Install EV Chargers in Palm Beach Gardens, Florida
Install EV chargers or analyze a site in Palm Beach Gardens, Florida. 27 existing public charging locations (7 DC fast, 20 Level 2). Free 0–100 profitability score on any Palm Beach Gardens address from EV Data Map by Charge Rigs.
Palm Beach Gardens, Florida is served by 27 public electric vehicle charging locations operating 96 individual chargers — an average of 3.6 chargers per site. Of those locations, 7 (26%) offer DC fast charging suitable for road-trip stops and short-dwell sessions, while 20 (74%) provide Level 2 charging for longer dwell times such as workplace, retail and overnight parking.
The largest charging network in Palm Beach Gardens is ChargePoint Network with 16 locations, followed by Tesla Destination with 4. Average DC fast power across the city is approximately 201 kW, which puts most fast-charging stalls in the modern 150 kW–350 kW class capable of delivering a meaningful state-of-charge top-up in 15–30 minutes for a typical EV.
EV Data Map is an EVSE and DC Fast Charger location analyzer that scores every potential charging site in the United States from 0 to 100 for DC Fast Charger ROI, combining EV ownership density, daytime population, traffic, demographics, nearby competing chargers, dwell-time characteristics of surrounding land use, and grid capacity. Use the analyzer below to enter any address in Palm Beach Gardens and receive an instant ROI score, demand projection, and recommended charger configuration.
What to know about charging in Palm Beach Gardens
Palm Beach Gardens boasts a competitive and diverse EV charging landscape with 27 public locations serviced by seven distinct networks, which encourages drivers to choose based on power and amenities rather than relying on a single provider. Notably, the city features an impressive average DC fast charging power of 201 kW, with 71% of these stations offering 150 kW or more, positioning them favorably in terms of speed and efficiency. This ultra-fast charging capability, highlighted by a peak of 350 kW at the fastest site, meets the demands of EV drivers looking for quick refueling options. With 26% of charging locations dedicated to DC fast options and a strategic mix of Level 2 stations for longer dwell times, the local infrastructure effectively supports both fast and convenient charging solutions for the growing EV community.
Palm Beach Gardens charging by the numbers
Locations
27
Chargers
96
DC Fast locations
7
Level 2 locations
20
DC fast share: 26% of locations. Level 2 share: 74%. Average chargers per site: 3.6. Average DC fast power: 201 kW.
Palm Beach Gardens charging — local snapshot
Top operator share
ChargePoint Network runs 59% of public locations across 7 networks.
Average DC fast power
201 kW (fastest stall: 350 kW)
High-power share
71% of DC fast sites are 150 kW-class or higher
Mix
26% DC fast / 74% Level 2 across 27 locations
Estimated DC ports
32 fast-charging ports city-wide
Charging networks in Palm Beach Gardens
The following operators run public charging in Palm Beach Gardens, ranked by number of locations.
ChargePoint Network — 16 locations
Tesla Destination — 4 locations
AMPUP — 2 locations
Blink Network — 2 locations
7CHARGE — 1 location
Electrify America — 1 location
Tesla — 1 location
Featured charging locations in Palm Beach Gardens
A selection of higher-power public charging locations across Palm Beach Gardens, sorted by power level.
Downtown at the Gardens (Palm Beach Gardens, FL) — Palm Beach Gardens, FL, 33410 (Electrify America · DC Fast · 350 kW)
FPL EVOLUTION MIDTOWN PGA DC2 — Palm Beach Gardens, FL, 33418 (ChargePoint Network · DC Fast · 250 kW)
FPL EVOLUTION MIDTOWN PGA DC1 — Palm Beach Gardens, FL, 33418 (ChargePoint Network · DC Fast · 250 kW)
DoubleTree by Hilton - Tesla Supercharger — Palm Beach Gardens, FL, 33410 (Tesla · DC Fast · 250 kW)
7Charge - Palm Beach Gardens 41621A — Palm Beach Gardens, FL, 33403 (7CHARGE · DC Fast · 180 kW)
FPL EVOLUTION MIDTOWN PGA DC4 — Palm Beach Gardens, FL, 33418 (ChargePoint Network · DC Fast · 62.5 kW)
FPL EVOLUTION MIDTOWN PGA DC3 — Palm Beach Gardens, FL, 33418 (ChargePoint Network · DC Fast · 62 kW)
City Hall — Palm Beach Gardens, FL, 33410 (Blink Network · Level 2 · 16.6 kW)
Every score on EV Data Map blends location demand, competition and operating economics into a single 0–100 number. Demand is modeled from registered EV count, commute and through-traffic patterns, daytime worker population, retail and hospitality footprint, and tourism inflows. Competition uses the count and quality of nearby existing chargers — including DC fast power, network reliability and dwell-fit. Operating economics include estimated electricity tariffs, demand-charge exposure, expected utilization, and capital cost for the recommended hardware mix.
For Palm Beach Gardens specifically, our model accounts for local commute corridors, nearby interstate and US-highway traffic, the existing footprint of 7 DC fast and 20 Level 2 sites, and the typical dwell profile of the surrounding land use. The result is a per-address score plus a recommended configuration — number of stalls, target power level and network — that maximises projected revenue.
Frequently asked questions
How many EV charging stations are in Palm Beach Gardens, Florida?
There are 27 public electric vehicle charging locations in Palm Beach Gardens, Florida, with a combined 96 individual chargers. 7 locations offer DC fast charging and 20 provide Level 2 charging.
What is the largest EV charging network in Palm Beach Gardens?
ChargePoint Network operates the most public charging locations in Palm Beach Gardens with 16 sites, followed by Tesla Destination with 4 sites.
How much does it cost to install an EV charger in Palm Beach Gardens?
Level 2 EV chargers in Palm Beach Gardens typically install for $4,000–$12,000 per port including make-ready. DC fast installs run $80,000–$250,000+ per port depending on power level, utility upgrades and trenching.
What permits and incentives apply to EV chargers in Palm Beach Gardens?
Most Palm Beach Gardens projects need an electrical permit (and a building permit plus utility coordination for DC fast). Sites can typically stack the federal 30C tax credit (up to 30% / $100,000 per commercial charger in eligible census tracts) with Florida state, utility and NEVI-funded programs.
How long does it take to install an EV charger in Palm Beach Gardens?
A typical commercial Level 2 installation in Palm Beach Gardens energizes in 4–8 weeks from site survey. DC fast installs run 4–9 months because of utility service upgrades, transformer lead times and switchgear.
How long does an EV charger in Palm Beach Gardens take to become profitable?
Payback in Palm Beach Gardens depends on utilization, electricity tariffs (especially demand charges) and incentives captured. Well-sited Level 2 stations typically reach payback in 3–5 years; DC fast sites with strong throughput in 3–6 years.