Install EV Chargers in Lake City, Florida

Install EV chargers or analyze a site in Lake City, Florida. 19 existing public charging locations (10 DC fast, 9 Level 2). Free 0–100 profitability score on any Lake City address from EV Data Map by Charge Rigs.

Lake City, Florida is served by 19 public electric vehicle charging locations operating 61 individual chargers — an average of 3.2 chargers per site. Of those locations, 10 (53%) offer DC fast charging suitable for road-trip stops and short-dwell sessions, while 9 (47%) provide Level 2 charging for longer dwell times such as workplace, retail and overnight parking.

The largest charging network in Lake City is ChargePoint Network with 13 locations, followed by Tesla with 3. Average DC fast power across the city is approximately 136 kW, which puts most fast-charging stalls in the modern 150 kW–350 kW class capable of delivering a meaningful state-of-charge top-up in 15–30 minutes for a typical EV.

EV Data Map is an EVSE and DC Fast Charger location analyzer that scores every potential charging site in the United States from 0 to 100 for DC Fast Charger ROI, combining EV ownership density, daytime population, traffic, demographics, nearby competing chargers, dwell-time characteristics of surrounding land use, and grid capacity. Use the analyzer below to enter any address in Lake City and receive an instant ROI score, demand projection, and recommended charger configuration.

What to know about charging in Lake City

Lake City, Florida's EV charging landscape is characterized by a significant reliance on ChargePoint Network, which commands 68% of the city's 19 public charging locations. This concentration creates an opportunity for new developers to consider competitive positioning, as the overall reliability and pricing for EV drivers heavily depend on a single operator. With 53% of the public sites classified as DC fast chargers and an average output of 136 kW, including several locations boasting 150 kW-class systems, there is a clear demand for high-power options. Furthermore, the presence of DC fast chargers, notably the 350 kW site, highlights an advantageous environment for those utilizing navigation apps to seek out the fastest charging solutions. As the market evolves, pinpointing gaps in this infrastructure will be crucial for attracting EV drivers to new stations.

Lake City charging by the numbers

Locations
19
Chargers
61
DC Fast locations
10
Level 2 locations
9

DC fast share: 53% of locations. Level 2 share: 47%. Average chargers per site: 3.2. Average DC fast power: 136 kW.

Lake City charging — local snapshot

Top operator share
ChargePoint Network runs 68% of public locations across 5 networks.
Average DC fast power
136 kW (fastest stall: 350 kW)
High-power share
50% of DC fast sites are 150 kW-class or higher
Mix
53% DC fast / 47% Level 2 across 19 locations
Estimated DC ports
45 fast-charging ports city-wide

Charging networks in Lake City

The following operators run public charging in Lake City, ranked by number of locations.

Featured charging locations in Lake City

A selection of higher-power public charging locations across Lake City, sorted by power level.

  1. Florida Power & Light - EVolution - FDOT Lake City Park and Ride — Lake City, FL, 32024 (FPLEV · DC Fast · 350 kW)
  2. Sun Stop - Tesla Supercharger — Lake City, FL, 32024 (Tesla · DC Fast · 250 kW)
  3. Comfort Suites Lake City — Lake City, FL, 32055 (Blink Network · DC Fast · 184 kW)
  4. Village Square - Tesla Supercharger — Lake City, FL, 32055 (Tesla · DC Fast · 150 kW)
  5. Busy Bee - Tesla Supercharger — Lake City, FL, 32055 (Tesla · DC Fast · 150 kW)
  6. TRUCK STOP 75 STATION 2 — Lake City, FL, 32024 (ChargePoint Network · DC Fast · 62.5 kW)
  7. TRUCK STOP 75 STATION 1 — Lake City, FL, 32024 (ChargePoint Network · DC Fast · 62.5 kW)
  8. TRUCK STOP 75 STATION 3 — Lake City, FL, 32024 (ChargePoint Network · DC Fast · 62.5 kW)
  9. GM - Lake City GMC — Lake City, FL, 32055 (EV Connect · DC Fast · 50 kW)
  10. TRUCK STOP 75 STATION 4 — Lake City, FL, 32024 (ChargePoint Network · DC Fast · 40 kW)
  11. HOLC CHARGER CHARGER 1 — Lake City, FL, 32055 (ChargePoint Network · Level 2 · 12 kW)
  12. HOLC CHARGER CHARGER 2 — Lake City, FL, 32055 (ChargePoint Network · Level 2 · 12 kW)

Nearby cities with EV charging coverage

Other cities in Florida we cover with full charging data and site profitability scoring — useful for comparing footprints across the state.

How profitability scores work

Every score on EV Data Map blends location demand, competition and operating economics into a single 0–100 number. Demand is modeled from registered EV count, commute and through-traffic patterns, daytime worker population, retail and hospitality footprint, and tourism inflows. Competition uses the count and quality of nearby existing chargers — including DC fast power, network reliability and dwell-fit. Operating economics include estimated electricity tariffs, demand-charge exposure, expected utilization, and capital cost for the recommended hardware mix.

For Lake City specifically, our model accounts for local commute corridors, nearby interstate and US-highway traffic, the existing footprint of 10 DC fast and 9 Level 2 sites, and the typical dwell profile of the surrounding land use. The result is a per-address score plus a recommended configuration — number of stalls, target power level and network — that maximises projected revenue.

Frequently asked questions

How many EV charging stations are in Lake City, Florida?
There are 19 public electric vehicle charging locations in Lake City, Florida, with a combined 61 individual chargers. 10 locations offer DC fast charging and 9 provide Level 2 charging.
What is the largest EV charging network in Lake City?
ChargePoint Network operates the most public charging locations in Lake City with 13 sites, followed by Tesla with 3 sites.
How much does it cost to install an EV charger in Lake City?
Level 2 EV chargers in Lake City typically install for $4,000–$12,000 per port including make-ready. DC fast installs run $80,000–$250,000+ per port depending on power level, utility upgrades and trenching.
What permits and incentives apply to EV chargers in Lake City?
Most Lake City projects need an electrical permit (and a building permit plus utility coordination for DC fast). Sites can typically stack the federal 30C tax credit (up to 30% / $100,000 per commercial charger in eligible census tracts) with Florida state, utility and NEVI-funded programs.
How long does it take to install an EV charger in Lake City?
A typical commercial Level 2 installation in Lake City energizes in 4–8 weeks from site survey. DC fast installs run 4–9 months because of utility service upgrades, transformer lead times and switchgear.
How long does an EV charger in Lake City take to become profitable?
Payback in Lake City depends on utilization, electricity tariffs (especially demand charges) and incentives captured. Well-sited Level 2 stations typically reach payback in 3–5 years; DC fast sites with strong throughput in 3–6 years.

Related coverage