Install EV Chargers in North Aurora, Illinois

Install EV chargers or analyze a site in North Aurora, Illinois. 13 existing public charging locations (7 DC fast, 6 Level 2). Free 0–100 profitability score on any North Aurora address from EV Data Map by Charge Rigs.

North Aurora, Illinois is served by 13 public electric vehicle charging locations operating 45 individual chargers — an average of 3.5 chargers per site. Of those locations, 7 (54%) offer DC fast charging suitable for road-trip stops and short-dwell sessions, while 6 (46%) provide Level 2 charging for longer dwell times such as workplace, retail and overnight parking.

The largest charging network in North Aurora is ChargePoint Network with 4 locations, followed by Tesla Destination with 2. Average DC fast power across the city is approximately 91 kW, which puts most fast-charging stalls in the modern 150 kW–350 kW class capable of delivering a meaningful state-of-charge top-up in 15–30 minutes for a typical EV.

EV Data Map is an EVSE and DC Fast Charger location analyzer that scores every potential charging site in the United States from 0 to 100 for DC Fast Charger ROI, combining EV ownership density, daytime population, traffic, demographics, nearby competing chargers, dwell-time characteristics of surrounding land use, and grid capacity. Use the analyzer below to enter any address in North Aurora and receive an instant ROI score, demand projection, and recommended charger configuration.

What to know about charging in North Aurora

North Aurora boasts a competitive public charging landscape, featuring 13 locations operated by eight distinct networks, with ChargePoint Network leading at 31% of the sites. This diverse operator mix contributes to more competitive pricing and uptime, allowing EV drivers to make informed decisions based on charging power and amenities rather than brand loyalty. With over half (54%) of the locations dedicated to DC fast charging, the average output sits at 91 kW, peaking at 180 kW—though nearly a third of these fast chargers fall into the 150 kW-class, which is especially appealing for users prioritizing quicker turnarounds. As new high-capacity hardware enters the market, these factors will notably influence site selection and service optimization in North Aurora’s growing EV ecosystem.

North Aurora charging by the numbers

Locations
13
Chargers
45
DC Fast locations
7
Level 2 locations
6

DC fast share: 54% of locations. Level 2 share: 46%. Average chargers per site: 3.5. Average DC fast power: 91 kW.

North Aurora charging — local snapshot

Top operator share
ChargePoint Network runs 31% of public locations across 8 networks.
Average DC fast power
91 kW (fastest stall: 180 kW)
High-power share
29% of DC fast sites are 150 kW-class or higher
Mix
54% DC fast / 46% Level 2 across 13 locations
Estimated DC ports
32 fast-charging ports city-wide

Charging networks in North Aurora

The following operators run public charging in North Aurora, ranked by number of locations.

Featured charging locations in North Aurora

A selection of higher-power public charging locations across North Aurora, sorted by power level.

  1. Genesis of North Aurora — North Aurora, IL, 60542 (Blink Network · DC Fast · 180 kW)
  2. Woodman's Markets - Tesla Supercharger — North Aurora, IL, 60542 (Tesla · DC Fast · 150 kW)
  3. Comfort Inn — North Aurora, IL, 60542 (UNIVERSAL · DC Fast · 90 kW)
  4. HomeTowne Studios & Conference Center Chicago – N Aurora/ Naperville — North Aurora, IL, 60542 (UNIVERSAL · DC Fast · 90 kW)
  5. Gerald Nissan - North Aurora — North Aurora, IL, 60542 (NAYAX_ENERGY · DC Fast · 54 kW)
  6. Gerald Nissan - North Aurora — North Aurora, IL, 60542 (IN_CHARGE · DC Fast · 50 kW)
  7. CHARGEPOINT01 DC FAST — North Aurora, IL, 60542 (ChargePoint Network · DC Fast · 24 kW)
  8. RIVER FRONT CP6000 — North Aurora, IL, 60542 (ChargePoint Network · Level 2 · 19.2 kW)
  9. Hardware Gastro Pub - Tesla Destination — North Aurora, IL, 60542 (Tesla Destination · Level 2 · 7.2 kW)
  10. My Place Hotel - North Aurora - Tesla Destination — North Aurora, IL, 60542 (Tesla Destination · Level 2 · 7.2 kW)
  11. Gerald Nissan - North Aurora — North Aurora, IL, 60542 (Non-Networked · Level 2 · 7.2 kW)
  12. NORTHAURORA EAST — North Aurora, IL, 60542 (ChargePoint Network · Level 2 · 6.5 kW)

Nearby cities with EV charging coverage

Other cities in Illinois we cover with full charging data and site profitability scoring — useful for comparing footprints across the state.

How profitability scores work

Every score on EV Data Map blends location demand, competition and operating economics into a single 0–100 number. Demand is modeled from registered EV count, commute and through-traffic patterns, daytime worker population, retail and hospitality footprint, and tourism inflows. Competition uses the count and quality of nearby existing chargers — including DC fast power, network reliability and dwell-fit. Operating economics include estimated electricity tariffs, demand-charge exposure, expected utilization, and capital cost for the recommended hardware mix.

For North Aurora specifically, our model accounts for local commute corridors, nearby interstate and US-highway traffic, the existing footprint of 7 DC fast and 6 Level 2 sites, and the typical dwell profile of the surrounding land use. The result is a per-address score plus a recommended configuration — number of stalls, target power level and network — that maximises projected revenue.

Frequently asked questions

How many EV charging stations are in North Aurora, Illinois?
There are 13 public electric vehicle charging locations in North Aurora, Illinois, with a combined 45 individual chargers. 7 locations offer DC fast charging and 6 provide Level 2 charging.
What is the largest EV charging network in North Aurora?
ChargePoint Network operates the most public charging locations in North Aurora with 4 sites, followed by Tesla Destination with 2 sites.
How much does it cost to install an EV charger in North Aurora?
Level 2 EV chargers in North Aurora typically install for $4,000–$12,000 per port including make-ready. DC fast installs run $80,000–$250,000+ per port depending on power level, utility upgrades and trenching.
What permits and incentives apply to EV chargers in North Aurora?
Most North Aurora projects need an electrical permit (and a building permit plus utility coordination for DC fast). Sites can typically stack the federal 30C tax credit (up to 30% / $100,000 per commercial charger in eligible census tracts) with Illinois state, utility and NEVI-funded programs.
How long does it take to install an EV charger in North Aurora?
A typical commercial Level 2 installation in North Aurora energizes in 4–8 weeks from site survey. DC fast installs run 4–9 months because of utility service upgrades, transformer lead times and switchgear.
How long does an EV charger in North Aurora take to become profitable?
Payback in North Aurora depends on utilization, electricity tariffs (especially demand charges) and incentives captured. Well-sited Level 2 stations typically reach payback in 3–5 years; DC fast sites with strong throughput in 3–6 years.

Related coverage