Install EV Chargers in Pocatello, Idaho

Install EV chargers or analyze a site in Pocatello, Idaho. 10 existing public charging locations (6 DC fast, 4 Level 2). Free 0–100 profitability score on any Pocatello address from EV Data Map by Charge Rigs.

Pocatello, Idaho is served by 10 public electric vehicle charging locations operating 24 individual chargers — an average of 2.4 chargers per site. Of those locations, 6 (60%) offer DC fast charging suitable for road-trip stops and short-dwell sessions, while 4 (40%) provide Level 2 charging for longer dwell times such as workplace, retail and overnight parking.

The largest charging network in Pocatello is Blink Network with 3 locations, followed by Non-Networked with 3. Average DC fast power across the city is approximately 94 kW, which puts most fast-charging stalls in the modern 150 kW–350 kW class capable of delivering a meaningful state-of-charge top-up in 15–30 minutes for a typical EV.

EV Data Map is an EVSE and DC Fast Charger location analyzer that scores every potential charging site in the United States from 0 to 100 for DC Fast Charger ROI, combining EV ownership density, daytime population, traffic, demographics, nearby competing chargers, dwell-time characteristics of surrounding land use, and grid capacity. Use the analyzer below to enter any address in Pocatello and receive an instant ROI score, demand projection, and recommended charger configuration.

What to know about charging in Pocatello

Pocatello offers a unique and competitive landscape for EV charging, featuring a blend of six distinct networks across ten publicly accessible stations, with Blink Network leading at 30%. The city’s DC fast charging locations average an impressive 94 kW, with a notable 33% classified at 150 kW or higher, catering to drivers who prioritize speed and efficiency. This diverse operator mix fosters competitive pricing and uptime while enabling users to assess charging options based on power and amenities rather than brand loyalty. As infrastructure evolves, the introduction of higher-capacity stations will enhance the local charging experience and meet the growing demands of EV drivers, positioning Pocatello as an emerging hub in the region.

Pocatello charging by the numbers

Locations
10
Chargers
24
DC Fast locations
6
Level 2 locations
4

DC fast share: 60% of locations. Level 2 share: 40%. Average chargers per site: 2.4. Average DC fast power: 94 kW.

Pocatello charging — local snapshot

Top operator share
Blink Network runs 30% of public locations across 6 networks.
Average DC fast power
94 kW (fastest stall: 200 kW)
High-power share
33% of DC fast sites are 150 kW-class or higher
Mix
60% DC fast / 40% Level 2 across 10 locations
Estimated DC ports
16 fast-charging ports city-wide

Charging networks in Pocatello

The following operators run public charging in Pocatello, ranked by number of locations.

Featured charging locations in Pocatello

A selection of higher-power public charging locations across Pocatello, sorted by power level.

  1. L099 POCATELLO PL — Pocatello, ID, 83202 (ChargePoint Network · DC Fast · 200 kW)
  2. Grand Idaho Inn & Suites - Tesla Supercharger — Pocatello, ID, 83201 (Tesla · DC Fast · 150 kW)
  3. Cole Chevrolet — Pocatello, ID, 83201 (Non-Networked · DC Fast · 60 kW)
  4. Hirning Buick GMC — Pocatello, ID, 83201 (RED_E · DC Fast · 51 kW)
  5. Cole Nissan Kia — Pocatello, ID, 83202 (IN_CHARGE · DC Fast · 50 kW)
  6. Hirning Buick GMC — Pocatello, ID, 83201 (Non-Networked · DC Fast · 50 kW)
  7. Courtyard — Pocatello, ID, 83201 (Blink Network · Level 2 · 10.4 kW)
  8. Fairfield by Marriott — Pocatello, ID, 83201 (Blink Network · Level 2 · 8.3 kW)
  9. Cole Nissan Kia — Pocatello, ID, 83202 (Non-Networked · Level 2 · 7.2 kW)
  10. Northgate Apartments — Pocatello, ID, 83202 (Blink Network · Level 2 · 6.2 kW)

Nearby cities with EV charging coverage

Other cities in Idaho we cover with full charging data and site profitability scoring — useful for comparing footprints across the state.

How profitability scores work

Every score on EV Data Map blends location demand, competition and operating economics into a single 0–100 number. Demand is modeled from registered EV count, commute and through-traffic patterns, daytime worker population, retail and hospitality footprint, and tourism inflows. Competition uses the count and quality of nearby existing chargers — including DC fast power, network reliability and dwell-fit. Operating economics include estimated electricity tariffs, demand-charge exposure, expected utilization, and capital cost for the recommended hardware mix.

For Pocatello specifically, our model accounts for local commute corridors, nearby interstate and US-highway traffic, the existing footprint of 6 DC fast and 4 Level 2 sites, and the typical dwell profile of the surrounding land use. The result is a per-address score plus a recommended configuration — number of stalls, target power level and network — that maximises projected revenue.

Frequently asked questions

How many EV charging stations are in Pocatello, Idaho?
There are 10 public electric vehicle charging locations in Pocatello, Idaho, with a combined 24 individual chargers. 6 locations offer DC fast charging and 4 provide Level 2 charging.
What is the largest EV charging network in Pocatello?
Blink Network operates the most public charging locations in Pocatello with 3 sites, followed by Non-Networked with 3 sites.
How much does it cost to install an EV charger in Pocatello?
Level 2 EV chargers in Pocatello typically install for $4,000–$12,000 per port including make-ready. DC fast installs run $80,000–$250,000+ per port depending on power level, utility upgrades and trenching.
What permits and incentives apply to EV chargers in Pocatello?
Most Pocatello projects need an electrical permit (and a building permit plus utility coordination for DC fast). Sites can typically stack the federal 30C tax credit (up to 30% / $100,000 per commercial charger in eligible census tracts) with Idaho state, utility and NEVI-funded programs.
How long does it take to install an EV charger in Pocatello?
A typical commercial Level 2 installation in Pocatello energizes in 4–8 weeks from site survey. DC fast installs run 4–9 months because of utility service upgrades, transformer lead times and switchgear.
How long does an EV charger in Pocatello take to become profitable?
Payback in Pocatello depends on utilization, electricity tariffs (especially demand charges) and incentives captured. Well-sited Level 2 stations typically reach payback in 3–5 years; DC fast sites with strong throughput in 3–6 years.