing chargers, dwell-time characteristics of surrounding land use, and grid capacity. Use the analyzer below to enter any address in Aventura and receive an instant ROI score, demand projection, and recommended charger configuration.
Aventura, Florida, showcases a well-defined charging landscape, where ChargePoint Network leads with a commanding presence, managing 65% of the city's 43 public charging locations. With only 5% of these offering DC fast charging, the two fast sites stand out due to their impressive average power of 161 kW and a peak capacity of 250 kW, ideal for modern EVs. Notably, half of these fast chargers operate at 150 kW-class or higher, providing a competitive advantage for new entrants utilizing high-capacity hardware. The concentration of sites under a single operator emphasizes the importance of network reliability and pricing structures, offering insights for developers considering opportunities in this strategically situated market.
DC fast share: 5% of locations. Level 2 share: 95%. Average chargers per site: 2.9. Average DC fast power: 161 kW.
The following operators run public charging in Aventura, ranked by number of locations.
A selection of higher-power public charging locations across Aventura, sorted by power level.
Other cities in Florida we cover with full charging data and site profitability scoring — useful for comparing footprints across the state.
Every score on EV Data Map blends location demand, competition and operating economics into a single 0–100 number. Demand is modeled from registered EV count, commute and through-traffic patterns, daytime worker population, retail and hospitality footprint, and tourism inflows. Competition uses the count and quality of nearby existing chargers — including DC fast power, network reliability and dwell-fit. Operating economics include estimated electricity tariffs, demand-charge exposure, expected utilization, and capital cost for the recommended hardware mix.
For Aventura specifically, our model accounts for local commute corridors, nearby interstate and US-highway traffic, the existing footprint of 2 DC fast and 41 Level 2 sites, and the typical dwell profile of the surrounding land use. The result is a per-address score plus a recommended configuration — number of stalls, target power level and network — that maximises projected revenue.