Install EV Chargers in Miramar, Florida

Install EV chargers or analyze a site in Miramar, Florida. 12 existing public charging locations (1 DC fast, 11 Level 2). Free 0–100 profitability score on any Miramar address from EV Data Map by Charge Rigs.

Miramar, Florida is served by 12 public electric vehicle charging locations operating 43 individual chargers — an average of 3.6 chargers per site. Of those locations, 1 (8%) offer DC fast charging suitable for road-trip stops and short-dwell sessions, while 11 (92%) provide Level 2 charging for longer dwell times such as workplace, retail and overnight parking.

The largest charging network in Miramar is ChargePoint Network with 7 locations, followed by Blink Network with 2. Average DC fast power across the city is approximately 250 kW, which puts most fast-charging stalls in the modern 150 kW–350 kW class capable of delivering a meaningful state-of-charge top-up in 15–30 minutes for a typical EV.

EV Data Map is an EVSE and DC Fast Charger location analyzer that scores every potential charging site in the United States from 0 to 100 for DC Fast Charger ROI, combining EV ownership density, daytime population, traffic, demographics, nearby competing chargers, dwell-time characteristics of surrounding land use, and grid capacity. Use the analyzer below to enter any address in Miramar and receive an instant ROI score, demand projection, and recommended charger configuration.

What to know about charging in Miramar

Miramar boasts a competitive public charging landscape, highlighting a distinct blend of versatility and power for EV drivers. With 12 charging locations, including one ultra-fast DC fast charger averaging 250 kW, the city's infrastructure meets a diverse range of needs. The presence of five distinct charging networks, led by ChargePoint Network at 58% of sites, encourages competitive pricing and uptime. This multi-operator environment allows drivers to choose based on power and amenities rather than loyalty to a single brand. Notably, 100% of DC fast sites are 150 kW-class or higher, making Miramar a valuable destination for those needing quick, high-capacity charging solutions.

Miramar charging by the numbers

Locations
12
Chargers
43
DC Fast locations
1
Level 2 locations
11

DC fast share: 8% of locations. Level 2 share: 92%. Average chargers per site: 3.6. Average DC fast power: 250 kW.

Miramar charging — local snapshot

Top operator share
ChargePoint Network runs 58% of public locations across 5 networks.
Average DC fast power
250 kW (fastest stall: 250 kW)
High-power share
100% of DC fast sites are 150 kW-class or higher
Mix
8% DC fast / 92% Level 2 across 12 locations
Estimated DC ports
16 fast-charging ports city-wide

Charging networks in Miramar

The following operators run public charging in Miramar, ranked by number of locations.

Featured charging locations in Miramar

A selection of higher-power public charging locations across Miramar, sorted by power level.

  1. Miramar Square - Tesla Supercharger — Miramar, FL, 33025 (Tesla · DC Fast · 250 kW)
  2. Avalon Miramar Park Place — Miramar, FL, 33025 (LOOP · Level 2 · 7.7 kW)
  3. Mobil — Miramar, FL, 33027 (Non-Networked · Level 2 · 7.2 kW)
  4. United Data Technologies — Miramar, FL, 33027 (Blink Network · Level 2 · 6.6 kW)
  5. FPL EVOLUTION MIRAMAR 1 — Miramar, FL, 33023 (ChargePoint Network · Level 2 · 6.5 kW)
  6. FPL EVOLUTION MIRAMAR 4 — Miramar, FL, 33027 (ChargePoint Network · Level 2 · 6.5 kW)
  7. FPL EVOLUTION MIRAMAR 5 — Miramar, FL, 33025 (ChargePoint Network · Level 2 · 6.5 kW)
  8. FPL EVOLUTION MIRAMAR 2 — Miramar, FL, 33027 (ChargePoint Network · Level 2 · 6.5 kW)
  9. THEGROVE THEGROVE — Miramar, FL, 33025 (ChargePoint Network · Level 2 · 6.5 kW)
  10. FPL EVOLUTION MIRAMAR 3 — Miramar, FL, 33023 (ChargePoint Network · Level 2 · 6.5 kW)
  11. FPL EVOLUTION MIRAMAR 6 — Miramar, FL, 33025 (ChargePoint Network · Level 2 · 6.5 kW)
  12. Legacy Lake Vista — Miramar, FL, 33025 (Blink Network · Level 2 · 6.2 kW)

Nearby cities with EV charging coverage

Other cities in Florida we cover with full charging data and site profitability scoring — useful for comparing footprints across the state.

How profitability scores work

Every score on EV Data Map blends location demand, competition and operating economics into a single 0–100 number. Demand is modeled from registered EV count, commute and through-traffic patterns, daytime worker population, retail and hospitality footprint, and tourism inflows. Competition uses the count and quality of nearby existing chargers — including DC fast power, network reliability and dwell-fit. Operating economics include estimated electricity tariffs, demand-charge exposure, expected utilization, and capital cost for the recommended hardware mix.

For Miramar specifically, our model accounts for local commute corridors, nearby interstate and US-highway traffic, the existing footprint of 1 DC fast and 11 Level 2 sites, and the typical dwell profile of the surrounding land use. The result is a per-address score plus a recommended configuration — number of stalls, target power level and network — that maximises projected revenue.

Frequently asked questions

How many EV charging stations are in Miramar, Florida?
There are 12 public electric vehicle charging locations in Miramar, Florida, with a combined 43 individual chargers. 1 locations offer DC fast charging and 11 provide Level 2 charging.
What is the largest EV charging network in Miramar?
ChargePoint Network operates the most public charging locations in Miramar with 7 sites, followed by Blink Network with 2 sites.
How much does it cost to install an EV charger in Miramar?
Level 2 EV chargers in Miramar typically install for $4,000–$12,000 per port including make-ready. DC fast installs run $80,000–$250,000+ per port depending on power level, utility upgrades and trenching.
What permits and incentives apply to EV chargers in Miramar?
Most Miramar projects need an electrical permit (and a building permit plus utility coordination for DC fast). Sites can typically stack the federal 30C tax credit (up to 30% / $100,000 per commercial charger in eligible census tracts) with Florida state, utility and NEVI-funded programs.
How long does it take to install an EV charger in Miramar?
A typical commercial Level 2 installation in Miramar energizes in 4–8 weeks from site survey. DC fast installs run 4–9 months because of utility service upgrades, transformer lead times and switchgear.
How long does an EV charger in Miramar take to become profitable?
Payback in Miramar depends on utilization, electricity tariffs (especially demand charges) and incentives captured. Well-sited Level 2 stations typically reach payback in 3–5 years; DC fast sites with strong throughput in 3–6 years.

Related coverage