Install EV Chargers in Meridian, Idaho

Install EV chargers or analyze a site in Meridian, Idaho. 13 existing public charging locations (2 DC fast, 11 Level 2). Free 0–100 profitability score on any Meridian address from EV Data Map by Charge Rigs.

Meridian, Idaho is served by 13 public electric vehicle charging locations operating 58 individual chargers — an average of 4.5 chargers per site. Of those locations, 2 (15%) offer DC fast charging suitable for road-trip stops and short-dwell sessions, while 11 (85%) provide Level 2 charging for longer dwell times such as workplace, retail and overnight parking.

The largest charging network in Meridian is Blink Network with 7 locations, followed by ChargePoint Network with 2. Average DC fast power across the city is approximately 220 kW, which puts most fast-charging stalls in the modern 150 kW–350 kW class capable of delivering a meaningful state-of-charge top-up in 15–30 minutes for a typical EV.

EV Data Map is an EVSE and DC Fast Charger location analyzer that scores every potential charging site in the United States from 0 to 100 for DC Fast Charger ROI, combining EV ownership density, daytime population, traffic, demographics, nearby competing chargers, dwell-time characteristics of surrounding land use, and grid capacity. Use the analyzer below to enter any address in Meridian and receive an instant ROI score, demand projection, and recommended charger configuration.

What to know about charging in Meridian

Meridian boasts a vibrant public charging ecosystem with 13 locations operated by six distinct networks, largely led by Blink Network, which accounts for over half of the sites. This variety fosters competitive pricing and reliable service, encouraging drivers to choose chargers based on power and amenities rather than brand loyalty. The two DC fast charging stations average an impressive 220 kW, with the fastest option reaching 320 kW, positioning the city’s infrastructure at the forefront of fast charging capabilities in the region. The fact that 50% of DC fast sites feature 150 kW-class or higher hardware signifies a robust offering for drivers seeking quick charging solutions, enhancing Meridian's appeal in the broader Idaho market.

Meridian charging by the numbers

Locations
13
Chargers
58
DC Fast locations
2
Level 2 locations
11

DC fast share: 15% of locations. Level 2 share: 85%. Average chargers per site: 4.5. Average DC fast power: 220 kW.

Meridian charging — local snapshot

Top operator share
Blink Network runs 54% of public locations across 6 networks.
Average DC fast power
220 kW (fastest stall: 320 kW)
High-power share
50% of DC fast sites are 150 kW-class or higher
Mix
15% DC fast / 85% Level 2 across 13 locations
Estimated DC ports
14 fast-charging ports city-wide

Charging networks in Meridian

The following operators run public charging in Meridian, ranked by number of locations.

Featured charging locations in Meridian

A selection of higher-power public charging locations across Meridian, sorted by power level.

  1. Jackson's Food Store — Meridian, ID, 83642 (ONPOINT_EV_SOLUTIONS · DC Fast · 320 kW)
  2. Kendall Meridian Ford — Meridian, ID, 83642 (Blink Network · DC Fast · 120 kW)
  3. HYATT PLACE — Meridian, ID, 83642 (Blink Network · Level 2 · 16.6 kW)
  4. Candlewood Suites Boise Meridian — Meridian, ID, 83642 (ENVIROSPARK · Level 2 · 11.1 kW)
  5. Kendall Ford Commercial Fleet Center - Meridian — Meridian, ID, 83642 (Blink Network · Level 2 · 10.8 kW)
  6. Main Street Burger — Meridian, ID, 83642 (Blink Network · Level 2 · 10.4 kW)
  7. Holiday Inn — Meridian, ID, 83642 (Blink Network · Level 2 · 10.4 kW)
  8. Kendall Ford — Meridian, ID, 83642 (Non-Networked · Level 2 · 7.2 kW)
  9. Candlewood Suites Meridian - Tesla Destination — Meridian, ID, 83642 (Tesla Destination · Level 2 · 7.2 kW)
  10. HDHD CT4020 LEVEL 2 — Meridian, ID, 83642 (ChargePoint Network · Level 2 · 6.5 kW)
  11. BVABC OFFICE 3 STATION 1 — Meridian, ID, 83642 (ChargePoint Network · Level 2 · 6.5 kW)
  12. Ahlquist — Meridian, ID, 83642 (Blink Network · Level 2 · 6.2 kW)

Nearby cities with EV charging coverage

Other cities in Idaho we cover with full charging data and site profitability scoring — useful for comparing footprints across the state.

How profitability scores work

Every score on EV Data Map blends location demand, competition and operating economics into a single 0–100 number. Demand is modeled from registered EV count, commute and through-traffic patterns, daytime worker population, retail and hospitality footprint, and tourism inflows. Competition uses the count and quality of nearby existing chargers — including DC fast power, network reliability and dwell-fit. Operating economics include estimated electricity tariffs, demand-charge exposure, expected utilization, and capital cost for the recommended hardware mix.

For Meridian specifically, our model accounts for local commute corridors, nearby interstate and US-highway traffic, the existing footprint of 2 DC fast and 11 Level 2 sites, and the typical dwell profile of the surrounding land use. The result is a per-address score plus a recommended configuration — number of stalls, target power level and network — that maximises projected revenue.

Frequently asked questions

How many EV charging stations are in Meridian, Idaho?
There are 13 public electric vehicle charging locations in Meridian, Idaho, with a combined 58 individual chargers. 2 locations offer DC fast charging and 11 provide Level 2 charging.
What is the largest EV charging network in Meridian?
Blink Network operates the most public charging locations in Meridian with 7 sites, followed by ChargePoint Network with 2 sites.
How much does it cost to install an EV charger in Meridian?
Level 2 EV chargers in Meridian typically install for $4,000–$12,000 per port including make-ready. DC fast installs run $80,000–$250,000+ per port depending on power level, utility upgrades and trenching.
What permits and incentives apply to EV chargers in Meridian?
Most Meridian projects need an electrical permit (and a building permit plus utility coordination for DC fast). Sites can typically stack the federal 30C tax credit (up to 30% / $100,000 per commercial charger in eligible census tracts) with Idaho state, utility and NEVI-funded programs.
How long does it take to install an EV charger in Meridian?
A typical commercial Level 2 installation in Meridian energizes in 4–8 weeks from site survey. DC fast installs run 4–9 months because of utility service upgrades, transformer lead times and switchgear.
How long does an EV charger in Meridian take to become profitable?
Payback in Meridian depends on utilization, electricity tariffs (especially demand charges) and incentives captured. Well-sited Level 2 stations typically reach payback in 3–5 years; DC fast sites with strong throughput in 3–6 years.