Install EV Chargers in Bolingbrook, Illinois

Install EV chargers or analyze a site in Bolingbrook, Illinois. 14 existing public charging locations (7 DC fast, 7 Level 2). Free 0–100 profitability score on any Bolingbrook address from EV Data Map by Charge Rigs.

Bolingbrook, Illinois is served by 14 public electric vehicle charging locations operating 73 individual chargers — an average of 5.2 chargers per site. Of those locations, 7 (50%) offer DC fast charging suitable for road-trip stops and short-dwell sessions, while 7 (50%) provide Level 2 charging for longer dwell times such as workplace, retail and overnight parking.

The largest charging network in Bolingbrook is ChargePoint Network with 5 locations, followed by Tesla with 2. Average DC fast power across the city is approximately 217 kW, which puts most fast-charging stalls in the modern 150 kW–350 kW class capable of delivering a meaningful state-of-charge top-up in 15–30 minutes for a typical EV.

EV Data Map is an EVSE and DC Fast Charger location analyzer that scores every potential charging site in the United States from 0 to 100 for DC Fast Charger ROI, combining EV ownership density, daytime population, traffic, demographics, nearby competing chargers, dwell-time characteristics of surrounding land use, and grid capacity. Use the analyzer below to enter any address in Bolingbrook and receive an instant ROI score, demand projection, and recommended charger configuration.

What to know about charging in Bolingbrook

Bolingbrook features a competitive public EV charging landscape with 14 locations from 9 distinct operators, including a strong presence of ChargePoint Network, which accounts for 36% of sites. The city stands out with 7 DC fast charging stations, averaging 217 kW of power—well above the national average—and offering ultra-fast charging options, including a maximum of 350 kW. With 100% of these fast stations rated at 150 kW or higher, drivers benefit from diverse charging choices that emphasize power and amenities instead of brand allegiance. This strategic mix of 50% DC fast charging locations enhances the city’s appeal to EV users navigating through Bolingbrook and neighboring areas, providing an efficient and varied charging experience that is both accessible and effective.

Bolingbrook charging by the numbers

Locations
14
Chargers
73
DC Fast locations
7
Level 2 locations
7

DC fast share: 50% of locations. Level 2 share: 50%. Average chargers per site: 5.2. Average DC fast power: 217 kW.

Bolingbrook charging — local snapshot

Top operator share
ChargePoint Network runs 36% of public locations across 9 networks.
Average DC fast power
217 kW (fastest stall: 350 kW)
High-power share
100% of DC fast sites are 150 kW-class or higher
Mix
50% DC fast / 50% Level 2 across 14 locations
Estimated DC ports
56 fast-charging ports city-wide

Charging networks in Bolingbrook

The following operators run public charging in Bolingbrook, ranked by number of locations.

Featured charging locations in Bolingbrook

A selection of higher-power public charging locations across Bolingbrook, sorted by power level.

  1. IKEA Store 170 (Bolingbrook, IL) — Bolingbrook, IL, 60440 (Electrify America · DC Fast · 350 kW)
  2. Meijer - Tesla Supercharger — Bolingbrook, IL, 60490 (Tesla · DC Fast · 250 kW)
  3. Meijer - Tesla Supercharger — Bolingbrook, IL, 60440 (Tesla · DC Fast · 250 kW)
  4. Advantage Chevrolet of Bolingbrook — Bolingbrook, IL, 60440 (EV Connect · DC Fast · 180 kW)
  5. 255 N Weber Rd — Bolingbrook, IL, 60490 (SHELL_RECHARGE · DC Fast · 180 kW)
  6. Caseys Bolingbrook — Bolingbrook, IL, 60440 (RED_E · DC Fast · 160 kW)
  7. Thorntons, Webber Rd, Bolingbrook, IL — Bolingbrook, IL, 60490 (BP_PULSE · DC Fast · 150 kW)
  8. Bolingbrook Town Center East — Bolingbrook, IL, 60440 (POWERPORT_EVC · Level 2 · 11.5 kW)
  9. Hilton Garden Inn Bolingbrook - Tesla Destination — Bolingbrook, IL, 60440 (Tesla Destination · Level 2 · 11 kW)
  10. IKEA USA BOLINGBROOK 4 — Bolingbrook, IL, 60440 (ChargePoint Network · Level 2 · 6.5 kW)
  11. BOLINGBROOK STATION#1 — Bolingbrook, IL, 60440 (ChargePoint Network · Level 2 · 6.5 kW)
  12. IKEA USA BOLINGBROOK 3 — Bolingbrook, IL, 60440 (ChargePoint Network · Level 2 · 6.5 kW)

Nearby cities with EV charging coverage

Other cities in Illinois we cover with full charging data and site profitability scoring — useful for comparing footprints across the state.

How profitability scores work

Every score on EV Data Map blends location demand, competition and operating economics into a single 0–100 number. Demand is modeled from registered EV count, commute and through-traffic patterns, daytime worker population, retail and hospitality footprint, and tourism inflows. Competition uses the count and quality of nearby existing chargers — including DC fast power, network reliability and dwell-fit. Operating economics include estimated electricity tariffs, demand-charge exposure, expected utilization, and capital cost for the recommended hardware mix.

For Bolingbrook specifically, our model accounts for local commute corridors, nearby interstate and US-highway traffic, the existing footprint of 7 DC fast and 7 Level 2 sites, and the typical dwell profile of the surrounding land use. The result is a per-address score plus a recommended configuration — number of stalls, target power level and network — that maximises projected revenue.

Frequently asked questions

How many EV charging stations are in Bolingbrook, Illinois?
There are 14 public electric vehicle charging locations in Bolingbrook, Illinois, with a combined 73 individual chargers. 7 locations offer DC fast charging and 7 provide Level 2 charging.
What is the largest EV charging network in Bolingbrook?
ChargePoint Network operates the most public charging locations in Bolingbrook with 5 sites, followed by Tesla with 2 sites.
How much does it cost to install an EV charger in Bolingbrook?
Level 2 EV chargers in Bolingbrook typically install for $4,000–$12,000 per port including make-ready. DC fast installs run $80,000–$250,000+ per port depending on power level, utility upgrades and trenching.
What permits and incentives apply to EV chargers in Bolingbrook?
Most Bolingbrook projects need an electrical permit (and a building permit plus utility coordination for DC fast). Sites can typically stack the federal 30C tax credit (up to 30% / $100,000 per commercial charger in eligible census tracts) with Illinois state, utility and NEVI-funded programs.
How long does it take to install an EV charger in Bolingbrook?
A typical commercial Level 2 installation in Bolingbrook energizes in 4–8 weeks from site survey. DC fast installs run 4–9 months because of utility service upgrades, transformer lead times and switchgear.
How long does an EV charger in Bolingbrook take to become profitable?
Payback in Bolingbrook depends on utilization, electricity tariffs (especially demand charges) and incentives captured. Well-sited Level 2 stations typically reach payback in 3–5 years; DC fast sites with strong throughput in 3–6 years.

Related coverage