Install EV chargers or analyze a site in Idaho Falls, Idaho. 15 existing public charging locations (5 DC fast, 10 Level 2). Free 0–100 profitability score on any Idaho Falls address from EV Data Map by Charge Rigs.
Idaho Falls, Idaho is served by 15 public electric vehicle charging locations operating 42 individual chargers — an average of 2.8 chargers per site. Of those locations, 5 (33%) offer DC fast charging suitable for road-trip stops and short-dwell sessions, while 10 (67%) provide Level 2 charging for longer dwell times such as workplace, retail and overnight parking.
The largest charging network in Idaho Falls is Blink Network with 7 locations, followed by Non-Networked with 2. Average DC fast power across the city is approximately 158 kW, which puts most fast-charging stalls in the modern 150 kW–350 kW class capable of delivering a meaningful state-of-charge top-up in 15–30 minutes for a typical EV.
EV Data Map is an EVSE and DC Fast Charger location analyzer that scores every potential charging site in the United States from 0 to 100 for DC Fast Charger ROI, combining EV ownership density, daytime population, traffic, demographics, nearby competing chargers, dwell-time characteristics of surrounding land use, and grid capacity. Use the analyzer below to enter any address in Idaho Falls and receive an instant ROI score, demand projection, and recommended charger configuration.
What to know about charging in Idaho Falls
Idaho Falls showcases a dynamic and competitive EV charging landscape, with 15 public charging locations featuring a strong 33% DC fast charging share. Notably, half of the fast charging stations deliver 150 kW or more, including an impressive stall that peaks at 350 kW. This high-power capability supports a diverse operator base, with Blink Network commanding 47% of the sites, enabling drivers to choose based on power options and amenities rather than being tethered to a single brand. As a result, charging decisions are influenced by access to fast, modern charging infrastructure, providing a valuable resource for EV users navigating the city and its surrounding areas.
Idaho Falls charging by the numbers
Locations
15
Chargers
42
DC Fast locations
5
Level 2 locations
10
DC fast share: 33% of locations. Level 2 share: 67%. Average chargers per site: 2.8. Average DC fast power: 158 kW.
Idaho Falls charging — local snapshot
Top operator share
Blink Network runs 47% of public locations across 7 networks.
Average DC fast power
158 kW (fastest stall: 350 kW)
High-power share
40% of DC fast sites are 150 kW-class or higher
Mix
33% DC fast / 67% Level 2 across 15 locations
Estimated DC ports
17 fast-charging ports city-wide
Charging networks in Idaho Falls
The following operators run public charging in Idaho Falls, ranked by number of locations.
Blink Network — 7 locations
Non-Networked — 2 locations
ChargePoint Network — 2 locations
IN_CHARGE — 1 location
LOOP — 1 location
Tesla — 1 location
Electrify America — 1 location
Featured charging locations in Idaho Falls
A selection of higher-power public charging locations across Idaho Falls, sorted by power level.
Walmart 5494 (Idaho Falls, ID) — Idaho Falls, ID, 83402 (Electrify America · DC Fast · 350 kW)
Snake River Landing - Tesla Supercharger — Idaho Falls, ID, 83402 (Tesla · DC Fast · 150 kW)
L330 PL-IF-PUBLIC 02 — Idaho Falls, ID, 83402 (ChargePoint Network · DC Fast · 120 kW)
L330 PL-IF-PUBLIC01 — Idaho Falls, ID, 83402 (ChargePoint Network · DC Fast · 120 kW)
Ron Sayer Nissan — Idaho Falls, ID, 83401 (IN_CHARGE · DC Fast · 50 kW)
La Quinta Inn and Suites Idaho Falls — Idaho Falls, ID, 83406 (Blink Network · Level 2 · 10.4 kW)
Every score on EV Data Map blends location demand, competition and operating economics into a single 0–100 number. Demand is modeled from registered EV count, commute and through-traffic patterns, daytime worker population, retail and hospitality footprint, and tourism inflows. Competition uses the count and quality of nearby existing chargers — including DC fast power, network reliability and dwell-fit. Operating economics include estimated electricity tariffs, demand-charge exposure, expected utilization, and capital cost for the recommended hardware mix.
For Idaho Falls specifically, our model accounts for local commute corridors, nearby interstate and US-highway traffic, the existing footprint of 5 DC fast and 10 Level 2 sites, and the typical dwell profile of the surrounding land use. The result is a per-address score plus a recommended configuration — number of stalls, target power level and network — that maximises projected revenue.
Frequently asked questions
How many EV charging stations are in Idaho Falls, Idaho?
There are 15 public electric vehicle charging locations in Idaho Falls, Idaho, with a combined 42 individual chargers. 5 locations offer DC fast charging and 10 provide Level 2 charging.
What is the largest EV charging network in Idaho Falls?
Blink Network operates the most public charging locations in Idaho Falls with 7 sites, followed by Non-Networked with 2 sites.
How much does it cost to install an EV charger in Idaho Falls?
Level 2 EV chargers in Idaho Falls typically install for $4,000–$12,000 per port including make-ready. DC fast installs run $80,000–$250,000+ per port depending on power level, utility upgrades and trenching.
What permits and incentives apply to EV chargers in Idaho Falls?
Most Idaho Falls projects need an electrical permit (and a building permit plus utility coordination for DC fast). Sites can typically stack the federal 30C tax credit (up to 30% / $100,000 per commercial charger in eligible census tracts) with Idaho state, utility and NEVI-funded programs.
How long does it take to install an EV charger in Idaho Falls?
A typical commercial Level 2 installation in Idaho Falls energizes in 4–8 weeks from site survey. DC fast installs run 4–9 months because of utility service upgrades, transformer lead times and switchgear.
How long does an EV charger in Idaho Falls take to become profitable?
Payback in Idaho Falls depends on utilization, electricity tariffs (especially demand charges) and incentives captured. Well-sited Level 2 stations typically reach payback in 3–5 years; DC fast sites with strong throughput in 3–6 years.