Install EV Chargers in North Miami, Florida

Install EV chargers or analyze a site in North Miami, Florida. 16 existing public charging locations (0 DC fast, 16 Level 2). Free 0–100 profitability score on any North Miami address from EV Data Map by Charge Rigs.

North Miami, Florida is served by 16 public electric vehicle charging locations operating 59 individual chargers — an average of 3.7 chargers per site. Of those locations, 0 (0%) offer DC fast charging suitable for road-trip stops and short-dwell sessions, while 16 (100%) provide Level 2 charging for longer dwell times such as workplace, retail and overnight parking.

The largest charging network in North Miami is ChargePoint Network with 13 locations, followed by Blink Network with 2. Average DC fast power across the city is approximately 0 kW, which puts most fast-charging stalls in the modern 150 kW–350 kW class capable of delivering a meaningful state-of-charge top-up in 15–30 minutes for a typical EV.

EV Data Map is an EVSE and DC Fast Charger location analyzer that scores every potential charging site in the United States from 0 to 100 for DC Fast Charger ROI, combining EV ownership density, daytime population, traffic, demographics, nearby competing chargers, dwell-time characteristics of surrounding land use, and grid capacity. Use the analyzer below to enter any address in North Miami and receive an instant ROI score, demand projection, and recommended charger configuration.

What to know about charging in North Miami

In North Miami, the public EV charging infrastructure is characterized by a concentration of Level 2 chargers, with no DC fast charging options currently available. ChargePoint Network dominates the landscape, operating 81% of the 16 public sites, indicating that potential new entrants must consider this reliance on a single provider for service consistency and reliability. With the lack of DC fast chargers, North Miami presents a unique opportunity for developers to fill this gap, as residents and visitors currently seeking quick charging solutions must look beyond city limits. Addressing this need could not only enhance the local charging ecosystem but also attract more EV users to the area, positioned amidst its neighboring cities.

North Miami charging by the numbers

Locations
16
Chargers
59
DC Fast locations
0
Level 2 locations
16

DC fast share: 0% of locations. Level 2 share: 100%. Average chargers per site: 3.7. Average DC fast power: 0 kW.

North Miami charging — local snapshot

Top operator share
ChargePoint Network runs 81% of public locations across 3 networks.
Mix
0% DC fast / 100% Level 2 across 16 locations

Charging networks in North Miami

The following operators run public charging in North Miami, ranked by number of locations.

Featured charging locations in North Miami

A selection of higher-power public charging locations across North Miami, sorted by power level.

  1. OBE GARDENS RES SW — North Miami, FL, 33161 (ChargePoint Network · Level 2 · 15.4 kW)
  2. OBE GARDENS RES NW — North Miami, FL, 33161 (ChargePoint Network · Level 2 · 15.4 kW)
  3. OBE GARDENS RES SE — North Miami, FL, 33161 (ChargePoint Network · Level 2 · 15.4 kW)
  4. OBE GARDENS RES NE — North Miami, FL, 33161 (ChargePoint Network · Level 2 · 15.4 kW)
  5. OBE RES AT NOMI — North Miami, FL, 33161 (ChargePoint Network · Level 2 · 12 kW)
  6. Manor Biscayne — North Miami, FL, 33181 (Blink Network · Level 2 · 9.6 kW)
  7. Klaus Parking Systems Atlantic — North Miami, FL, 33161 (EVGATEWAY · Level 2 · 9.6 kW)
  8. WARREN HENRY IN 7-2 — North Miami, FL, 33181 (ChargePoint Network · Level 2 · 6.5 kW)
  9. WARREN HENRY IN 7-5 — North Miami, FL, 33181 (ChargePoint Network · Level 2 · 6.5 kW)
  10. OBE 151 BISCAYNE BO — North Miami, FL, 33181 (ChargePoint Network · Level 2 · 6.5 kW)
  11. WARREN HENRY IN 7-3 — North Miami, FL, 33181 (ChargePoint Network · Level 2 · 6.5 kW)
  12. WARREN HENRY IN 7-4 — North Miami, FL, 33181 (ChargePoint Network · Level 2 · 6.5 kW)

Nearby cities with EV charging coverage

Other cities in Florida we cover with full charging data and site profitability scoring — useful for comparing footprints across the state.

How profitability scores work

Every score on EV Data Map blends location demand, competition and operating economics into a single 0–100 number. Demand is modeled from registered EV count, commute and through-traffic patterns, daytime worker population, retail and hospitality footprint, and tourism inflows. Competition uses the count and quality of nearby existing chargers — including DC fast power, network reliability and dwell-fit. Operating economics include estimated electricity tariffs, demand-charge exposure, expected utilization, and capital cost for the recommended hardware mix.

For North Miami specifically, our model accounts for local commute corridors, nearby interstate and US-highway traffic, the existing footprint of 0 DC fast and 16 Level 2 sites, and the typical dwell profile of the surrounding land use. The result is a per-address score plus a recommended configuration — number of stalls, target power level and network — that maximises projected revenue.

Frequently asked questions

How many EV charging stations are in North Miami, Florida?
There are 16 public electric vehicle charging locations in North Miami, Florida, with a combined 59 individual chargers. 0 locations offer DC fast charging and 16 provide Level 2 charging.
What is the largest EV charging network in North Miami?
ChargePoint Network operates the most public charging locations in North Miami with 13 sites, followed by Blink Network with 2 sites.
How much does it cost to install an EV charger in North Miami?
Level 2 EV chargers in North Miami typically install for $4,000–$12,000 per port including make-ready. DC fast installs run $80,000–$250,000+ per port depending on power level, utility upgrades and trenching.
What permits and incentives apply to EV chargers in North Miami?
Most North Miami projects need an electrical permit (and a building permit plus utility coordination for DC fast). Sites can typically stack the federal 30C tax credit (up to 30% / $100,000 per commercial charger in eligible census tracts) with Florida state, utility and NEVI-funded programs.
How long does it take to install an EV charger in North Miami?
A typical commercial Level 2 installation in North Miami energizes in 4–8 weeks from site survey. DC fast installs run 4–9 months because of utility service upgrades, transformer lead times and switchgear.
How long does an EV charger in North Miami take to become profitable?
Payback in North Miami depends on utilization, electricity tariffs (especially demand charges) and incentives captured. Well-sited Level 2 stations typically reach payback in 3–5 years; DC fast sites with strong throughput in 3–6 years.