Install EV Chargers in Davie, Florida

Install EV chargers or analyze a site in Davie, Florida. 36 existing public charging locations (5 DC fast, 31 Level 2). Free 0–100 profitability score on any Davie address from EV Data Map by Charge Rigs.

Davie, Florida is served by 36 public electric vehicle charging locations operating 109 individual chargers — an average of 3.0 chargers per site. Of those locations, 5 (14%) offer DC fast charging suitable for road-trip stops and short-dwell sessions, while 31 (86%) provide Level 2 charging for longer dwell times such as workplace, retail and overnight parking.

The largest charging network in Davie is ChargePoint Network with 20 locations, followed by Blink Network with 5. Average DC fast power across the city is approximately 229 kW, which puts most fast-charging stalls in the modern 150 kW–350 kW class capable of delivering a meaningful state-of-charge top-up in 15–30 minutes for a typical EV.

EV Data Map is an EVSE and DC Fast Charger location analyzer that scores every potential charging site in the United States from 0 to 100 for DC Fast Charger ROI, combining EV ownership density, daytime population, traffic, demographics, nearby competing chargers, dwell-time characteristics of surrounding land use, and grid capacity. Use the analyzer below to enter any address in Davie and receive an instant ROI score, demand projection, and recommended charger configuration.

What to know about charging in Davie

Davie's public charging landscape stands out with its robust diversity and high-performance offerings, featuring 36 locations managed by 10 different operators. The presence of ChargePoint Network at 56% of sites contributes to a competitive environment that influences both pricing and uptime. Notably, the city's 5 DC fast chargers average an impressive 229 kW, with each site exceeding 150 kW, ensuring ultra-fast charging options for drivers. This unique configuration encourages EV users to choose stations based on power and amenities rather than brand loyalty. Coupled with a majority of Level 2 chargers for longer stays, Davie provides an appealing charging ecosystem for residents and travelers, highlighting the potential for strategic infrastructure development.

Davie charging by the numbers

Locations
36
Chargers
109
DC Fast locations
5
Level 2 locations
31

DC fast share: 14% of locations. Level 2 share: 86%. Average chargers per site: 3.0. Average DC fast power: 229 kW.

Davie charging — local snapshot

Top operator share
ChargePoint Network runs 56% of public locations across 10 networks.
Average DC fast power
229 kW (fastest stall: 325 kW)
High-power share
100% of DC fast sites are 150 kW-class or higher
Mix
14% DC fast / 86% Level 2 across 36 locations
Estimated DC ports
31 fast-charging ports city-wide

Charging networks in Davie

The following operators run public charging in Davie, ranked by number of locations.

Featured charging locations in Davie

A selection of higher-power public charging locations across Davie, sorted by power level.

  1. Wawa - Tesla Supercharger — Davie, FL, 33024 (Tesla · DC Fast · 325 kW)
  2. Tower Shops - Tesla Supercharger — Davie, FL, 33324 (Tesla · DC Fast · 250 kW)
  3. Dunkin' — Davie, FL, 33324 (FPLEV · DC Fast · 240 kW)
  4. 7Charge - Davie 32619 — Davie, FL, 33331 (7CHARGE · DC Fast · 180 kW)
  5. Target T2022 (Davie, FL) — Davie, FL, 33328 (Electrify America · DC Fast · 150 kW)
  6. University Dodge Ram — Davie, FL, 33328 (CHARGESMART_EV · Level 2 · 19 kW)
  7. University Mitsubishi — Davie, FL, 33328 (CHARGESMART_EV · Level 2 · 19 kW)
  8. Advanced Electrical Solution Inc. — Davie, FL, 33314 (CHARGELAB · Level 2 · 11 kW)
  9. 4th Ave Land Holdings — Davie, FL, 33314 (Blink Network · Level 2 · 10.8 kW)
  10. ArchCo Residential LLC — Davie, FL, 33314 (Blink Network · Level 2 · 10.6 kW)
  11. New River Cove — Davie, FL, 33312 (LOOP · Level 2 · 7.7 kW)
  12. The Palms — Davie, FL, 33324 (LOOP · Level 2 · 7.7 kW)

Nearby cities with EV charging coverage

Other cities in Florida we cover with full charging data and site profitability scoring — useful for comparing footprints across the state.

How profitability scores work

Every score on EV Data Map blends location demand, competition and operating economics into a single 0–100 number. Demand is modeled from registered EV count, commute and through-traffic patterns, daytime worker population, retail and hospitality footprint, and tourism inflows. Competition uses the count and quality of nearby existing chargers — including DC fast power, network reliability and dwell-fit. Operating economics include estimated electricity tariffs, demand-charge exposure, expected utilization, and capital cost for the recommended hardware mix.

For Davie specifically, our model accounts for local commute corridors, nearby interstate and US-highway traffic, the existing footprint of 5 DC fast and 31 Level 2 sites, and the typical dwell profile of the surrounding land use. The result is a per-address score plus a recommended configuration — number of stalls, target power level and network — that maximises projected revenue.

Frequently asked questions

How many EV charging stations are in Davie, Florida?
There are 36 public electric vehicle charging locations in Davie, Florida, with a combined 109 individual chargers. 5 locations offer DC fast charging and 31 provide Level 2 charging.
What is the largest EV charging network in Davie?
ChargePoint Network operates the most public charging locations in Davie with 20 sites, followed by Blink Network with 5 sites.
How much does it cost to install an EV charger in Davie?
Level 2 EV chargers in Davie typically install for $4,000–$12,000 per port including make-ready. DC fast installs run $80,000–$250,000+ per port depending on power level, utility upgrades and trenching.
What permits and incentives apply to EV chargers in Davie?
Most Davie projects need an electrical permit (and a building permit plus utility coordination for DC fast). Sites can typically stack the federal 30C tax credit (up to 30% / $100,000 per commercial charger in eligible census tracts) with Florida state, utility and NEVI-funded programs.
How long does it take to install an EV charger in Davie?
A typical commercial Level 2 installation in Davie energizes in 4–8 weeks from site survey. DC fast installs run 4–9 months because of utility service upgrades, transformer lead times and switchgear.
How long does an EV charger in Davie take to become profitable?
Payback in Davie depends on utilization, electricity tariffs (especially demand charges) and incentives captured. Well-sited Level 2 stations typically reach payback in 3–5 years; DC fast sites with strong throughput in 3–6 years.

Related coverage